Sinclair Gold Ltd · ASX:SGC
Sinclair Gold — Alicanto Minerals — Investor Presentation (May 2017)
16 slides from Sinclair Gold's investor presentation, May 2017

Slide 1: An emerging greenstone gold belt
An emerging greenstone gold belt Guyana | South America ASX Code | AQI

Slide 2: General Information & Disclaimer
A L I C A N T O MI NE RALS L IMI TE D General Information & Disclaimer This presentation has been prepared for the purposes of providing information to the recipient regarding Alicanto Minerals Limited (Alicanto or the Company). It does not, and does not purport to, contain all the information that

Slide 3: Corporate snapshot, board and management
A L I C A N T O MI NE RALS L IMI TE D ASX Code: AQI 0.50 3000 Shares on issue 85.3m 0.45 Current Share Price (as of 10 May 2017) 17.5¢ 0.40 2500 Current Market Capitalisation A$14.9m Share Price (A$) 0.35 2000 Volume (000's) Top 20 Holders +71% 0.30 Board & Management +20% 0.25 1500 0.20 1000 Experi

Slide 4: Guyana: mining friendly jurisdiction, underexplored Guiana Shield
A L I C A N T O MI NE RALS L IMI TE D 690koz pa gold production West Africa host to over 275Moz Au • Gold is Guyana’s largest export Substantial portion discovered in last 15 years Mining friendly Government Guiana Shield is VERY underexplored relative to West Africa • Open to foreign Investment Eng

Slide 5: Bulk of Guyana's production just scratching the surface
A L I C A N T O Bulk of Guyana’s production just scratching the surface MI NE RALS L IMI TE D ▪ Over 9moz of gold output in last 25 years - >60% from artisanal mining; ▪ Large scale mining output disproportional due to limited modern exploration investment; ▪ Steadily increasing gold output from nea

Slide 6: Arakaka and Ianna Gold Projects infrastructure
A L I C A N T O MI NE RALS L IMI TE D Arakaka Gold Project ▪ All Season Road Network; ▪ Daily Commercial Flights; ▪ Deep Water Port – Kaituma; ▪ Existing 55 Man Camp. Ianna Gold Project ▪ Existing Air Strip; ▪ Roads and Drill Site Access; ▪ River Landing; ▪ Existing 35 Man Camp. Port Kaituma – Deep

Slide 7: Barrick option to earn-in to 65% of Arakaka Gold Project
A L I C A N T O MI NE RALS L IMI TE D Option to earn-in to a 65% interest in the Arakaka Gold Project based on meeting total funding requirements of US$10.0 million, including:- ▪ US$2.5m budget including 7,500m drilling for 2017, approved for 2nd year expenditure, and counts towards a total; ▪ US$8

Slide 8: Arakaka prospect areas and results map
A L I C A N T O MI NE RALS L IMI TE D 14-Mile Area 5 km Pepperpot Area 4m @ 21.08g/t Au 5.1m @ 3.97g/t Au from 71m 9m @ 1.89g/t Au 9.7m @1.44 incl. 2m @ 5.23g/t Au 7m @ 1.81g/t Au 2m @ 4.17g/t Au (end of hole) Purple Heart Area Multiple Un-drilled Prospects 13.5m @ 7.36g/t Au from 87m 48m @ 1.84g/t

Slide 9: 2016-17 Drilling Summary
A L I C A N T O MI NE RALS L IMI TE D 2016 -17 DRILLING SUMMARY N Three Parallel Mineralised Structures Identified; Multiple Occurrences of Free Gold in Drilling; Drilling confirms up to 1.5km width and 10km strike; Potential for >30km combined strike extent of Targets. ASX Code | AQI www.alicantomi

Slide 10: 2017 Exploration Success
A L I C A N T O MI NE RALS L IMI TE D 2017 EXPLORATION SUCCESS Peak Trench: 6m @8.33g/t gold Peak Rock Chip Values: 162g/t, 33.7g/t, & 28.1g/t gold Peak Auger Values: 10g/t, 3.7g/t, & 2.8g/t gold Peak Soil Values: 6.9g/t, 2.09g/t, & 1.89g/t gold Anomalism and Drilled Mineralisation remains open ende

Slide 11: Multiple High Grade Prospects, Insufficient Drilling
A L I C A N T O MI NE RALS L IMI TE D Multiple High Grade Prospects Insufficient Drilling 5 km ■ >20km of alluvial workings downstream; ■ Numerous underground workings; ■ Multiple saprolite pits up to >600m long; ■ Peak soil values: 6.9g/t, 2.09g/t, & 1.89g/t Au; ■ Peak drill result of 8.87 g/t gold

Slide 12: Ianna target area highlights
A L I C A N T O MI NE RALS L IMI TE D N Highlights include: ■ Two extensive mineralised corridors; ■ “Walk up” drill targets extending over 7km of strike extent; Kings Ransom Target Area: 2km ■ Historical drilling has already delivered RC Drilling to: 12m @ 3.99g/t Au multiple mineralised intercepts

Slide 13: Bushmaster and Labaria prospects
A L I C A N T O MI NE RALS L IMI TE D ■ Over 12,400m’s Reverse Circulation and Soil Sampling to 926m’s Diamond drilling historically; Bushmaster Prospect 66.86g/t Au Undrilled 1km ■ Limited strike extent drilling remaining Money Pit: N open along strike; Undrilled ■ ~95% of drilling testing continui

Slide 14: Arakaka US$2.5m approved 2017 expenditure
A L I C A N T O Arakaka Gold Project US$2.5m approved 2017 expenditure MI NE RALS L IMI TE D ▪ Arakaka Drilling Campaign - 7,500m:- o 2,209m diamond drilling - 14 mile reconnaissance; Complete – Assays Pending o Prospect rating and ranking; In Progress, finalise with assays o ~1,000m Initial drill t

Slide 15: Investment summary
A L I C A N T O MI NE RALS L IMI TE D ■ Arakaka Gold Project – Currently progressing a 7,500m drilling program for 2017; ■ Total funding requirement of US$10m over four years for Barrick to acquire a 65% interest in Arakaka:- o Barrick funded exploration program: US$2.5m in 2017; o Alicanto the proj

Slide 16: Registered Office and Guyana Office
A L I C A N T O MI NE RALS L IMI TE D Registered Office Guyana Office 288 Churchill Avenue 63 Middle and Main Street, Subiaco WA 6008 North Cummingsburg, Georgetown, Guyana Telephone:+ 61 8 6489 0700 Facsimile: + 61 8 6489 0710 Email: admin@alicantominerals.com.au Website: www.alicantominerals.com.a
Source: Internet Archive copy of alicantominerals.com.au
More decks from Sinclair Gold Ltd
Precious Metals Summit: Zurich 202620 slides · Nov 9, 2026
Macquarie WA Forum 202620 slides · Nov 5, 2026
Investor Presentation (October 2026)31 slides · Oct 19, 2026
Mining Forum Americas 202623 slides · Sep 28, 2026
Investor Presentation (September 2026)20 slides · Sep 14, 2026
Diggers and Dealers 202615 slides · Aug 3, 2026