Raiden Resources Limited · ASX:RDN

Raiden Resources — Investor Presentation (June 2022)

19 slides from Raiden Resources's investor presentation, June 2022

  1. Slide 1: Raiden Resources Investor Presentation

    RAIDEN RESOURCES INVESTOR PRESENTATION June 2022 ASX:RDN DAX:YM4

  2. Slide 2: Disclaimer

    Disclaimer CAUTIONARY AND FORWARD-LOOKING STATEMENTS COMPETENT PERSON STATEMENT Certain statements contained in this presentation, and in certain documents incorporated by The information in this announcement that relates to exploration results at the Mt Sholl Project is reference in this presentati

  3. Slide 3: Corporate Overview

    Corporate Overview BOARD OF DIRECTORS & MANAGEMENT CAPITAL STRUCTURE TOP HOLDERS MICHAEL DAVY - Non-Executive Chairman MARKET CAP ~$11.3M SHAREHOLDER Top 20 ~56% Australian business executive with extensive experience in the Australian oil, gas and resources sector. Mr Davy is at A$0.008 (22/06/2022

  4. Slide 4: Industry Constraints & Challenges

    Industry Constraints & Challenges 2022 ➢ Lack of sustained greenfield exploration programs over last decade • Majority of exploration focused on brown-fields & resulted in only incremental resource replenishment ➢ Longer development lead times • The median value of the overall lead time (last explor

  5. Slide 5: EV Sales Worldwide and Metal Demand

    EV Sales Worldwide and Metal Demand 2022 • In 2019, 2.2 million electric cars were sold, representing just 2.5% of global car sales. • In 2020, the overall car market contracted but electric car sales bucked the trend, rising to 3 million and representing 4.1% of total car sales. • In 2021, electric

  6. Slide 6: Copper Supply Capacity and Demand

    Copper Supply Capacity and Demand 2022 • S&P Global Market Intelligence predicts mined copper production to rise to 21.87Mt and 26.14Mt in 2021 and 2025 • Production from existing copper mines, including concentrate and solvent extraction-electrowinning, is expected to increase at a CAGR of 1.0% in

  7. Slide 7: Portfolio Overview

    Portfolio Overview SUBSTANTIAL GLOBAL Cu-Au LANDHOLDING IN RAPIDLY EMERGING PROVINCES & Ni-Cu-Co-PGE ADVANCED PROJECTS ▪ Advanced Ni-Cu-Co-PGE deposit in the Pilbara ▪ Key projects located near infrastructure (past producers & new developments) ▪ European portfolio includes major porphyry-epithermal

  8. Slide 8: Mt Sholl Overview

    Mt Sholl Overview SUBSTANTIAL DEPOSIT IN THE PILBARA ▪ Located in one of the best mining jurisdiction in the world ▪ Located near infrastructure (past producers & new developments) ▪ Raiden consolidated majority of entire district and along strike potential ▪ Outcropping Ni-Cu-Co-PGE deposits & open

  9. Slide 9: Mt Sholl – Advanced Magmatic Ni-Cu-Co-PGE Project

    Mt Sholl – Advanced Magmatic Ni-Cu-Co-PGE Project OVERVIEW • Located 22km south-east of Karratha and 11km to the north-east of the Radio Hill historical mine. • A total of 677 drill holes for 79,637m of historical drilling completed to date across the project area • Three deposits drill-defined to d

  10. Slide 10: Mt Sholl – Infrastructure

    Mt Sholl – Infrastructure OVERVIEW • Road access through the Mt Sholl property • Railway 3km west of the property • Multiple power sources as close as 3 km from the property • 22km south of the Karratha mining support city • Port of Dampier located within 25km • Excellent Supply Chain and Product Sh

  11. Slide 11: Mt Sholl– B2 Deposit

    Mt Sholl– B2 Deposit Drillhole From (m) To (m) Length (m) Ni_Eq (% Ni) SB2RC002 31 61 30 1.420 06B2DD065 31 55 24 2.151 71SD6 27.4 88.4 61 0.764 B2RC060 102 130 28 1.295 B2RC054 111 132 21 1.218 B2RC056 107 134 27 1.235 B2RC064 109 133 24 1.185 B2 Long-Section looking NW showing sustained mineralisa

  12. Slide 12: Mt Sholl– B2 Deposit

    Mt Sholl– B2 Deposit B2 Deposit X-Section (looking Southwest) drilling defined 0.2% B2 Deposit X-Section (looking Southwest) drilling defined 0.2% Ni_Eq shell dashed in red Ni_Eq shell dashed in red RAIDEN RESOURCES INVESTOR PRESENTATION 12

  13. Slide 13: Mt Sholl– B1 Deposit

    Mt Sholl– B1 Deposit B1 Deposit Long-Section (looking Northwest) drilling defined 650m long 0.2% Significant drill intercepts on the B1 deposit: Ni_Eq shell dashed in red Drillhole From (m) To (m) Length (m) Ni_Eq (%Ni) B1RC164 76 129 53 0.648 B1RC163 88 114 26 1.087 B1RCD120 81 114 33 0.764 B1RC102

  14. Slide 14: Mt Sholl– A1 Deposit

    Mt Sholl– A1 Deposit Significant drill intercepts on the A1 deposit: Drillhole From (m) To (m) Length (m) Ni_Eq (%Ni) A1RC11 136 154 18 1.806 06RZDD001 113.1 133 19.9 1.319 A1RC14 118 138 20 0.761 A1RC6 150 168 18 1.331 A1RC4 89 116 27 0.568 A1RC9 60 81 21 0.812 07RZRC007 25 51 26 0.620 • At A1, onl

  15. Slide 15: Mt Sholl– Kudos Prospect

    Mt Sholl– Kudos Prospect Significant drill intercepts on Kudos Prospect: Drillhole From (m) To (m) Length(m) Ni_Eq (Ni%) SRRC43A 116 138 22 0.642 SRRC44 154 163 9 1.044 SRRC51 94 117 23 0.708 SRRC52 130 154 24 0.927 SRRC53 159 177 18 1.184 SRRC56 104 121 17 0.761 SRRC57 121 149 28 0.668 ➢ Kudos Depo

  16. Slide 16: Arrow Project - Comparison to Hemi Deposit

    Arrow Project - Comparison to Hemi Deposit Arrow – Hemi Comparison ✓ Along Strike Of Hemi Deposit ✓ Hosted within Malina formation ✓ Associated with Berghaus shear ✓ Defined by multi-element (Au-As-Sb) geochemical anomalies ✓ Altered metasediments and associated Indee RAIDEN RESOURCES INVESTOR PRESE

  17. Slide 17: Western Tethyan – Tier 1 porphyry-epithermal potential

    Western Tethyan – Tier 1 porphyry-epithermal potential 17

  18. Slide 18: Key Investment Highlights

    Key Investment Highlights 1❑ A large, outcropping, Ni-Cu-Co-PGE sulphide JORC Exploration Target defined at Mt Sholl. ❑ 2 Historical data indicates mineralisation is open along strike and to depth. Significant and untested exploration potential outside of known deposits ❑ Planning for JORC resource

  19. Slide 19: Dusko Ljubojevic (Managing Director)

    DUSKO LJUBOJEVIC (Managing Director) E: dusko@raidenresources.com.au A: Suite 7, 63 Shepperton Road, Victoria Park, WA AUS 6100

Raiden Resources — Investor Presentation (June 2022) on 6ix