Fortescue Ltd · ASX:FMG

Fortescue — Fortescue Metals Group — IMARC 2015

25 slides from Fortescue's conference presentation, Nov 12, 2015

  1. Slide 1: Delivering results through innovation

    Delivering results through innovation IMARC, 12 November 2015

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Disclaimer Important Notice Additional Information The purpose of this presentation is to provide general information about This presentation should be read in conjunction with the Annual Financial Fortescue Metals Group Limited ("Fortescue"). It is not recommended that Re

  3. Slide 3: Building a world class company

    Building a world class company Core supplier to Asia’s growth Founded First ore Low cost in 2003 in 2008 producer Shipped over 165mt 580mt Production rate Unique culture 3

  4. Slide 4: World class assets: Pilbara

    World class assets Core supplier to Asia’s growth World’s best Pilbara address for Western Australia iron ore

  5. Slide 5: Our Vision: The safest, lowest cost, most profitable iron ore producer

    Our Vision: The safest, lowest cost, most profitable iron ore producer 4: Ww Fortescue Integrity Determination Set yourself Enthusiasm Empowerment Generating ideas Frugality

  6. Slide 6: Safety is at the heart of Fortescue's values

    Safety is at the heart of Fortescue’s values My brothers’ / sisters’ keeper • Safety Priorities 1 Look after yourself 2 Look after your mates • Engagement active participation • Empowerment to make decisions • Encouragement to speak up • Leadership strong and visible 6

  7. Slide 7: Mining industry productivity declining…

    Mining industry productivity declining… Productivity in mining compared to Australian Industry Labour Productivity Capital Productivity 150 110 130 100 90 110 80 90 70 70 60 50 50 Mining Australian Industry Mining Australian Industry Australian Industry comprises: Agriculture, Forestry & Fishing; Mi

  8. Slide 8: Culture of innovation

    Innovation focus Across every area of the business Product Culture of Cost journey innovation Costs Mine life Products matched Exploration Community customer needs and future engagement projects 8

  9. Slide 9: Built on innovation

    NG roresce Built on innovation

  10. Slide 10: Solomon Hub discovery

    Solomon Hub discovery The (unconventional) wisdom of Solomon Current Drainage GSWA 1: 250,000 geology

  11. Slide 11: Fortescue's innovation story

    Unlocking the Chichesters “A bucket of rusty nails” • Mining the un-mine-able ore body • Surface miners core to Fortescue’s innovation story • Pre-condition blasting to improve productivity • Opening the door for continuous improvement

  12. Slide 12: Product and Processing strategy

    Product and Processing strategy Maximising value from asset base Solving to maximise • Matching product to orebody • Fortescue Blend Product • Beneficiation of ore Mine • Lower cut-off grades Life Costs 12

  13. Slide 13: Leveraging a hidden strength

    Leveraging a hidden strength Blending with Firetail + wet processing, product grade 57.5% Strip ratio reduced from 5.4 to 2.3 New pit limit + + = Production inventory at cut off grade of 54% 13

  14. Slide 14: Robot trucks: Autonomous Haulage System

    Robot trucks Autonomous Haulage System (AHS) 109mt to date 41 autonomous trucks enhanced 38%productivity Safety improvement 14

  15. Slide 15: Iron Bridge – a new approach to Magnetite

    Iron Bridge – a new approach to Magnetite Harvesting ideas from across industries Dry separation Low energy process technology upgrade Low capital Lowest quartile magnetite global operating cost cost 15

  16. Slide 16: Capturing ideas from our people

    Capturing ideas from our people Using our brains not a cheque book • Have a crack

  17. Slide 17: Marketing innovation

    Marketing innovation

  18. Slide 18: Marketing innovation

    Marketing innovation Delivered an 18% market share imported iron ore to China • Low impurity 58% Fe average • High value in use • Margin versus throughput • Targeting growth • Proximity to high growth region 18

  19. Slide 19: Delivering the results

    ING oresce Delivering the results....

  20. Slide 20: Delivery of sustainable cost improvements

    Delivery of sustainable cost improvements Strategy Efficiency Innovation C1 US$/wmt 1 Solomon operations 60 50 48 2 Blending strategy 58% Fe 44 40 34 3 Processing, wet plants + de-sands 30 27 18 4 Operational efficiencies 20 Exit FY16 10 at $15 5 Fx and fuel decreases 0 FY12 FY13 FY14 FY15 FY16 Guid

  21. Slide 21: Moving down the global cost curve

    Moving down the global cost curve China's Iron Ore Supply CFR Costs (including royalties & ocean freight) Source: Metalytics

  22. Slide 22: Social and community value

    ee <«@e @ e ets ee © ®*o es ees r) e eS eo ®e,0 SM OS i) 3 eo0 ci POD —e pa SSB oe & ece ee Ss J, ‘Ges Oe @ D

  23. Slide 23: Ending Aboriginal disparity in the Pilbara

    Ending Aboriginal disparity in the Pilbara Creating opportunities through training, employment and business opportunity 23

  24. Slide 24: The new force in iron ore

    The new force in iron ore A culture of innovation Sustainable low cost World class producer assets People + 165mt unique culture Production rate drive performance

  25. Slide 25: www.fmgl.com.au

    www.fmgl.com.au @FortescueNews Proudly supporting:

Fortescue Metals Group — IMARC 2015 on 6ix