Catalyst Metals Limited · ASX:CYL

Catalyst Metals — Investor Presentation (July 2011)

26 slides from Catalyst Metals's investor presentation, Jul 20, 2011

  1. Slide 1: Investor Presentation July 2011

    For personal use only Investor Presentation July 2011

  2. Slide 2: Company Objectives

    Catalyst Metals Ltd For personal use only Company Objectives  To create shareholder value by pursuing advanced gold and metals projects  Goal is to generate cashflows from operations within 2 years  Progress the flagship Four Eagles Gold Project in Victoria from early exploration success to an ad

  3. Slide 3: Current Projects

    Current Projects For personal use only Four Eagles Gold Project (Victoria)  Joint venture exploration for a potential new Bendigo‐style goldfield below shallow cover Minnie Springs Project (Western Australia)  Molybdenum and Tungsten mineralisation in the Gascoyne Mineral Field Everton Project (Vi

  4. Slide 4: Four Eagles Gold Project location

    Four Eagles Gold Project For personal use only NSW 230,000mE 250,000mE 270,000mE  Located along major fault VICTORIA EL5295 extension from Bendigo Four Eagles 6,000,000mN goldfield Prospective Target Mitiamo  Prospective rocks concealed EL4525 Tandarr Wh itel 5,980,000mN by shallow cover Gold depo

  5. Slide 5: North Bendigo Tenements

    North Bendigo Tenements For personal use only 230,000mE 250,000mE 270,000mE 290,000mE NORTH V I C T O R I A NSW EL5295 6,000,000mN Echuca Four Eagles Prospective Mitiamo Target Tandarr EL4525 Lockington Whitela 5,980,000mN a w Rochester F Tandarra Project Fault Gold deposit/ occurrence 5,960,000mN T

  6. Slide 6: Bendigo: historic gold production

    Bendigo: historic gold production For personal use only

  7. Slide 7: Bendigo: a world-class gold target

    Bendigo: a world-class gold target For personal use only New Chum Line Bendigo Goldfield 7.3mt @14.5g/t Au Nell (3,390,000oz) Gwynne Line Lines Garden Gully Line 4.6mt @14.1g/t Au of Lode e (2,080,000oz) ction Zon BENDIGO Hustlers Line 1.6mt @17.6g/t Au o du (918,000oz) Historical Pr URBAN Total Pro

  8. Slide 8: Actual Cross Section: with Hypothetical Cover Sequence

    Actual Cross Section: with Hypothetical Cover Sequence For personal use only Bendigo Goldfield (after Boucher et al)  Associated with anticlinal axis  Importance of slate beds  Difficult drilling targets

  9. Slide 9: Bendigo Target Size

    Bendigo Target Size For personal use only Sheepshead Anticline (South) Line of Lode Bendigo SOUTH NORTH -500RL -1000RL PRODUCTION Approx. 1.4 million tonnes LEGEND @ 12 g/t Au (550,000 ozs) -1500RL Mineralised ribbon Historic Stoping 0 1000 Metres 123500mN 124500mN 125500mN 126500mN

  10. Slide 10: Bendigo Target Size

    Bendigo Target Size For personal use only New Chum Line of Reef Bendigo SOUTH 0mRL PRODUCTION -500mRL 7.3 million tonnes @ 14.5 g/t Au (3.4 million ozs) -1000mRL NORTH 0mRL -500mRL LEGEND 0 500 Historic Stoping Shaft Metres -1000mRL

  11. Slide 11: For personal use only

    Four Eagles Gold Project For personal use only

  12. Slide 12: For personal use only

    Four Eagles Gold Project For personal use only

  13. Slide 13: For personal use only

    Four Eagles Gold Project For personal use only

  14. Slide 14: For personal use only

    Four Eagles Gold Project For personal use only  No outcrop of prospective rocks  Catalyst drills first ever diamond drillhole on the property in March 2011  Previously only aircore drilling

  15. Slide 15: Drill Cross Section

    Four Eagles Drill Cross Section For personal use only

  16. Slide 16: Drillhole FE328

    Four Eagles Gold Project For personal use only Drillhole FE328, 123m to 129m depth 5mm

  17. Slide 17: Proposed Program 2011

    Four Eagles Gold Project For personal use only Proposed Program 2011  Minimum expenditure $450,000  Aircore drilling over entire strike length  Phase 1: March to April 2011 – 7,913 metres completed  Phase 2: October to November 2011  Angled diamond drilling of gold zones and structure  Phase 1

  18. Slide 18: For personal use only

    Four Eagles Gold Project For personal use only

  19. Slide 19: For personal use only

    Four Eagles Gold Project For personal use only

  20. Slide 20: Heads of Agreement

    Four Eagles Gold Project For personal use only Heads of Agreement Phase 1  $450,000 exploration spend over 12 months  $150,000 cash  750,000 CYL shares Phase 2  $2,100,000 exploration spend (inclusive of Phase 1 exploration) over 3 years to earn 50% interest in project  $100,000 cash  750,000

  21. Slide 21: Minnie Springs Project, W.A.

    Minnie Springs Project, W.A. For personal use only 380,000mE 400,000mE 420,000mE Catalyst Metals Tungsten in Rock (%W) Gascoyne Mo-W >0.5% 0.05 - 0.5% Project 7,336,200mE <0.05% 0 200 7,340,000mN Metres 7,335,800mE E0901776 E0901174 389,400mE 389,800mE Nina Tungsten Project 7,320,000mN 4 23m @ 0.16%

  22. Slide 22: Everton Project, Victoria

    Everton Project, Victoria For personal use only 0 mN 9,570,00 462,100 462,200 462,300 Visible Molybdenum mE mE mE Beechworth Rock sample points 5,000 to 18,400 Wangaratta 1,000 to 5,000 qua 500 to 1,000 rry lim 0 to 500 EL4866 it Mine adit Everton Historic workings Felsic Intrusive Sediments Canberr

  23. Slide 23: Catalyst Capital Structure

    Catalyst Capital Structure For personal use only Capital Structure (ASX:CYL)  39,088,226 fully paid ordinary shares – 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 1,000,000 unlisted 30 cent options expiring 30/06/2015  Top 40 control approximately 84% of issued capital Cash in hand  A

  24. Slide 24: Corporate Structure - Directors

    Corporate Structure - Directors For personal use only Stephen Boston – Non‐executive Chairman The principal of a Perth‐based private investment group specialising in the Australian resources sector. Previously worked as a Stockbroker from 1984 to 1998 in Perth and Sydney. Bruce Kay – Non‐executive D

  25. Slide 25: Corporate Structure

    Corporate Structure For personal use only Advisors John Arbuckle – Corporate Advisor John is an accountant with extensive experience in the resources industry in Australia and overseas. Currently he operates a corporate advisory business that provides corporate and capital financing advice to resour

  26. Slide 26: Disclaimer and Forward Looking Statements

    Disclaimer and Forward Looking Statements For personal use only  This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purpo