Slide 1: Investor Presentation July 2011
For personal use only Investor Presentation July 2011
Slide 2: Company Objectives
Catalyst Metals Ltd For personal use only Company Objectives To create shareholder value by pursuing advanced gold and metals projects Goal is to generate cashflows from operations within 2 years Progress the flagship Four Eagles Gold Project in Victoria from early exploration success to an ad
Slide 3: Current Projects
Current Projects For personal use only Four Eagles Gold Project (Victoria) Joint venture exploration for a potential new Bendigo‐style goldfield below shallow cover Minnie Springs Project (Western Australia) Molybdenum and Tungsten mineralisation in the Gascoyne Mineral Field Everton Project (Vi
Slide 4: Four Eagles Gold Project location
Four Eagles Gold Project For personal use only NSW 230,000mE 250,000mE 270,000mE Located along major fault VICTORIA EL5295 extension from Bendigo Four Eagles 6,000,000mN goldfield Prospective Target Mitiamo Prospective rocks concealed EL4525 Tandarr Wh itel 5,980,000mN by shallow cover Gold depo
Slide 5: North Bendigo Tenements
North Bendigo Tenements For personal use only 230,000mE 250,000mE 270,000mE 290,000mE NORTH V I C T O R I A NSW EL5295 6,000,000mN Echuca Four Eagles Prospective Mitiamo Target Tandarr EL4525 Lockington Whitela 5,980,000mN a w Rochester F Tandarra Project Fault Gold deposit/ occurrence 5,960,000mN T
Slide 6: Bendigo: historic gold production
Bendigo: historic gold production For personal use only
Slide 7: Bendigo: a world-class gold target
Bendigo: a world-class gold target For personal use only New Chum Line Bendigo Goldfield 7.3mt @14.5g/t Au Nell (3,390,000oz) Gwynne Line Lines Garden Gully Line 4.6mt @14.1g/t Au of Lode e (2,080,000oz) ction Zon BENDIGO Hustlers Line 1.6mt @17.6g/t Au o du (918,000oz) Historical Pr URBAN Total Pro
Slide 8: Actual Cross Section: with Hypothetical Cover Sequence
Actual Cross Section: with Hypothetical Cover Sequence For personal use only Bendigo Goldfield (after Boucher et al) Associated with anticlinal axis Importance of slate beds Difficult drilling targets
Slide 9: Bendigo Target Size
Bendigo Target Size For personal use only Sheepshead Anticline (South) Line of Lode Bendigo SOUTH NORTH -500RL -1000RL PRODUCTION Approx. 1.4 million tonnes LEGEND @ 12 g/t Au (550,000 ozs) -1500RL Mineralised ribbon Historic Stoping 0 1000 Metres 123500mN 124500mN 125500mN 126500mN
Slide 10: Bendigo Target Size
Bendigo Target Size For personal use only New Chum Line of Reef Bendigo SOUTH 0mRL PRODUCTION -500mRL 7.3 million tonnes @ 14.5 g/t Au (3.4 million ozs) -1000mRL NORTH 0mRL -500mRL LEGEND 0 500 Historic Stoping Shaft Metres -1000mRL
Slide 11: For personal use only
Four Eagles Gold Project For personal use only
Slide 12: For personal use only
Four Eagles Gold Project For personal use only
Slide 13: For personal use only
Four Eagles Gold Project For personal use only
Slide 14: For personal use only
Four Eagles Gold Project For personal use only No outcrop of prospective rocks Catalyst drills first ever diamond drillhole on the property in March 2011 Previously only aircore drilling
Slide 15: Drill Cross Section
Four Eagles Drill Cross Section For personal use only
Slide 16: Drillhole FE328
Four Eagles Gold Project For personal use only Drillhole FE328, 123m to 129m depth 5mm
Slide 17: Proposed Program 2011
Four Eagles Gold Project For personal use only Proposed Program 2011 Minimum expenditure $450,000 Aircore drilling over entire strike length Phase 1: March to April 2011 – 7,913 metres completed Phase 2: October to November 2011 Angled diamond drilling of gold zones and structure Phase 1
Slide 18: For personal use only
Four Eagles Gold Project For personal use only
Slide 19: For personal use only
Four Eagles Gold Project For personal use only
Slide 20: Heads of Agreement
Four Eagles Gold Project For personal use only Heads of Agreement Phase 1 $450,000 exploration spend over 12 months $150,000 cash 750,000 CYL shares Phase 2 $2,100,000 exploration spend (inclusive of Phase 1 exploration) over 3 years to earn 50% interest in project $100,000 cash 750,000
Slide 21: Minnie Springs Project, W.A.
Minnie Springs Project, W.A. For personal use only 380,000mE 400,000mE 420,000mE Catalyst Metals Tungsten in Rock (%W) Gascoyne Mo-W >0.5% 0.05 - 0.5% Project 7,336,200mE <0.05% 0 200 7,340,000mN Metres 7,335,800mE E0901776 E0901174 389,400mE 389,800mE Nina Tungsten Project 7,320,000mN 4 23m @ 0.16%
Slide 22: Everton Project, Victoria
Everton Project, Victoria For personal use only 0 mN 9,570,00 462,100 462,200 462,300 Visible Molybdenum mE mE mE Beechworth Rock sample points 5,000 to 18,400 Wangaratta 1,000 to 5,000 qua 500 to 1,000 rry lim 0 to 500 EL4866 it Mine adit Everton Historic workings Felsic Intrusive Sediments Canberr
Slide 23: Catalyst Capital Structure
Catalyst Capital Structure For personal use only Capital Structure (ASX:CYL) 39,088,226 fully paid ordinary shares – 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 1,000,000 unlisted 30 cent options expiring 30/06/2015 Top 40 control approximately 84% of issued capital Cash in hand A
Slide 24: Corporate Structure - Directors
Corporate Structure - Directors For personal use only Stephen Boston – Non‐executive Chairman The principal of a Perth‐based private investment group specialising in the Australian resources sector. Previously worked as a Stockbroker from 1984 to 1998 in Perth and Sydney. Bruce Kay – Non‐executive D
Slide 25: Corporate Structure
Corporate Structure For personal use only Advisors John Arbuckle – Corporate Advisor John is an accountant with extensive experience in the resources industry in Australia and overseas. Currently he operates a corporate advisory business that provides corporate and capital financing advice to resour
Slide 26: Disclaimer and Forward Looking Statements
Disclaimer and Forward Looking Statements For personal use only This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purpo