Metals Creek Resources Corp. · TSXV:MEK

Metals Creek Resources — Investor Presentation (September 2019)

28 slides from Metals Creek Resources's investor presentation, September 2019

  1. Slide 1: Dona Lake Gold Project

    Dona Lake Gold Project

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements – Certain statements included in this presentation are forward-looking statements which are made pursuant to the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. They include estimates and statements that describe the Company’

  3. Slide 3: Dona Lake Gold Project, Pickle Lake Area, Northern Ontario

    PICKLE LAKE ONTARIO Thierry Mine ya DONA LAKE ee xe PICKLE LAKE ; PROJECT THUNDER BAY DONA LAKE GOLD PROJECT PICKLE LAKE AREA NORTHERN ONTARIO

  4. Slide 4: MEK's 2nd option agreement with Goldcorp

    MEK’s 2nd option agreement with Goldcorp • Option Agreement with Newmont Goldcorp (Goldcorp) • Metals Creek can earn 100% • MEK issue 7,000,000 shares and spend $4 million over 3 years • Goldcorp has the right to participate in future MEK financings for up to 19.9% • Goldcorp Has a one time back-in

  5. Slide 5: Pickle Lake area past production and resources

    THIERRY MINE PAST PRODUCTION OF 51,528,960 kg Cu* M&l RESOURCES OF 8.81MT @ 1.66% Cu, 0.19% Ni, 4.0g/t Ag** INDICATED RESOURCES OF 14.92MT @ 1.64% Cu, 0.16% Ni, 6.4g/t Ag*** TOWN OF PICKLE LAKE CENTRAL PATRICIA #1 PAST PRODUCTION OF 621,806 oz Au* PICKLE CROW PAST PRODUCTION OF 1,446,214 oz Au* INFE

  6. Slide 6: General Geology of Dona Lake Project

    / / / DIABASE BANDED IRON FORMATION a f Ve SURFACE MINERALIZATION ~ \ ~e x PICKLE CROW ASSEMBLASE FELSIC VOLCANICS: A PICKLE CROW ASSEMBLASE MAFIC VOLCANICS: = OHIO LAKE STOCK POTENTIAL OF AU MINERALIZATION DDH intercepts of 12.24g/t Au over 1.7m, 8.81g/t Au over 1.4m and 9.28g/t Au over 3.6m of GEN

  7. Slide 7: 0.43g/t Au over 2.40m

    F 0.43g/t Au over 2.40m 11.88g/t Au over 2.70m and 4.21g/t Au over 2.00m Dp] 1.02¢/t Au over 2.92m 2.62g/t Au over 3.10m and 5.25e/t Au over 1.80m “@ STRONG CONDUCTOR <@ MODERATE CONDUCTOR PROSPECTIVE IRON FORMATION NAD83 UTM ZONE 15N kilometres 2.35g/t Au over 4,10m incl. 4.11g/t Au over 2.00m 1.37

  8. Slide 8: Preliminary Electromagnetics

    E7HOS00 Ny 2701000 oN 520000.08 550750008 5626000 15608 600 5526000 0 597,090 690 600 PRELIMINARY ELECTROMAGNETICS 11.88g/t Au over 2.70m and 4.21g/t Au over 2.00m 2.62g/t Au over 3.10m and 5.25e/t Au over 1.80m MAD83 UTM ZONE 15N kilometres 2.35g/t Au over 4.10m incl. 4.11g/t Au over 2.00m 1.37¢/t

  9. Slide 9: Section 14920N drill intercepts

    5,609,800 mN, 02 500 ae oo po ne op 200 ue 00 Oo : —_ ° 9.28g/t Au over 3.60m and 4.11g/t Au over 2.00m | © me J ? 4.03g/t Au over 2.10m incl. 13.02g/t Au over 0.50m ; © © 15.54g/t Au over 2.25m SHAFT 2 6.04g/t Au over 2.80m Deepest intercept ® 6g/t Au over 21.08m Deepest intercept . © 0e@e 14.17g/t

  10. Slide 10: Assays cut to 20 g/t; all intersections report Au grades

    Note: ASSAYS CUT TO 20 G/T ALL INTERSECTIONS REPORT AU GRADES

  11. Slide 11: B Zone schematic longitudinal section

    ‘The Corporation cautions that the data is historical in nature and has not been verified or validated PRIORITY DRILL TARGET FOR UPCOMING DRILL PROGRAM N PROSPECTIVE GOLD Ha veRauizarion }2g/f over 2.20m “ALL INTERSECTIONS REPORT AU GRADES* 2 — oom 4g/t over 5.00m g/t over 10.60m ee eel) 17g/t over

  12. Slide 12: ‘The Corporaoncaunans thatthe data hte in nature and has not been vei or validted

    ‘The Corporaoncaunans thatthe data hte in nature and has not been vei or validted

  13. Slide 13: Dona Lake Mine ore zones expressed to surface

    110 METERS ——~ DONAVAKE MINE = ORE ZONES EXPRESSED. TO SURFACE Gi j ty iG 2

  14. Slide 14: 16.1 g/t Gold

    16:1 g/t Gold: 4

  15. Slide 15: Dona Lake Highlights

    Dona Lake Highlights • Similar Geology (Banded Iron Formation) to Musselwhite Mine which has produced greater than 4 million ozs gold • Two subparallel gold zones approximately 25m apart (B-zone and Main) • Produced 246,500 ozs gold (Gold was approx $325) • Main zone mined to the 455 level or 455m v

  16. Slide 16: Current Activities

    CURRENT ACTIVITES • In the process of converting data to digital format • Generating 3D model of Main mineralized horizon and Footwall B-Zone • Target generation for upcoming drill program • Recently completed Airborne Mag-EM survey (awaiting preliminary data)

  17. Slide 17: Upcoming Activities

    UPCOMING ACTIVITIES • Compile results for recently flown airborne survey (AEM) – Prioritize Targets • Ground truth AEM targets • Generate property wide geological model incorporating AEM targets • Planning and implementing drill targets for upcoming diamond drill program

  18. Slide 18: Dona Lake Data

    Dona Lake Data • The Corporation cautions that all data quoted in the Dona Lake presentation is historical in nature and has not been verified or validated.

  19. Slide 19: Ogden Gold Project, Timmins Gold Camp Ontario

    Ogden Gold Project, Timmins Gold Camp Ontario

  20. Slide 20: Ogden Gold Project – 50/50 JV with Newmont Goldcorp

    Ogden Gold Project – 50/50 JV with Newmont Goldcorp Drillng in the shadow of the Head Frames in Canada’s most prolific Gold Camp. Metals Creek have formed a 50/50 joint venture with Newmont Goldcorp, MEK is operator. Over 8km of strike length of the Porcupine-Destor Break, the key conduit for gold m

  21. Slide 21: Timmins Gold Camp Mineralized Trend

    Timmins Gold Camp Mineralized Trend

  22. Slide 22: Ogden Gold Project – Gold Zones

    Ogden Gold Project – Gold Zones

  23. Slide 23: Thomas Ogden Zone

    Thomas Ogden Zone MEK results from drilling 210.19 g/t Au over 12.53 m, including 2732.6 g/t (2.73 kg) over 0.93 m 49.96 g/t Au over 9m 1.94g/t over 94m 2.20 g/t Au over 75.85m including 5.26g/t over 23.4 m Step out drilling 480m west of TOZ hit 5.06g/t over 2.6 meters. More recent step out drilling

  24. Slide 24: Highlights 2012/13 Drilling

    Highlights 2012/13 Drilling Drill Hole Number Meters From Meters to Total Meters Gold g/t (Grammes per tonne) TOG 11-11 78.00 172.00 94.00 1.94 TOG 12-03 90.50 118.00 27.50 1.14 and 148.00 171.30 23.30 5.73 TOG 12-05 141.30 185.00 43.70 2.34 including 170.00 185.00 15.00 5.04 TOG 12-06 146.60 162.87

  25. Slide 25: Naybob South Zone

    Naybob South Zone Historic Results 6.33 g/t Au over 5.37m 11.85 g/t Au over 1.83m MEK drill results 9.24 g/t Au over 6.61m 6.22 g/t Au over 6.63m  all with visible gold at less than 100 meters vertical depth.  close to existing infrastructure.

  26. Slide 26: Naybob South Longsection

    Naybob South Longsecti Ww 300 mN — 100 mn —OmN 100 mN Naybob South Gold Mineralization Grade x Thickness

  27. Slide 27: Planview of Drilling on Geology

    Planview of Drilling on Geology Thomas Ogden West to South Zone Ea 4.96g/t Au / 3.97m 210.19g/t Au {uncut} / 12.53m 2.14g/t Au / 1.80m 8.28g/t Au/0.59m L.7ag/t Au / 450m 2.38g/t Au / 5.29, 1.90g/t au 42.00m THOMAS OGDE! A zeae SOUTH ZONE 0 1 ——e kilometers

  28. Slide 28: Thank You

    METALS CREEK RESOURCES The Best Place to Look For Gold is in the Shadow of Headframes MEK TSX-V Thank You Experienced Team, Endless Opportunities

Metals Creek Resources — Investor Presentation (September 2019) on 6ix