Diatreme Resources Limited · ASX:DRX
Diatreme Resources — Mineral Sands Conference 2016
33 slides from Diatreme Resources's conference presentation, March 2016

Slide 1: Mineral Sands Conference – Diatreme Golden Sands
Mineral Sands Conference Melbourne – March 2016 DIATREME – GOLDEN SANDS

Slide 2: Disclaimer
DISCLAIMER the style of mineralisation and type of deposit under consideration DISCLAIMER and to the activity which he has undertaken to qualify as a Competent This presentation contains certain forward-looking statements and Person as defined in the 2012 Edition of the ‘Australasian Code for foreca

Slide 3: Presentation Outline
Presentation Outline Diatreme Resources Experience counts Cyclone Project Key milestones delivered Mineral sands outlook Zircon supply deficit forecast Strong project pipeline Tick Hill, Cape Bedford Conclusion Diatreme ready to go

Slide 4: Experienced Team
Experienced Team Experienced management team focused on streamlining operations with focus on key projects: Neil McIntyre – CEO, 25yrs experience in banking, finance, resources Ian Reudavey – Chief Geologist, 25yrs in exploration & mining, 15yrs mineral sands Phil McMurtrie – Project Manager, 40yrs

Slide 5: Skin in the game
Skin in the game DRX— Capital Structure Directors Position Shares on Issue 809.8 Million William Wang Chairman Options on Issue (Listed) 0 Million Andrew Tsang Non Executive Director Options on Issue (Unlisted) 41.3 Million Daniel Zhuang Non Executive Director Share Price (20th March 2016) A$0.015 M

Slide 6: Australian Focus
Australian Focus Mineral Sands Cape Bedford Metals Tick Hill Clermont Grays Hill Cyclone

Slide 7: Diatreme's Flagship – Cyclone Project, WA
Diatreme’s Flagship – Cyclone Project, WA

Slide 8: Cyclone Project – Investment Fundamentals
Cyclone Project – Investment Fundamentals • JORC Resource: Currently 211Mt @ 2.3% HM (Cyclone + Cyclone Extended) • JORC Reserve: Cyclone 140Mt @ 2.5% HM containing 1 Mt Zircon; • CAPEX of $A146 million and annual average OPEX of $A80 million (reductions in CAPEX of $A77 million by adoption of best

Slide 9: Cyclone Project Builds Momentum
Cyclone Project Builds Momentum Water Supply Extensive groundwater aquifer discovered beneath Cyclone Dec 2013. First bore complete (>40 l/s). Pump test required for bore-field design. Mine and Haul Road Environmental studies complete and Public Environment Report submitted in November 2014; PER pro

Slide 10: Cyclone Mining Lease & Site Layout
Cyclone Mining Lease & Site Layout Mining Lease M69/141 has been granted for the Cyclone Ore Reserve (dark red) and the operational activities that will occur around it. These activities include wet concentrating, tailings disposal, HMC stockpiles, offices, workshops, infrastructure and services. Cy

Slide 11: Cyclone Project Milestones
Cyclone Project Milestones Schedule Date Pre-Feasibility Study Completed - March 2012 Definitive Feasibility Study (most permits) Q3 2016 Project Financing Q1 2017 Construction & Development Q3 2017 Mining & Production Q2 2018

Slide 12: Proposed Mining Methods
Proposed Mining Methods —— a CYCLONE DEPOSIT Year 2 Rehabilitation Slurry Pipeline . Diatreme Resources Limited

Slide 13: PFS Mining Proposal
PFS Mining Proposal Strip Ratio 1.1: 1 Mining Rate (Dry) 1,300 tonnes per hour – 2 x Dozer traps Mine Site 26 Tonnes / Hour HMC production Wet Concentration Plant Product 147,000 t PA @ 98.5% HM Concentrate Transport - Road 240km - 4 trucks x 110 tonnes to Forrest Transport - Rail 1,000km OPTIONS Mi

Slide 14: Preferred Transport Option
Preferred Transport Option HMC loaded into containers at Cyclone. 33 tonne per container. 240 kilometre truck transport by road CYCLONE 1,100 kilometre rail transport from from Cyclone to Forrest rail siding in 100 Forrest siding to Port Pirie in 3,000 Road Rail tonne loads. tonne loads Forrest Pert

Slide 15: Cyclone Project 2016 Financial Estimates
Cyclone Project 2016 Financial Estimates • Cyclone Project including Cyclone Extended • Evaluation based on sale of HMC CIF China • 14 year mine life at 10 Mt per year • Average annual production of 155 kt HMC (A$139 M/year) • A$146M capital cost estimate and annual operating cost A$80M HMC Price (U

Slide 16: DRX Recent Significant Announcements
DRX Recent Significant Announcements • Dec. 2015: Cyclone Ore Reserve increased by 47%, mine life lengthened to 14 years following incorporation of acquired Cyclone Extended resource • Quarterly report Jan. 2016: Project substantially de-risked, with award of Mining Lease, agreement with Traditional

Slide 17: Cyclone Project Fundamentals
Cyclone Project Fundamentals • Tertiary Beach Strandline Deposit – Thick, multiple strands resulting in broad mining widths (~400m) and 1:1 strip ratio – Low slimes (4.5% -53µm) – Low oversize (5.1% +2mm) – Sandy ore (d50 of 225µm for Beach) – Coarse grained HM (d50 of 170µm for Beach) • High Value

Slide 18: Cyclone Project Fundamentals
Cyclone Project Fundamentals • Sufficient reserves to support extensive mine life – 14 years at 10Mt pa – Strand mineralisation gives options for high grading – Substantial resource base to support potential long term expansion • Support of Traditional Owners to develop project – Strong relationship

Slide 19: Zircon Supply Deficit Forecast
Zircon Supply Deficit Forecast ZIRCON SUPPLY CHALLENGE IN 3 YEARS “Zircon from existing producers declining due to depletion and decline in grade and assemblage…Absent new investment there is a zircon supply challenge within 3 years” (Iluka Resources, 19 February 2016) MARCH 2016: CHINA RAISES GROWT

Slide 20: Asia's Urbanisation Continues
Asia’s Urbanisation Continues Urbanisation set to increase demand for mineral sands, including zircon: WORLD BANK REPORT, JANUARY 2015 • Almost 200 million people moved to urban areas in East Asia from 2000-10 • Overall proportion of urbanites rose from 29% to 36% - but less than 1% of region’s tota

Slide 21: Diatreme's Project Pipeline
Diatreme’s Project Pipeline

Slide 22: Exploration Overview
Exploration Overview • Consolidation of exploration tenure – currently 8 exploration properties (incl. 1 application) and 4 ML, down from 29 (incl. 13 applications) in March 2014 • Mineral sands exploration tenure comprises Cyclone (WA), Yeppoon (Qld) and Cape Bedford (Qld application) • Tick Hill G

Slide 23: Cape Bedford, QLD
Cape Bedford, QLD Cape Bedford Cape Bedford, QLD Silica Sand, Heavy Mineral Sands EPM Application Conditions for grant agreed with Traditional Owners Size: 554 sq. km

Slide 24: Cape Bedford, QLD
Cape Bedford, QLD Large sand dune system with known silica sand and mineral sand occurrences over an area 50km x 15km in dunes up to 100m high. Historical exploration indicates HM mineralised horizons in sand mass High grade silica in previous drilling samples. Samples indicate areas with a high val

Slide 25: Cape Bedford, QLD
Cape Bedford, QLD . Diatreme Resources Limited

Slide 26: Cape Bedford, QLD
Cape Bedford, QLD Mineralisation on the current beach shedding from the dunes

Slide 27: Cape Bedford, QLD
Cape Bedford, QLD Major dune field with high grade silica sand overlying heavy mineral sand exploration targets

Slide 28: Tick Hill Gold Project, QLD
Tick Hill Gold Project, QLD Tick Hill, Qld Gold 3 Granted ML’s Tick Hill Size: 3.9 sq. km

Slide 29: Tick Hill Gold Project
Tick Hill Gold Project Tick Hill Gold Mine (circa 1993) looking easterly Produced 500,000 oz. gold from 700,000 tonnes of ore at 22.6g/t Au

Slide 30: Potential For Near-Term Cash Flow
Potential For Near-Term Cash Flow • Maiden Mineral Resource announced January 2016 for Tick Hill tailings material, estimated at 630kt at 1.08 g/t Au containing 680kg (22,000 troy oz) gold • Scoping Study confirms viability of standalone operation processing tailings resource; 20-month operation usi

Slide 31: Diatreme – Delivering Value
Diatreme – Delivering Value • Flagship project, Cyclone now advancing through final de-risking process as Diatreme builds a platform for further investment • Potential for near-term cash flow for shareholders from Tick Hill Gold Project tailings operation • Attractive project pipeline, including Cap

Slide 32: Supplementary Information – Cyclone Resource Estimate
Supplementary Information CYCLONE RESOURCE ESTIMATE - ASX Release 9 April 2015 HM Head Grade Material HM HM Slime OS Zircon Category cut-off Zircon HiTi Alt Ilm Si TiOx Mt % Mt % % Kt % % % % % MEASURED 2.0 69 3.7 2.55 3.6 3.8 1.05 1.17 0.48 0.82 729 MEASURED 1.5 102 3.1 3.13 3.9 4.4 0.87 0.96 0.40

Slide 33: Supplementary Information – Cyclone Reserve Estimate
Supplementary Information CYCLONE RESERVE ESTIMATE - ASX Release 14 December 2015 Head Grade Zircon Reserve Material HM HM Slime OS cut-off Zircon Rutile Leuc HiTi Alt Ilm Si TiOx Category Mt % Mt % % Zircon % % % % % % % Kt PROBABLE 0.4 140 2.5 3.54 4.5 5.1 0.71 0.07 0.17 0.58 0.32 0.57 1,000 TOTAL
Source: Internet Archive copy of diatreme.com.au
More decks from Diatreme Resources Limited
Noosa Mining Investor Conference 202623 slides · Jul 22, 2026
Noosa Mining Investor Conference 202526 slides · Nov 14, 2025
Noosa Mining Investor Conference 202522 slides · Jul 24, 2025
Noosa Mining Investor Conference 202435 slides · Nov 14, 2024
Noosa Mining Conference 202431 slides · Jul 18, 2024
Brisbane Mining Investor Conference 202428 slides · Mar 13, 2024