Greenx Metals Limited · ASX:GRX

Greenx Metals — Prairie Downs Metals — Investor Presentation (October 2013)

25 slides from Greenx Metals's investor presentation, October 2013

  1. Slide 1: Lublin Coal Project: Europe's Next Strategic Supply of Thermal Coal

    ASX: PDZ ABN 23 008 677 852 Lublin Coal Project Europe's Next Strategic Supply of Thermal Coal October 2013

  2. Slide 2: Prairie Downs Metals Limited – Lublin Coal Project

    Prairie Downs Metals Limited – Lublin Coal Project Prairie Downs Metals Limited (ASX:PDZ) is an ASX listed company developing the Lublin Coal Project in Poland’s world class Lublin Coal basin Lublin Coal Project Map  Strategic resource of high quality thermal coal - Inferred Coal Resource Estimate

  3. Slide 3: Coal – Fundamental to Europe's Energy Matrix

    Coal – Fundamental to Europe’s Energy Matrix During 2012, Europe1 consumed over 770mt of coal for power generation, of which 265mt was thermal coal. Thermal coal imports amounted to 172mt, accounting for 22% of globally traded thermal coal… European Thermal Coal Imports & Production by Country (2012

  4. Slide 4: Europe – Declining Domestic Coal Production

    Europe – Declining Domestic Coal Production Europe’s hard coal production continues to decline as viable coal resources deplete European Hard Coal1 Production (million tonnes) 400 Rest of EU 365mt (total) Czech Republic 350 Germany 300 295mt United Kingdom Poland 250 227mt 200 189mt 155mt 150 127mt

  5. Slide 5: Increasing Reliance on Imported Thermal Coal

    Increasing Reliance on Imported Thermal Coal Imports from Russia, Colombia, the US and others are fundamental for European thermal coal supply… USA Russia Export to EU (2012) 35.8mt Export to EU (2012) 60.3mt % Total of EU Imports 19% % Total of EU Imports 33% Calorific Value (Kcal/kg) 6,676 Calorif

  6. Slide 6: Coal – Poland's Primary Energy Source

    Coal – Poland’s Primary Energy Source Poland remains heavily reliant on coal for energy production  Poland produces some 90% of its electricity from coal Poland Electricity Generation Mix (2011) 2% 6%  Lignite production from Poland amounted to 64mt in 2012 2%  Polish hard coal production totalle

  7. Slide 7: Poland - A Favourable Investment Jurisdiction

    Poland - A Favourable Investment Jurisdiction Poland is a safe, low risk mining jurisdiction with an excellent fiscal regime  Poland is a first world country having gone through significant reform since the Belchatow Power Station (4,440MW) in Poland end of communism in 1989  Over US$120 billion i

  8. Slide 8: Upper Silesian and Lublin Coal Basin – Coal Production

    Upper Silesian and Lublin Coal Basin – Coal Production The Lublin Coal Basin represents a low cost alternative to traditional Upper Silesian production  Polish coal production has historically been supplied from the Upper and Upper Silesian and Lublin Basin Coal Production Lower Silesian Basins ₋ s

  9. Slide 9: The Lublin Coal Basin hosts a World Class Mine

    The Lublin Coal Basin hosts a World Class Mine “The Bogdanka mine ranks with the best deep coal mines in the world in terms of the absolute performance of its longwalls and development headings”, SRK Mining Consultants Bogdanka Coal Mine US$112/t $US110/t US$43/t Bogdanka JSW SA New World Resources

  10. Slide 10: Next Generation Longwall Plow Technology

    Next Generation Longwall Plow Technology World record setting plow technology deployed in the Lublin Coal Basin… Caterpillar Plow, AFC and Hydraulic Chocks Operating Longwall Plow Face  Recommended technology for seam heights of 0.6m to 2.3m as compared to a traditional shearer longwall  The Lubli

  11. Slide 11: Poland's Established Coal Infrastructure

    Poland’s Established Coal Infrastructure Strategic choice for low cost European coal supply with an established rail system and export ports 11

  12. Slide 12: Russian Coal Supply Chain

    Power Plant Delivered Costs Coal supply chain comparison demonstrates a competitive advantage for the Lublin Basin Port- Power Plant Russian Coal Supply Chain FOR Mine Mine-Port S/Pile & FOB Shipping CIF ARA Unload & Power Cost Rail Port Load S/Pile Delivered US$78/t US$86/t Plant Rail Cost ~US$43/t

  13. Slide 13: Targeting First Quartile Cash Costs

    Targeting First Quartile Cash Costs New projects in the Lublin Coal Basin have strong potential to be in the lowest quartile of the cost curve for thermal coal delivered into Europe… Russia API 2 (Oct 2013) Lublin Coal Basin1 Colombia 2013 CFR ARA Energy Adjusted Cash Costs Curve (Source: Wood Macke

  14. Slide 14: Lublin Coal Project - Massive Coal Resource

    Lublin Coal Project - Massive Coal Resource 1.6 Billion tonne inferred strategic resource of high quality thermal coal…  Maiden Coal Resource defined from over 200 core holes with cut-off seam thickness of 1.0 meters, a 20 meter buffer zone between the Jurassic and over 20 coal seams modelled 14

  15. Slide 15: Large Scale Production Potential

    Large Scale Production Potential 680 Million tonnes of the current inferred Coal Resource is contained within 3 high quality coal seams…  Potential to delineate a world scale deposit from only three (3) seams which display excellent thermal coal quality characteristics 391 Seam 379 Seam 382 Seam 32

  16. Slide 16: Low Cost Potential

    Low Cost Potential Favorable geology allows for low cost longwall mining… 391 Seam 327 Million tonnes1 8.4% Ash 1.16% Sulphur 6,908 kcal/kg (GAD) 1 JORC (Inferred), refer to maiden coal resource announcement on 14 February 2013 Note: 391 seam isopachs based on historical core and geophysical logs 16

  17. Slide 17: Drilling Program and Project Studies

    Drilling Program and Project Studies Core Drilling Program Drill Rig on Site  A seven hole core drilling campaign is presently underway to: – update the coal quality and washability database to determine potential product pricing and yields – enhance the Project’s geological model and delineate out

  18. Slide 18: Project Timeline

    Project Timeline Potential for market re-rating in the short term… 2013 2014 2015 2016 Project Milestones Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Maiden Resource Estimate  Strengthen Management Team   Drilling Program (7-hole) & Coal Quality Scoping Study EIA (EP compliant) Infill Drillin

  19. Slide 19: Board of Directors

    Board of Directors Strong board with proven development experience…  Highly respected, London based, mining engineer and investment banker; holds a NSW mine managers certificate of competency for underground coal mining with significant experience in longwall mining operations Ben Stoikovich Chief

  20. Slide 20: High Calibre Executives - Poland

    High Calibre Executives - Poland Key appointments to Prairie’s local team1 in Poland…  Geologist with over 30 years experience and a proven ability in the identification, exploration and appraisal of Janusz Jakimowicz international resource projects; Dual Polish and Australian citizenship President

  21. Slide 21: Project Team

    Project Team An experienced and Polish based project team…  Exploration and resource geologist with over 30 years experience; Polish and Canadian dual citizen with experience across Polish, JORC and NI 43-101 reporting standards Lech Lewczuk1 Exploration Manager  Previously Overseas Project Manage

  22. Slide 22: Capital Structure

    Capital Structure Tightly held capital structure and a strong liquidity position… Capital Structure Shares on Issue 118.8 million Share Price (17 October 2013) A$0.26 Market Capitalisation ~A$31 million Unlisted Options1 21.3 million Cash Plus Listed Securities (30 September ~A$15 million 2013) Ente

  23. Slide 23: Investment Highlights

    Investment Highlights Lublin Coal Project - Europe's Next Strategic Supply of Thermal Coal • 1.6Bt JORC Inferred In-Situ Coal Resource in the Lublin Coal Basin in Poland HIGH QUALITY LARGE-SCALE • Potentially a premium quality coal - 6,705kcal/kg GAD, 10.3% Ash raw1 PROJECT • Existing rail and port

  24. Slide 24: Disclaimer

    Disclaimer Important Information This presentation has been prepared as a summary only, and does not contain all information about Prairie Downs Metals Limited’s (“Prairie”) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities atta

  25. Slide 25: Appendices: Global Coal Producer Comparables

    Appendices: Global Coal Producer Comparables 25

Prairie Downs Metals — Investor Presentation (October 2013) on 6ix