Adani Green Energy Limited · NSE:ADANIGREEN
Adani Green Energy — Investor Presentation (April 2019)
58 slides from Adani Green Energy's investor presentation, April 2019
Slide 1: Adani Green Energy Limited Analyst Presentation
Adani Green Energy Limited Analyst Presentation April 2019
Slide 2: Disclaimer
Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward- looking statements,” including those relating to general business plans and strategy of Adani Green Energy Limited (“AGEL”),the future outlook and growth prospects, and fu
Slide 3: Contents
Contents 01 Adani Group 1A About Adani Group 1B Project Execution 1C Adani Group Energy Presence 02 Adani Green Energy 2A Industry Overview & Growth Drivers 2B India’s Grid Infrastructure to integrate 175GW Renewable 2C Current Solar PV technology 2D Management & Our Project Execution Capabilities 2
Slide 4: 1. Adani Group
1.Adani Group STRICTLY CONFIDENTIAL
Slide 5: A. About Adani Group
1.Adani Group A. About Adani Group STRICTLY CONFIDENTIAL
Slide 6: Leading Infrastructure Conglomerate in India
Leading Infrastructure Conglomerate in India 4,560 MW Among Largest Renewable players in India Founded in 1988 by Mr Gautam Adani, Adani group has interests in power generation, coal 13,464 ckm Largest Private Transmission Player mining, trading, ports operations, logistics Sh Gautam Adani 205 MMT L
Slide 7: Case Study: AEL Value Creation ~30% CAGR over 25 Yrs
Case Study : AEL Value Creation ~ 30% CAGR over 25 Yrs After 2015 group IPO in Nov 1994 In 10 yrs from IPO In 20 yrs from IPO As on Date restructuring Adani Enterprises – 80 shares Adani Enterprises – 80 shares APSEZ – 113 shares Adani Enterprises – 1 Adani Enterprises – 40 shares Adani Enterprises
Slide 8: B. Project Execution
1.Adani Group B. Project Execution STRICTLY CONFIDENTIAL
Slide 9: Track Record of Delivering World Class Assets
Track Record of Delivering World Class Assets Leveraging Core Strengths Delivering World Class Assets Mega project developed, constructed Large scale businesses delivering and commissioned in 9 months consistent growth 648 MW Ultra Mega Location: Kamuthi, Tamilnadu Solar Power Plant Solar Ir
Slide 10: Mastered skill of executing complex infrastructure projects
Mastered skill of executing complex infrastructure projects Adani Group’s “Execution Engine” available to all Adani Group Companies Group has executed projects across multiple infrastructure sub-segments on a pan India level with strong presence in energy sector 1 2 RoW/Land Acquisition Regulato
Slide 11: C. Adani Group Energy Presence
1.Adani Group C. Adani Group Energy Presence STRICTLY CONFIDENTIAL
Slide 12: Largest Integrated Energy Player in India
Largest Integrated Energy Player in India End to End Integration in the Energy Value Chain Coal Business Panel Thermal Power Renewables Solar Park Trans. & Distribution Manufacturing Largest importer 1.2 GW Installed capacity ~2 GW operational ~2GW 50:50 JV Owns & operates & trader of Co
Slide 13: Key Stakeholder touchpoints across energy landscape in India
Key Stakeholder touchpoints across energy landscape in India Ministry of (conventional) Power (MoP) / Ministry of New & Renewable Energy Ministry (MNRE) Central Electricity Authority of India (CEA) Advisory Advisory arm of MoP on matters relating to the National Electricity Policy and formulating pl
Slide 14: 2. Adani Green Energy
2.Adani Green Energy STRICTLY CONFIDENTIAL
Slide 15: A. Industry Overview & Growth Drivers
2.Adani Green Energy A. Industry Overview & Growth Drivers STRICTLY CONFIDENTIAL
Slide 16: Industry Overview (1/2)
Industry Overview (1/2) India has significant headroom for power consumption growth Renewables’ overall share in power generation remains low Per capita power consumption 2016 (KWh) 3% 10% US: ~11x India 8% 12,071 China: ~4x India Thermal World: ~2.3x India Renewable 7,481 6,602 Hydro 4,475 Nuclear
Slide 17: Industry Overview (2/2)
Industry Overview (2/2) Growth Drivers – India achieves Grid Parity - Solar India’s Renewable Road Map CERC APPC - INR 3.50 / kwh 2018 2024 3.30 3.15 25% CAGR 2.44 2.47 2.44 2.48 ~27GW 106 GW Solar Feb-17 Apr-17 May-17 Dec-17 Jul-18 Mar-19 ~36 GW 58 GW Wind Growth Drivers – India achieves Grid Parit
Slide 18: Solar Sector – Paradigm Shift and Our Response
Solar Sector – Paradigm Shift and Our Response Past Dynamics of the sector What has changed today Solar penetration was only driven by RPO Technology and efficiency improvement, obligations decrease in module prices by ~ 60% Project Setup / Technology Higher plant setup costs, O&M costs, techn
Slide 19: Wind Sector – Paradigm Shift and Our Response
Wind Sector – Paradigm Shift and Our Response Past Dynamics of the sector What has changed today FIT was largely based on CUFs and existing WTG In 2017, majority bids were invited based on ISTS models being supplied by OEMs substations and tariff started coming down FIT Tariff Basis So, no inc
Slide 20: Competitive delivered cost of renewable power
Competitive delivered cost of renewable power Solar LCOE Drivers Wind LCOE Drivers 2.48 0.37 2.60 0.28 0.10 0.03 0.06 2.04 0.25 0.05 2.20 0.14 0.39 0.17 2018 Module Price Inverter BoP Land Cost 2027 LCOE Baseline 2018 Capex AEP Project Opex Low Wind Land Cost 2027 Baseline Life Sites LCOE Current
Slide 21: Hybrid technology driving RTC Solution
Hybrid technology driving RTC Solution Key Considerations for Hybrid Solar and Wind Power Plants characteristically generate power at different intervals and during complementary seasons This helps to ensure that the level of energy being fed into the grid is steadier than that of Wind or Solar
Slide 22: B. India's Grid Infrastructure to Integrate 175GW Renewable
2.Adani Green Energy B. India’s Grid Infrastructure will be able to Integrate the Targeted 175GW of Renewable Capacity STRICTLY CONFIDENTIAL
Slide 23: Proposed grid addition to absorb upcoming renewable capacity
Proposed grid addition to absorb upcoming renewable capacity Proposed CTU for 50 GW of incremental Solar 25 Additional CTU Phase I-upto Dec 20 Additional CTU Phase II-upto Dec 21 20 15 10 10 6 5 10 2.5 5 4 2.5 2.5 4 2.5 0 1 RJ AP 0 KA GJ MH MP Proposed CTU for 16.5 GW incremental Wind 8 Additional C
Slide 24: Scenario with Integration of 175 GW Renewable power
Scenario with Integration of 175 GW Renewable power (by FY 2021-22) Central Electricity Authority (CEA) recently conducted a study, and demonstrated that it is feasible to integrate the new renewable capacity, with various options Inter-Regional power flow during Peak demand (FY 2022) • WR and ER wi
Slide 25: Integration of 175 GW Renewable power – Option 1
Integration of 175 GW Renewable power - Without any burden on exchequer (Option 1) Grid balancing with Flexible Operation Step 1 - Reallocation of Hydro and Gas plant generation to peak hours Step 2 - Flexible power from Battery Storage Step 3 - Curtailment of Renewable Energy Source Minimum Thermal
Slide 26: Integration of 175 GW Renewable power – Option 2
Integration of 175 GW Renewable power - With additional compensation to Thermal power plants (Option 2) Grid balancing with Flexible Operation of Thermal Power plant without RE curtailment Flexible operation of Thermal power plant below technical minimum will lead to following: 1. Increase in Net He
Slide 27: C. Current Solar PV Technology allows plant life beyond 25 years
2.Adani Green Energy C. Current Solar PV Technology allows plant life well beyond the PPA life of 25 years STRICTLY CONFIDENTIAL
Slide 28: Solar PV modules have a life well beyond the PPA life
Solar PV modules have a life well beyond the PPA life of 25 years What is Module Degradation? Light Induced Degradation (LID), permanently degrades Year of installed life $ modules starting from the first ray of solar radiation and 70 extends further up to six months 60 Annual Degradation – Effi
Slide 29: D. Management & Project Execution Capabilities
2.Adani Green Energy D. Management & Project Execution Capabilities STRICTLY CONFIDENTIAL
Slide 30: Strong sponsor & professional management with strong execution track-record
Strong sponsor & professional management with strong execution track-record Professional Management Team Jayant Parimal Ashish Garg Rajesh Shrivatsava CEO CFO COO - Projects Mr. Jayant Parimal has been associated with Mr. Ashish Garg has been with AGEL Mr. Rajesh recently joined the group the
Slide 31: Project Execution – Key Strengths
Project Execution – Key Strengths •Leverage experience of dealing land & other statutory permissions from other similar business activities such as Transmission & Real estate Land •Identifying strategic land near substation to reduce cost of transmission line Acquisition •Strong In-house design team
Slide 32: Critical Success Factors for renewable project execution
Critical Success Factors for renewable project execution 1 2 3 Site Selection PPA Tie-up Project Execution Grid Connection Facilities Bidding/Bilateral negotiations Financial Closure Land Acquisition Pre bid Site tie up is ideal Site Preparation Resource potential Post bid, tight timel
Slide 33: Development Pipeline – Key Differentiating Factor for AGEL
Development Pipeline– Key Differentiating Factor for AGEL 20 GW Development Pipeline in Resource Rich areas Expected Wind growth is supported by ~5 GW of wind sites under self development Land applied for 75% of identified area. ‒ Ready sites to house Transmission Connectivity available for 1.8 GW f
Slide 34: Case Study 1: Kamuthi Solar Project
Case Study 1 : Kamuthi Solar Project Testament to our execution capabilities – Adani Group has developed the 648 MWAC (778 MWDC), world’s largest solar power plant at a single location spread over 2,340 acres situated in Kamuthi, Tamil Nadu – It was a mammoth execution undertaken in less than 9 mont
Slide 35: Case Study 2: Executed 33 projects amidst regulatory changes
Case Study 2: Executed 33 projects amidst regulatory changes Number of UC projects during GST and demonetization 1 Demonetization 2 GST Nov – Dec 2016 July 2017 Status of Projects during demonetization / GST 33 projects were under construction during demonetization, GST 1 1 These projects were s
Slide 36: Case Study 3a: AGEL - Punjab 100 MW Project Execution
Case Study 3a: AGEL - Punjab 100 MW Project Execution AGEL Punjab – Project Development Origination Design Sourcing Execution O&M Solar Plant design & Real time Site selection irradiation sourcing monitoring Value SolarGIS Sites with strong Efficient plant engineering database irradiation
Slide 37: Case Study 3b: Punjab 100 MW Project Operations
Case Study 3b: Punjab 100 MW Project Operations AGEL Punjab – Project Development GTI Solar % Achievement GTI Actual GIS P50 (Actual / 101.6% Solar irradiation (kWh/m2/year) 1,935 (kWh/m2/year) 1,965 Target) Stable Capacity Utilisation Factor (“CUF”) Grid Availability Plant Availability P75 99.9% P7
Slide 38: Source highest quality equipment from reputed OEMs
Source highest quality equipment from reputed OEMs Solar Modules Inverters and Trackers Best Vendors : Resilient and reliable supply from Tier-1 vendors, Inverters strategic relationship with 6 Super League Based on technological advancement and economic viability used No Technology Risk : Pro
Slide 39: Our O&M Philosophy
Our O&M Philosophy Cluster based operating model to ensure adequate support and governance at each site Operational Optimized module cleaning cycle by comparing revenue loss due to soiling against the cost of module cleaning Strategy Maintenance and Operational Excellence based on real time da
Slide 40: RONC – World Class Monitoring and Analytics
RONC – World Class Monitoring and Analytics RONC (Remote Operations Nerve Center) RONC Benefits RONC Operational Flow Ability to manage large Centralization of overall management of all Centralized number of sites Adani sites from a single location Support increasingly Site(s) Level Data Captu
Slide 41: E. Portfolio and Operational Details
2.Adani Green Energy E. Portfolio and Operational Details STRICTLY CONFIDENTIAL
Slide 42: Adani Green – Holding Structure
Adani Green – Holding Structure Holding Structure Details Demerged from AEL on 1st April 2018 Promoter Public Listed on 18th June 2018 Market Capitalization1 INR 5,802 Cr 86.58% 13.42% 9M’19 Revenue2 – INR 1,412 cr Solar Wind Hybrid EBITDA2 – INR 1,275 cr # SPVs 15 # SPVs 8 # SPVs 1 Assets – I
Slide 43: Pan India Portfolio
Pan India Portfolio Revenue Split by Counterparties Punjab Operational Full Portfolio 100 Uttar Pradesh 10% Rajasthan 19% 640 20 34% 50 225 Gujarat 51% 1,325 60 26% 12 51% 5% 4% NTPC SECI A & above B+ & below 100 Maharashtra 20 100 50 Karnataka 810 Tamil Nadu Locations 648 Operational Particulars So
Slide 44: Development Risk Profile improving
Development Risk Profile improving Additional Future Projects + Operational UC 4,560 4,560 1,790 2,590 2,570 2,000 612 4,560 1,192 2,770 798 1,958 1,970 485 808 313 FY16 FY17 FY18 FY19 FY20E FY21E In the forecast period given, AGEL is planning investments in international markets, primarily in the
Slide 45: Actual Operational Performance
Actual Operational Performance Capacity (MW AC) PLF % (AC) Solar Wind 1,898 1,898 Solar Wind 1,744 29.81% 30.96% 21.14% 22.35% 21.66% 18.55% 18.25% 21.68% 19.69% 20.08% 858 16.36% 648 648 668 13.87% 13.53% 8.33% 60 60 60 60 60 60 72 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18 Q1 FY19 Q2 FY19 Q3 FY19 Q1 FY18 Q2
Slide 46: 1.9 GW Solar Portfolio Operational Bridge
1.9 GW Solar Portfolio Operational Bridge Actual to Technical Estimates* Estimated Quarterly CUF for 1.9 GWAC Portfolio March’19 Target CUF Achieved CUF 33.00% 28.64% 28.00% 23.68% 24.22% 21.56% 23.00% 25.89% 18.00% 21.68% 21.66% 20.08% Q1FY'19 Q2FY'19 Q3FY'19 Q4FY'19 FY’19 AGEL has almost achieved
Slide 47: Financial Summary – Income Statement
Financial Summary – Income Statement Particulars (INR Cr) FY17 FY18 9M19 Revenue from Power Sale only 496 939 1,377 Other income 80 46 35 Total Revenue 577 986 1,412 O&M 50 75 74 Other Expenses 48 51 63 Total Expenses 98 126 137 EBITDA 479 8602 1,275 EBITDA % 83.0% 87.2% 90.3% Depreciation 333 543 7
Slide 48: Financial Summary – Balance Sheet
Financial Summary – Balance Sheet Particulars (INR cr) FY17 FY18 6M FY19 Assets Non Current Assets PPE 4,340 7,983 10,271 CWIP 267 1,659 737 Intangible 1 1 1 Financial Assets 114 215 465 Deferred Tax Assets 138 215 349 Other Non Current Assets 96 416 490 Current Assets Inventories 0 15 138 Trade Rec
Slide 49: Profitable growth leading to superior returns
Profitable growth leading to superior returns Completed / Average Expected Project Capacity Revenue^ EBITDA$ Tariff Cost# Capex / EBITDA (in MW) (in Rs Cr) (in Rs Cr) (in Rs/kWh) (in Rs Cr) Operational Solar 1,898 5.07 12,540 2,135 2,044 6.13 Wind 72 4.06 455 79 72.56 6.27 Total 1,970 5.04 12,995 2,
Slide 50: F. Financing Philosophy
2.Adani Green Energy F. Financing Philosophy STRICTLY CONFIDENTIAL
Slide 51: Capital Structure as enabler for growth
Capital Structure as enabler for growth Efficient refinancing to unlock cash flows Debt Philosophy for growth 100% Pool with NTPC – 370 MW (40%) SECI – 160 MW (17%) Project debt self-amortizing before end of contracted diversified State DISCOMs with A rated or more – 160 life Counterparty MW (
Slide 52: G. Compelling Investment Opportunity
2.Adani Green Energy G. Compelling Investment Opportunity STRICTLY CONFIDENTIAL
Slide 53: AGEL: A Compelling Investment Opportunity
AGEL: A Compelling Investment Opportunity Adani group is a leader in infrastructure –ports, T&D, thermal power and renewables 1. Infrastructure lineage Proven track record of excellence in development & construction India plans to grow renewables from 75GW to 175GW in next few years 2. Signifi
Slide 54: Thank You
Thank You STRICTLY CONFIDENTIAL
Slide 55: Appendix: List of Annexures
APPENDIX List of Annexures STRICTLY CONFIDENTIAL
Slide 56: Asset Level Details - Operational
Wind Projects Solar Asset Level Details - Operational Hybrid SPV Project Name / Location Type Capacity (AC) Tariff COD Counterparty Name Credit Rating Term AGETNL Solar 216 7.01 Mar-16 TANGEDCO ICRA (B) 25 RSPL Solar 72 7.01 Feb-16 TANGEDCO ICRA (B) 25 AGETNL KREL Solar 72 5.761&2 Mar-16 TANGEDCO IC
Slide 57: Asset Level Details – Under Construction
Wind Projects Asset Level Details – Under Construction Solar Hybrid Project Name / SPV Type Capacity (AC) Tariff COD Counterparty Location Name Credit Rating Term ARERJL Rajasthan Solar 200 2.71 Aug-19 MSEDCL ICRA (B+) 25 AGEUPL Jhansi Solar 50 5.075 Apr-19 UPPCL ICRA (C) 25 AGEONEL Gujarat Solar 15
Slide 58: AGEL: International Opportunity
AGEL: International Opportunity Vietnam Vietnam Project Name MIDLAND HARTSEL HUNTER SIGURD US Total Solar Wind Project Capacity 72.1 72 100 80 324.1 38.1 MWac 27.2 MW (MWac) South Location Colorado Utah Utah Ninh Thuan Province Carolina Expected Project Jul-20 Dec-22 Dec-20 Dec-20 Dec-20 Dec-20 CoD