Trilogy Metals Inc. · TSX:TMQ
Trilogy Metals — NovaCopper — IPO Roadshow (February 2014)
11 slides from Trilogy Metals's IPO roadshow presentation, Feb 19, 2014
Slide 1: Corporate Presentation - February 19, 2014
Corporate Presentation - February 19, 2014 Rick Van Nieuwenhuyse, CEO Elaine Sanders, CFO
Slide 2: Agreement with NANA Regional Corporation
Agreement with NANA Regional Corporation, Inc. (“NANA”), an Alaskan Native Corporation. Good working relationship with local communities.
Slide 3: Land status legend and project map
Legend Federal se Proppect NANA Min Pr = + Selected or conveyed YE Major Deposit Neys ineral Projects Pr COPPER | Generat Land status rivate - other State
Slide 4: NANA to receive Net Smelter Royalty
• NANA to receive Net Smelter Royalty (1% to 2.5% based on the particular area of land from which production originates) • Option for NANA to participate as an equity partner (16% to 25%) or receive a net proceeds royalty (15% NPI) upon decision to proceed with construction of a mine • Commitment on
Slide 5: Land Status
Rogie gage Rede Alora Lee HI se ste ‘Anicak Schist Land Status NANA 401 NANA Ambler Patented Land Claims
Slide 6: Arctic Resource Outline
Arctic Res Outlin
Slide 7: Separate Concentrates and Recoveries
3 Separate Concentrates Copper 29% Zinc 56% Lead 50% Concentrate Recoveries Copper 87.1% Gold to copper concentrate - 57.9% Silver to copper concentrate - 40.2% Zinc 86.8% Lead 74% Gold to lead concentrate - 6.8% Silver to lead concentrate - 40.2%
Slide 8: State of Alaska has already expended approximately US$10M
2009-2013 • State of Alaska has already expended approximately US$10M to identify proposed access routes and initiate environmental baseline studies • Working Group consists of ADOT, ADNR, Alaska Governor’s Office, AIDEA, NANA and NovaCopper • Signed MOU with AIDEA ADOT: Alaska Department of Transpo
Slide 9: Base Case is 1.0% Cu cut-off grade
1) Base Case is 1.0% Cu cut-off grade. 2) Mineral resources at a 1.0% cut-off are considered as potentially economically viable in an underground mining scenario based on an assumed projected copper price of US$2.75 per lb and total site operating costs of US$60 per tonne. 3) Mineral Resources for A
Slide 10: Qualified persons and technical reports
qf Bornite-Ruby Cech Zore ornite-South Ret Zane unos Person(s) Michael. OBrien Me, Prat. FOSSA FAusIMM, FSAIMIM, Tera Tech Sabry Abdel Hafez PD. Png. Tetra Tees ‘arbi hang PRD. Png, Tetra Tech ran Gnafar MSc, Png. Tera Tech Miche! Cin Png. Teta Tech| Graham Wiking Png. EBA Mania Siva, PRD. PE Png. T
Slide 11: Upper Kobuk Mineral Projects
UPPER KOBUK C Mineral Projects