Fluxys Belgium Sa Class D · EURONEXT:FLUX

Fluxys Belgium Sa Class D — Technical Presentation (July 2025)

89 slides from Fluxys Belgium Sa Class D's technical presentation, Jul 8, 2025

  1. Slide 1: Disclaimer

    DISCLAIMER These slides are provided for reference only. Due to the evolving nature of the workshop preparations, it cannot be guaranteed that the figures included in these slides are perfectly aligned with the assumptions submitted in the public consultation. In case of inconsistency between figure

  2. Slide 2: Taskforce Multi-Energy Scenarios

    Taskforce Multi-Energy Scenarios Workshop 3, Supply & techno-economical assumptions Elia-Fluxys, Elia, 08/07

  3. Slide 3: Welcome!

    Welcome ! by Juan Vazquez & Rafael Feito-Kiczak

  4. Slide 4: Meetings, governance and rules

    Meetings, governance and rules • The chair is co-shared between Elia and Fluxys • Fluxys chair: Juan Vazquez • Elia chair: Rafael Feito-Kiczak • Meetings will be conducted in English • The goal is to constructively co-create future energy scenarios. As such everyone should respect the opinions of ot

  5. Slide 5: Name + Organisation

    Please state your Name + Organisation before providing feedback or asking a question (even if it's the fourth time) Thank you ☺ 5

  6. Slide 6: Agenda of the Workshop

    Agenda of the Workshop • Context reminder • Responses to feedback from Workshop 2, Industrial demand • Total energy demand • Supply • Electricity • Molecules • Green house gas emissions • Historical evolution • Decarbonization options • Existing regulations and targets/ambitions • Emissions estimati

  7. Slide 7: Context: Multi-Energy scenarios for the Federal Development Plan

    Reminder Context : Multi-Energy scenarios for the Federal Development Plan

  8. Slide 8: The taskforce scenarios leads to inputs for the individual NDPs

    The taskforce scenarios leads to inputs for the individual NDPs Reminder Electricity NDP Electricity specific inputs - Electricity demand - Electricity supply, flex, storage - Electricity flexibility & storage +Sensitivities! - Electricity grid - Electricity system cost assumptions Taskforce multi-e

  9. Slide 9: Overview of the draft planning of workshops and public consultation

    Overview of the draft planning of workshops and public consultation Input Welcomed Final Workshop Planning 18/07 12/09 Date to be confirmed 2025 You will receive a formal March April May June July August September October November December invitation to participate to the consultation via Public con

  10. Slide 10: Responses to feedback from Workshop 2

    Responses to feedback from Workshop 2 Industrial demand

  11. Slide 11: Industrial demand

    Industrial demand General modelling approach • How is the net-zero concept tackled for industry? CO2 emissions? Intermediate carbon target? See next parts of the presentation • Production evolution of Belgian industries. We will propose in the public consultation to keep the pre-crisis (2021) produc

  12. Slide 12: Industrial demand

    Industrial demand Non-metallic minerals • In 2030 hydrogen demand is high for glass and bricks -> too optimistic. We take it into account. Other sectors • Detailed focus for Agriculture. We considered a detailed focus (included in the public consultation dataset). 12

  13. Slide 13: Agriculture, forestry, and fishing

    Agriculture, forestry, and fishing Methodology uses top-down approach due to high amount of actors Current Final Energy Consumption Conversion Useful demand TWh efficiencies TWh per energy source per useful demand GAS • 50% with boilers 10.6 10.6 (η= 85%) • 50% with CHPs Oil: Mobile (η= 40%) Oil 3.8

  14. Slide 14: Agriculture, forestry, and fishing: future energy consumption

    Agriculture, forestry, and fishing Estimation of the future final energy consumption based on technology shifting Technology shifting assumed Final Energy Consumption 11 TWh 10 9 9 5 ELEC BASE MOL 4 4 3 6 2 Biomass boilers Biomass boilers Biomass boilers 4 3 3 2 3 4 2 2 2 HP Low T° heat HP E-boiler

  15. Slide 15: Total energy demand evolution towards 2050

    Total energy demand evolution towards 2050

  16. Slide 16: Total energy demand evolution towards 2050

    Total energy demand evolution towards 2050 Final energy demand – including feedstock and international transport, excluding grid losses excluding demand for transformation sector (as power plants, electrolyzers, SMRs, …) and CCS 700 638 623 632 TWh 616 612 599 586 30 TWh increase between 2021 600 82

  17. Slide 17: Total energy demand evolution towards 2050

    Total energy demand evolution towards 2050 Final energy demand – including feedstock and international transport, excluding grid losses excluding demand for transformation sector (as power plants, electrolyzers, SMRs, …) and CCS TWh 700 638 623 632 616 612 599 576 586 571 573 600 560 553 534 519 87

  18. Slide 18: Supply

    Supply fluxys® —@ria

  19. Slide 19: Goal of the taskforce: future demand and supply scenarios

    The goal of the taskforce consists of defining future demand and supply scenarios for use in development plans Supply scenarios Techno-economical scenarios Demand scenarios Scenario storylines Electricity supply capacities … Energy vectors Cost & technical parameters Methane Electricity Liquid fuels

  20. Slide 20: Demand & supply & interactions (illustrative)

    Demand & supply & interactions (illustrative) Focus of the taskforce scenarios PRIMARY ENERGY FINAL ENERGY USEFUL ENERGY Renewables Techno-economical Transformations Electricity Solar Thermal Wind -to- Electrolysis power International Hydro CAPEX, FOM transport Methane Biomass (Marginal) prices & Me

  21. Slide 21: Electricity supply assumptions

    Electricity supply assumptions These assumptions are drawn from our numerous interactions and should be viewed as a proposal that still requires further alignment with the relevant authorities and stakeholders. All data are draft and feedback and guidance is asked from stakeholders during this works

  22. Slide 22: Many options exist to supply Belgium's electricity demand

    Many options exist to supply Belgium’s electricity demand These choices have Different levers can be chosen to supply this demand several impacts Onshore wind Offshore wind Non-territorial offshore* Imports/exports In the Belgian EEZ Build interconnectors & offshore wind balance Needed to match Dema

  23. Slide 23: 1 central scenario and 3 sensitivities for electricity supply

    1 central scenario and 3 sensitivities for electricity supply The different electricity supply scenarios are proposed to be combined into: ➢ one ‘Central’ scenario which will be used for all analysis – Central trajectories for PV and wind onshore based on NECP and further extrapolated + proposal for

  24. Slide 24: PV installed capacity is assumed to grow massively

    PV installed capacity is assumed to grow massively The central scenario follows the regional objectives in the short term, and goes to close to 2020-2024 growth rates post 2035 Historical data AdeqFlex’25 Blueprint’24 100 4 GW/y 98 (Very high) Capacity end of year GWp High = 2.1 GW/y 2030 regional t

  25. Slide 25: Onshore wind capacity has grown steadily but faces challenges

    Onshore wind capacity has grown steadily but faces challenges in the short term, although ambitions are high The central scenario follows the (ambitious) regional objectives in the short term, and sees decreasing growth rates post 2035 due to spacing, permitting and public acceptance issues Avg grow

  26. Slide 26: Biomass, waste & Hydro Run-of-river

    Biomass, waste & Hydro Run-of-river • Biomass & waste: • 0,6 GW biomass to be kept constant until 2050 • 0,3 GW waste to be kept constant until 2050 ➢ Do we need to consider an increase/decrease after 2030 and based on what ? • Hydro RoR: 136 MW today. Proposal as for AdeqFlex to use 170 MW as from

  27. Slide 27: Small scale batteries

    Small scale batteries Small scale batteries capacity – Behind the meter [GW] Installation of small batteries depend on: 10 - Smart meters to enable dynamic contracts etc Historical AdeqFlex ‘25 Blueprint ‘24 +0.35 ~ 50k installations/y - Capacity tariffs 9.2 High GW/y 9 kW/installation - Solar PV +

  28. Slide 28: Large scale storage

    Large scale storage The battery capacity presented accounts for batteries "in front of the meter" that request a new grid connection and assumed to be 4-hour energy content Large scale batteries (front meter) capacity [GW] Pumped storage capacity [GW] 10 Blueprint ‘24 10 ➢ Do we need to consider an

  29. Slide 29: Decentralised CHPs, biomass and waste CHPs

    Decentralised CHPs, biomass and waste CHPs Decentralised waste, biomass, CHPs [GW] Decentralised CHP AdeqFlex Blueprint - Starting point: Based on existing and future 2 projects (PISA database). - No additional decommissioning of existing capacities until 2035 as they can still participate 1.57 Max

  30. Slide 30: Assumptions for nuclear electricity generation for Belgium

    Assumptions for nuclear electricity generation for Belgium Nuclear Capacity in GW -> ‘large-scale’ 2.0 Legend -> ‘central’ scenario Existing nuclear - All scenarios New nuclear - Local scenario 2.0 New nuclear - Central scenario -> ‘small scale’ New nuclear - Large Scale scenario 0.5 1.0 2.0 0.5 3.1

  31. Slide 31: Assumptions for domestic offshore electricity generation

    Assumptions for domestic offshore electricity generation for Belgium 0.7 Same capacity suggested for Offshore wind - domestic +0.7 GW: repowering MOG 1 all scenarios +1.5GW: new zone in EEZ Capacity in GW 5.8 1.5 0.7 Princess Elisabeth Zone (PEZ I and PEZ II) PEZ III assumed to be also developed bet

  32. Slide 32: Assumptions for non-domestic offshore electricity generation

    Assumptions for non-domestic offshore electricity generation for Belgium 0.7 Offshore wind – non-domestic Capacity in GW Large-scale 8 reaches 8 GW by 2050 7 2 GW 6 Central reaches 5 6 GW by 2050 2 GW 2 GW 4 Local reaches 4 3 2 GW 2 GW GW by 2050 2 4 GW 1 2 GW 2 GW 2 GW 0 ’30 ’35 ’40 ’45 ’50 Main as

  33. Slide 33: Existing CCGTs/OCGTs/TJs

    Existing CCGTs/OCGTs/TJs Combined Cycle Gas Turbines, Open Cycle Gas Turbines and Turbojets Turbojets: Assumed full decommissioning by 2035. Existing CCGTs and OCGTs: - all to remain until 2035 - 2035-40: Closure of old OCGTs not compliant with the CO2 rules of the CRM (around 400 MW) - 2040-50: if

  34. Slide 34: Overview of supply scenarios and supply-demand balance

    Overview of supply scenarios and supply-demand balance

  35. Slide 35: Overview of draft proposed electricity supply scenarios for Belgium

    Overview of draft proposed electricity supply scenarios for Belgium Values for supply in TWh and demand ranges are draft and only given as indication Electricity demand here follows the same definition as earlier in the slideset and as such excludes CCS, electrolysis, losses, demand-side response… e

  36. Slide 36: Molecule supply

    Molecule supply All data are draft. Feedback and guidance is asked from stakeholders during this workshop and the upcoming public consultation.

  37. Slide 37: Natural gas: current capacity status

    Natural gas: current capacity status CH4 Netherlands Norway LNG 20.35 United 30 Loenhout Kingdom Storage 27.15 7610 3.7 GWh 7 17.80 33.45 0 33.40 11.30 60 20.30 France 15 25 Belgium high flexibility In Germany in receiving flows Out from diverse Use sources Store Supply covers 2 significant transit

  38. Slide 38: Natural gas: current energy consumption status

    Natural gas: current Energy consumption status CH4 Norway Total imports 173 LNG TWh Netherlands pipe & LNG Storage 407 TWh 81.5 TWh Loenhout (2021: 385 TWh) United 66 TWh Kingdom (2021: 68 TWh) 46 TWh France 62.5 TWh 154 TWh 149 TWh (2021: 20 TWh) Germany (2021: 190 TWh) Total transit to surrounding

  39. Slide 39: Molecule's supply and CO2 will be taken into account

    Molecule’s supply and CO2 will be taken into account Direct Supply Conversion Storage Imports Regas. Local Storage Production Biomethane Methanation Exports of LNG CH4 Imports Regas Electrolysis Ammonia Tanks Salt SMR Exports cracking cavern H2 H2 H2 CH4 H2 H 2O CO2 NH3 N2 H2 Imports Carbon Direct a

  40. Slide 40: Biomethane

    Biomethane CH4 Biomethane composition similar to natural gas: 100% compatible for injecting into the existing system Biomethane Livestock effluents Purification Organic waste Digester Biogas Agriculture- related flows Combined heat and Fermentation residues power (CHP) unit: Green electricity and gr

  41. Slide 41: Biomethane – projection 2030

    Biomethane – projection 2030 CH4 Anaerobic digestion Thermal gasification BE potential ± 3.2 TWh/y Current Situation :0.4 TWh/yr Source: Gas for Climate study, 2022, aligned with Fluxys market potential 41 (https://www.europeanbiogas.eu/wp-content/uploads/2022/07/GfC_Biomethane-potentials_2022.pdf)

  42. Slide 42: Biomethane – projection 2050

    Biomethane – projection 2050 CH4 Biomethane potential in 2050 per technology and country Anaerobic digestion Thermal gasification Import potential BE potential from FR and DE ± 15 TWh/y Supply estimation: 22 TWh/y Source: Gas for Climate study, 2022 42 (https://www.europeanbiogas.eu/wp-content/uploa

  43. Slide 43: Biomass potential of local production

    Biomass potential of local production The source used gives the biomass potential including biomass for biomethane production. (30 – 41 TWh/year) Biomass potential excluding local production of biomethane* amounts to the following: 2022 2030 2050 Biomass TWh/year 20 24 21 Input welcomed: - Have you

  44. Slide 44: Biomethane and biomass production

    Biomethane and biomass production TWh 30 25 20 15 26 24 21 10 20 15 5 6 3.2 0.4 0 2021 2030 2040 2050 Input welcomed Biomass Local biomethane production 44

  45. Slide 45: The colours of hydrogen

    The colours of hydrogen Grey hydrogen Steam methane reforming Renewable and low carbon Cracking natural gas into hydrogen hydrogen and CO2 using Carbon steam capture Blue hydrogen Natural gas Green hydrogen Wind Electrolysis Solar Converting water into hydrogen and oxygen using electricity Pink hydr

  46. Slide 46: Hydrogen from shipping

    Hydrogen from shipping H2 H2 NH3 N2 46

  47. Slide 47: Hydrogen from shipping – Ammonia Cracking

    Hydrogen from shipping – Ammonia Cracking H2 Antwerp ammonia Zeebrugge multimolecule hub import terminal overseas hydrogen H2 import/CO2 export NH3 N2 47

  48. Slide 48: Ammonia Cracking – Capacity Potential

    Ammonia Cracking – Capacity Potential H2 GW 12 H2 10 NH3 N2 8 6 10 4 7 2 3 0 0 2021 2030 2040 2050 H2 capacity production Input welcomed 48 Proposition based on market interest until 2040. Extrapolation for 2050

  49. Slide 49: Ammonia Cracking – Production Potential

    Ammonia Cracking – Production Potential H2 TWh 100 H2 80 NH3 N2 60 40 88 61 20 28 0 0 2021 2030 2040 2050 -20 -32 -70 -40 -100 -60 -80 -100 H2 production Ammonia consumption Proposition based on market interest until 2040. Extrapolation for 2050 49

  50. Slide 50: Hydrogen from Steam Methane Reforming (SMR)

    Hydrogen from Steam Methane Reforming (SMR) H2 H2BE : Production Blue H2 1GW in 2030 SMR 50

  51. Slide 51: SMR Additional Capacity potential

    SMR Additional Capacity potential H2 GW 7 6 SMR CH4 H2 5 H 2O CO2 4 3 6 2 1 2 1 0 0 2021 2030 2040 2050 Input welcomed 51 Numbers based on H2BE capacity project in 2030. 2050 come from Integration Fluxys model. 2040 with interpolation

  52. Slide 52: SMR additional potential production

    SMR additional potential production H2 TWh 50 SMR 30 53 10 18 0 -1 9 -1 -4 2021 -11 2030 2040 2050 -10 -22 -30 -66 -50 -70 Methane consumption Electricity consumption H2 production 52 Numbers based on H2BE capacity project in 2030. 2050 come from Integration Fluxys model. 2040 with interpolation

  53. Slide 53: Hydrogen from Electrolysis

    Hydrogen from Electrolysis H2 Hyoffwind : Production Green H2 25MW in 2026 Electrolysis 53

  54. Slide 54: Electrolysis Capacity Potential

    Electrolysis Capacity Potential H2 MW 600 Electrolysis 500 400 300 500 200 238 100 25 0 2021 2030 2040 2050 Input welcomed 54 Numbers based on HyOffWind capacity project in 2030 and TYNDP ENTSO potential for 2050.

  55. Slide 55: Electrolysis Production Potential

    Electrolysis Production Potential H2 TWh 6 Electrolysis 4 2 4 2 0.2 0 -0.3 2021 2030 2040 2050 -3 -2 -6 -4 -6 -8 Electricity consumption H2 production Numbers based on HyOffWind capacity project in 2030 and TYNDP ENTSO potential for 2050. 55

  56. Slide 56: Ammonia from Shipping

    Ammonia from Shipping NH3 Haber-Bosch H2 N2 NH3 56

  57. Slide 57: Ammonia Potential Capacity Import

    Ammonia Potential Capacity Import NH3 GW 40 35 30 25 20 35 15 10 15 5 6 0 0 2021 2030 2040 2050 Input welcomed 57 Numbers based on source : Belgium as a hydrogen importhub, roadmap towards 2030 and beyond

  58. Slide 58: Ammonia Potential Energy Import

    Ammonia Potential Energy Import NH3 TWh 350 300 250 200 150 306 100 128 50 50 0 0 2021 2030 2040 2050 Numbers based on source : Belgium as a hydrogen importhub, roadmap towards 2030 and beyond 58

  59. Slide 59: Haber–Bosch Potential additional Capacity Production

    Haber – Bosch Potential additional Capacity Production NH3 H2 production via Haber-Bosch process N2 + 3 H2 → 2 NH3 N2 NH3 MW Haber-Bosch 600 H2 N2 NH3 500 400 300 500 200 100 0 0 0 2021 2030 2050 Input welcomed Numbers based on Integration Fluxys Model. 59

  60. Slide 60: Haber–Bosch Potential Energy Production

    Haber – Bosch Potential Energy Production NH3 TWh 5 4 Haber-Bosch 3 H2 N2 NH3 2 4 1 0 0 0 2021 2030 2050 -1 -2 -5 -3 -4 -5 Ammonia production H2 consumption Numbers based on Integration Fluxys Model. 60

  61. Slide 61: Proposal of potential of production: Bio and e-fuels TYNDP 2026

    Proposal of potential of production : Bio and e-fuels TYNDP 2026 10 Informative potential TWh/y 8 8 e-methanol 6 5 e-kerosene 4 3 3 2 e-methane 2 2 1 1 0 2030 2035 2040 2045 2050 Input welcomed: - We don’t have a clear view for these potentials. Do you have any view ? - Have you some source for pote

  62. Slide 62: Supply-demand balance

    Supply-demand balance fluxys® —@ria

  63. Slide 63: Overview of draft proposed molecules supply scenarios for Belgium (2030)

    Overview of draft proposed molecules supply scenarios for Belgium Values for supply in TWh and demand ranges are draft and only given as indication Molecules demand here excludes Transit and Power Plant demand estimations based on input data and no modulation Maximum Potential Capacity [GW] per vect

  64. Slide 64: Overview of draft proposed molecules supply scenarios for Belgium (2040)

    Overview of draft proposed molecules supply scenarios for Belgium Values for supply in TWh and demand ranges are draft and only given as indication Molecules demand here excludes Transit and Power Plant demand estimations based on input data and no modulation Maximum Potential Capacity [GW] per vect

  65. Slide 65: Green house gas emissions

    Green house gas emissions • Historical evolution • Decarbonization options • Existing regulations and targets/ambitions • Emissions estimations based on the scenarios

  66. Slide 66: Clarifications before we start

    Clarifications before we start GHG CO2 • Total Greenhouse Gas emissions include • Total CO2 emissions only include CO2 CO2, CH4, N20, HFCs, SF6, NF3,… • GHG are expressed in tonnes of CO2 equivalent CO2 equivalent factors (values from last IPCC report): • CH4: 29.8 • N2O: 273 • SF6: 24300 • NF3: 174

  67. Slide 67: Total GHG emissions decreased by 32% since 2005

    GHG Total GHG emissions decreased by 32% since 2005 (excl. aviation, shipping, LULUCF) Evolution of Belgian Green House Gas emissions since 1990 (Mt CO2 eq.) 200 180 176 176 174 174 177 174 174 174 175 168 169 170 167 169 168 162 164 164 163 163 160 153 150 153 148 157 144 144 142 143 146 151 153 15

  68. Slide 68: Most of the GHG emissions reductions since 1990 came from industry, power and residential

    Most of the GHG emissions reductions since 1990 came from the industry, power GHG sector and the residential sector Evolution of Belgian CO2eq emissions per sector (Mt CO2 eq.) (excl. LULUCF) 180 Int. shipping 160 Int. aviation 140 126 126 Energy production - transformation* 120 Partially reported 2

  69. Slide 69: Industries, power and residential sectors achieved highest emission reductions since 2005

    GHG Industries, the power sector and residential sector achieved the highest emission reductions since 2005 (around 40%). Agriculture and transport lag behind. Relative evolution of GHG emissions by sector compared to 2005 110% 100% Agriculture 90% Transport 80% Tertiary heating 70% Other Industry (

  70. Slide 70: CO2 represents more than 85% of total GHG emissions

    GHG CO2 represents more than 85% of total GHG emissions GHG emissions distribution Distribution of GHG emissions by sector and GHG type (MtCO2eq) (MtCO2eq & %) 111.0 24 2.4 2% 4.7 4% Other types of 7.9 7% 18 18 emissions – not 17 14 2 considered in details 24 9 18 16 6 14 15 3 3 6 6 1 1 3 95.7 86% *

  71. Slide 71: Several decarbonization options exist for each sector

    Several decarbonization options exist for each sector Applicable Not applicable Energy Decarbonization Industry Industry Residential Tertiary Agriculture production & Transport Aviation Shipping options (combustion) (process) (combustion) (combustion) (combustion) transformation Technology change or

  72. Slide 72: Regulation scope of GHG emissions

    Regulation scope of GHG emissions GHG covered: - EU-ETS: CO2, N20 (mostly in chemicals), PFCs - EU-ETS II: only CO2 - ESR: all GHG SECTORS 2023 2024 2025 2027 Power production Energy Refineries EU Emission Trading System (EU ETS) EU Emission Trading Large industries System (EU ETS) New ETS for fuel

  73. Slide 73: Carbon neutrality in 2050

    Carbon neutrality in 2050 European Commission - 2050 long-term strategy “The EU aims to be climate-neutral by 2050 – an economy with net-zero greenhouse gas emissions. This objective is at the heart of the European Green Deal, and is a legally binding target thanks to the European Climate Law.” “EU

  74. Slide 74: Carbon neutrality in 2050

    Carbon neutrality in 2050 Wallonia – Déclaration de politique régionale Wallonne 2024-2029 “ La Wallonie continuera à s’inscrire résolument dans la perspective de mise en œuvre du Pacte vert européen. Dans ce cadre, Le Gouvernement s’inscrit pleinement dans l’objectif de neutralité carbone en 2050 e

  75. Slide 75: Emission targets at European and Belgian levels

    Emission targets at European and Belgian levels Climate policy Validated Level 2030 2040 2050 Assumed instrument Proposal Effort sharing regulation -47% Not yet specified Belgian Net zero (Non-ETS) Compared to 2005 Interpol = -73.5% EU – ETS European -62% Not yet specified Net zero Compared to 2005

  76. Slide 76: Estimation of GHG emissions based on the scenarios

    GHG Estimation of GHG emissions based on the scenarios Methodology used to estimate the future GHG emissions of the scenarios Energy demand for Combustion/energy Emission intensity Worst case CO2 carbo-liquids, methane, emissions emissions (CO2) factors* solid fuels, waste Process emissions Evolutio

  77. Slide 77: Where are we with the scenarios?

    Estimated GHG GHG Where are we with the scenarios? Excluding emissions for additional energy demand in transformation sectors (to produce H2 and other fuels) and CCS Evolution of Greenhouse gas emissions in Belgium, Base scenario Mt CO2 eq/y Two major challenges: 1. Commitments/emission targets in 2

  78. Slide 78: Estimated 2030 GHG emissions in BE fall short of the targets

    Estimated GHG GHG Estimated 2030 GHG emissions in BE fall short of the targets 84 ESR emissions (Mt CO2 eq) GHG emissions towards 2030 (Mt CO2 eq) 17 66 68 -35% 63 62 -47% 8 15 57 4 15 14 55 13 52 Int. transport 7 10 Non-CO2 6 10 142 2 6 6 43 10 Industry 3 2 2 6 6 27 5 3 3 3 Power & heat Non-CO2 17

  79. Slide 79: Estimated 2030 GHG emissions fall short of the targets

    Estimated 2030 GHG emissions based on current scenarios fall short of the targets At Belgian level: 2030 ESR target: 2030 EU targets: Indicative target Not reached at Not reached EU GHG: -55% (comp. to 1990) Binding target Belgian level BE ESR: -47% (comp. to 2005) EU ETS: -62% (comp. to 2005) • Is

  80. Slide 80: Remaining questions regarding the emissions targets

    Remaining questions regarding the emissions targets to be achieved by the scenarios 2030 • ESR Input • Is it acceptable to fall short of the 2030 target? Welcomed • Do we need to modify the scenarios or use additional measures to get closer to the target? If yes, which modifications or additional me

  81. Slide 81: Prices & techno-economical parameters

    Prices & techno-economical parameters Those parameters are used to determine the dispatch of the different assets (e.g. economic dispatch simulations for the electricity market) and resulting indicators in those simulations. It is not the goal to run capacity expansion models as the capacities will

  82. Slide 82: Fuel & CO2 prices

    Fuel & CO2 prices More information: Proposal: Use TYNDP26 prices for the electricity dispatch model ENTSO-E and ENTSOG public consultation on the TYNDP 2026 Scenarios’ input assumptions, data, parameters and methodologies - European Network of Transmission System Operators This leads to (current vie

  83. Slide 83: Economic parameters needed for the electricity dispatch

    Economic parameters needed for the electricity dispatch ➢ VOM: ▪ Same as AdeqFlex ’25 ➢ Storage efficiency: ▪ batteries: 85% roundtrip ▪ PSP: 75% roundtrip ➢ FO rates: ▪ Same as AdeqFlex ’25 ➢ No maintenance assumed during winter in Belgium 83

  84. Slide 84: Other countries

    Other countries Use of TYNDP26 scenarios as much as possible (public consultation data or latest collected data at ENTSO-E for the electricity part), this to ensure full consistency with the European framework. Current public consultation of TYNDP26 scenarios: ENTSO-E and ENTSOG public consultation

  85. Slide 85: Other topics to be consulted on but not presented during the workshops

    Other topics to be consulted on but not presented during the workshops

  86. Slide 86: Other topics to be consulted on

    Other topics to be consulted on • Evolution of the energy demand for the other sectors • End user flexibility • End user profiles • Industrial flexibility • … 86

  87. Slide 87: Closing remarks

    Closing remarks fluxys® —@ria

  88. Slide 88: Next steps & call for evidence

    Input Next steps & call for evidence Final Welcomed Workshop Reminder next steps 18/07 12/09 Date to be confirmed 2025 You will receive a formal March April May June July August September October November December invitation to participate to the consultation via Public consultation FOD & FPB opinio

  89. Slide 89: Merci/dankuwel!

    Merci/dankuwel! fluxys® —@ria

Fluxys Belgium — Technical Presentation (July 2025) on 6ix