Trilogy Metals Inc. · TSX:TMQ

Trilogy Metals — NovaCopper — IPO Roadshow (February 2014)

11 slides from Trilogy Metals's IPO roadshow presentation, Feb 19, 2014

  1. Slide 1: Corporate Presentation - February 19, 2014

    Corporate Presentation - February 19, 2014 Rick Van Nieuwenhuyse, CEO Elaine Sanders, CFO

  2. Slide 2: Agreement with NANA Regional Corporation

    Agreement with NANA Regional Corporation, Inc. (“NANA”), an Alaskan Native Corporation. Good working relationship with local communities.

  3. Slide 3: Land status legend and project map

    Legend Federal se Proppect NANA Min Pr = + Selected or conveyed YE Major Deposit Neys ineral Projects Pr COPPER | Generat Land status rivate - other State

  4. Slide 4: NANA to receive Net Smelter Royalty

    • NANA to receive Net Smelter Royalty (1% to 2.5% based on the particular area of land from which production originates) • Option for NANA to participate as an equity partner (16% to 25%) or receive a net proceeds royalty (15% NPI) upon decision to proceed with construction of a mine • Commitment on

  5. Slide 5: Land Status

    Rogie gage Rede Alora Lee HI se ste ‘Anicak Schist Land Status NANA 401 NANA Ambler Patented Land Claims

  6. Slide 6: Arctic Resource Outline

    Arctic Res Outlin

  7. Slide 7: Separate Concentrates and Recoveries

    3 Separate Concentrates Copper 29% Zinc 56% Lead 50% Concentrate Recoveries Copper 87.1% Gold to copper concentrate - 57.9% Silver to copper concentrate - 40.2% Zinc 86.8% Lead 74% Gold to lead concentrate - 6.8% Silver to lead concentrate - 40.2%

  8. Slide 8: State of Alaska has already expended approximately US$10M

    2009-2013 • State of Alaska has already expended approximately US$10M to identify proposed access routes and initiate environmental baseline studies • Working Group consists of ADOT, ADNR, Alaska Governor’s Office, AIDEA, NANA and NovaCopper • Signed MOU with AIDEA ADOT: Alaska Department of Transpo

  9. Slide 9: Base Case is 1.0% Cu cut-off grade

    1) Base Case is 1.0% Cu cut-off grade. 2) Mineral resources at a 1.0% cut-off are considered as potentially economically viable in an underground mining scenario based on an assumed projected copper price of US$2.75 per lb and total site operating costs of US$60 per tonne. 3) Mineral Resources for A

  10. Slide 10: Qualified persons and technical reports

    qf Bornite-Ruby Cech Zore ornite-South Ret Zane unos Person(s) Michael. OBrien Me, Prat. FOSSA FAusIMM, FSAIMIM, Tera Tech Sabry Abdel Hafez PD. Png. Tetra Tees ‘arbi hang PRD. Png, Tetra Tech ran Gnafar MSc, Png. Tera Tech Miche! Cin Png. Teta Tech| Graham Wiking Png. EBA Mania Siva, PRD. PE Png. T

  11. Slide 11: Upper Kobuk Mineral Projects

    UPPER KOBUK C Mineral Projects

NovaCopper — IPO Roadshow (February 2014) on 6ix