  1. Slide 1: Financial Results 1Q 2025

    Slide 1: Financial Results 1Q 2025

    Financial Results 1Q 2025 Warsaw, June 2025

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Sales results and revenue perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01 Summary 1Q 2025

    Slide 3: Part 01 Summary 1Q 2025

    ROBYG PART O01 Summary 1Q 2025

  4. Slide 4: Summary 1Q 2025: revenues, cash, operating cash flow

    Slide 4: Summary 1Q 2025: revenues, cash, operating cash flow

    01. Summary 1Q 2025 Financial Results 1Q 2025 Revenues Strong cash position* Operating cash flow 177 mln PLN 267 mln PLN 181 mln PLN (excl. purchases of new plots) 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Summary 1Q 2025: units presold and land bank

    Slide 5: Summary 1Q 2025: units presold and land bank

    01. Summary 1Q 2025 Number of units under Units presold: Total land bank units construction 500 * 21 186 3 236 (net after cancellations) Units on offer Number of units recognised in revenues 1949 185 (out of which 1% finished goods) 5 * Incl. 66 agreements in jointly controlled projects

  6. Slide 6: Activities for other entities within TAG Poland

    Slide 6: Activities for other entities within TAG Poland

    01. Summary 1Q 2025 ROBYG Group’s activities for other entities within TAG Poland* Residential sales coordination General contractor services Revenue from services provided to Number of units contracted Number of units under construction other entities within TAG Poland in 1Q 2025: as of 31.03.2025:

  7. Slide 7: Material acquisitions and financial activities

    Slide 7: Material acquisitions and financial activities

    01. Summary 1Q 2025 Gdynia Warsaw Warsaw ROBYG Group – material acquisitions and financial activities New financing: NEW PLOTS 470 mln PLN approx. 318 mln PLN FINANCIAL ACTIVITY Area of plots [ha] Type of contracts Locations CREDIT FACILITIES 2,9 Final Wroclaw, Krzyki 7,3 Final Warsaw, Wilanów •revo

  8. Slide 8: Part 02 Sales results & revenue perspective

    Slide 8: Part 02 Sales results & revenue perspective

    P A R T 02 Sales results & revenue perspective 7

  9. Slide 9: Developer and preliminary agreements signed

    Slide 9: Developer and preliminary agreements signed

    02. Sales results & revenue perspective D e v e l o p e r a n d p r e l i m i n a r y a g r e e m e n t s s i g n e d i n 1 Q 2025: 388* 4308 17% 100% -5 0 % 3471 -27% 27% 2957 2% 31% 2 8 0 9 -3 3 % 10% 2 5 6 9 -16% 2520 22% 2333 2118 2156 2144 56% 1731 1891 9% 1019 1113 388 2011 2012 2013 2014 2015

  10. Slide 10: Pre-sold units in 1Q 2025 by city

    Slide 10: Pre-sold units in 1Q 2025 by city

    02. Sales results & revenue perspective 138 UNITS 27% GDANSK & GDYNIA Pre-sold units in 1Q 2025: 50 0 * 88 254 UNITS UNITS 18% 51% 18% POZNAN POZNAN WARSAW 4% WROCLAW 20 UNITS 27% GDANSK &GDYNIA 4% WROCLAW 51% WARSAW 9 * I n c l . 66 agreements in jointly controlled projects.

  11. Slide 11: ROBYG Group – units on offer

    Slide 11: ROBYG Group – units on offer

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e ROBYG Group – units on offer Number of units on offer FINISHED GOODS ON O F F E R : 1% 2297 112 1949* 1843 1777 1729 1695 23 1579 99 49 58 205 39 58 58 1926 2185 1744 1719 1524 1646 1540 1719** 1719** 3 Q 2023 4Q 2023 1Q 2024 2Q 2024

  12. Slide 12: Revenue recognition

    Slide 12: Revenue recognition

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e R O B Y G G r o u p – r e v e n u e r e c o g n i t i o n ( a s a t March 31st, 2025) Recognition potential of units in revenues: Number of units recognized in revenues (quarterly) Units not presold and not r e c o g n i z e d *: 1 94

  13. Slide 13: Units to be completed in 2025-2026

    Slide 13: Units to be completed in 2025-2026

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2025-2026 and also (contracted) until March 31st 2025 Total & contracted 2025 2026 2025+ 2 0 2 6 Total Total Total Contracted Contracted Contracted units units units R y t m M o k o t o w a , W e n d

  14. Slide 14: Units to be completed in 2025

    Slide 14: Units to be completed in 2025

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2025 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to Total no. of units to be Total no. of units to be Project Project Project be completed in 2025 completed in 2025 completed in 2

  15. Slide 15: Units to be completed in 2026

    Slide 15: Units to be completed in 2026

    02. S a l e s r e s u l t & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2026 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to Total no. of units to be Total no. of units to be Project Project Project be completed in 2026 completed in 2026 completed in 202

  16. Slide 16: Part 03 Financial results

    Slide 16: Part 03 Financial results

    P A R T 03 Financial results 16

  17. Slide 17: Financial results

    Slide 17: Financial results

    03. F i n a n c i a l r e s u l t s (PLNk) Q1 2025 Q1 2024 Change 2024 Revenues 176 846 401 824 (55,99%) 1 301 353 Sales of residential andcommercial units 99 725 374 989 (73,41%) 1 116 457 Revenues from sales to related parties 68 576 23 202 195,56% 166 513 Other revenues 8 545 3 633 135,21% 18 383

  18. Slide 18: Financial condition

    Slide 18: Financial condition

    03. F i n a n c i a l r e s u l t s Financial condition (PLNk) Q1 2025 Q1 2024 Change 2024 Total assets, including: 3 904 172 3 262 121 19,68% 3 565 598 Non-current assets, including: 1 262 686 733 576 72,13% 1 003 056 Investment properties and investment 931 189 455 648 104,37% 680 224 properties u

  19. Slide 19: Statement of cash flow

    Slide 19: Statement of cash flow

    03. F i n a n c i a l r e s u l t s Statement of cash flow (PLNk) Q1 2025 Q1 2024 2024 Net cash flows from operating activities, 8 406 233 138 64 028 including: Expenditures for the purchase of new plots (172 904) (11 300) (432 949) Net cash flows from investing activities, (223 322) (5 305) (272 20

  20. Slide 20: Debt financing

    Slide 20: Debt financing

    03. F i n a n c i a l r e s u l t s Debt financing Nominal value and maturity of bank credit facilities and bonds as at March 31st 2025 (PLNm). DEBT - Aging <1 y e a r 1-2 years 2-3 years 3-4 years 4 - 5 years O v e r 5 years Total BANK CREDIT 76,38 135,36 60,12 0,00 0,00 0,00 271,86 FACILITIES BOND

  21. Slide 21: Leverage and collections

    Slide 21: Leverage and collections

    03. F i n a n c i a l r e s u l t s Leverage and collections as at March 31st 2025 * Net debt ratio = net debt ** / equity ** N e t d e b t = in t e re st b e a rin g lia b ilit ies + d eriva t ives + g u a ra n t ees N e t d e b t r a t i o * = 0,25 g ra n t e d – in t e rc o mp a ny lo a n s – c a

  22. Slide 22: Part 04 Plans of ROBYG Group

    Slide 22: Part 04 Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 22

  23. Slide 23: Strategic goals

    Slide 23: Strategic goals

    04. Plans of ROBYG Group Strategic goals Residential sales in 2025 at the level of approx. 2 600 units* Increasing sales in the years ahead Maintaining of margins Expansion of activities in Warsaw, Wroclaw and Tricity Maintaining of the land bank level Realisation of the ESG strategy 23 * Incl. unit

  24. Slide 24: Strategy with TAG Immobilien

    Slide 24: Strategy with TAG Immobilien

    04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

  25. Slide 25: Total land bank

    Slide 25: Total land bank

    04. Plans of ROBYG Group Total land bank 21 186** units + 1 949 units on offer = 23 135 units Gdansk&Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Ujescisko 53 1% Wilanow 800 7% Krzyki 412 22% Piatkowo 453 18%

  26. Slide 26: Commercial potential

    Slide 26: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 80 200 sqm of usable area Commercial potential = 80 200 sqm of usable area WROCLAW* WARSAW GDANSK 35 000 30 000 15 200 TOTAL: 80 200 sqm *Preliminary land purchase agreements. 26

  27. Slide 27: Part 05 ESG

    Slide 27: Part 05 ESG

    PART 05 ESG Creating people and planet friendly spaces 27

  28. Slide 28: Mission, values and directions

    Slide 28: Mission, values and directions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and that are integrated with the surrounding car

  29. Slide 29: The biggest ESG successes in 2024

    Slide 29: The biggest ESG successes in 2024

    05. ESG FOR SOCIETY AND ENVIRONMENT The biggest ESG successes in 2024 Development of a consolidated sustainability report in cooperation Voluntary assurance of the New methodology for calculating with TAG, in accordance with the sustainability report by an external CO2e emission intensity and launch

  30. Slide 30: Environmental dimension – ROBYG for Planet

    Slide 30: Environmental dimension – ROBYG for Planet

    05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG for the Planet means that we lead a sustainable development process, and we fully respect the natural environment on all our projects. Strategic Goals 1. ROBYG as the number 1 low-carbon housing developer in Poland: • Continuation of reporting

  31. Slide 31: The Green Standard

    Slide 31: The Green Standard

    05. ESG – Environmental dimension ROBYG FOR PLANET THE GREEN STANDARD 15 minutes to ocal estates green ro ecological hotovoltaic mart ouse olar In 2024, the Management Boards of ROBYG S.A. all important and recreation facilities rain gardens panels system in benches and Vantage Development S.A. offi

  32. Slide 32: Social dimension – ROBYG for People

    Slide 32: Social dimension – ROBYG for People

    05. ESG – Social dimension ROBYG FOR PEOPLE For us, construction is part of the process of Strategic Goals creating new communities, which includes erecting buildings, developing infrastructure, shaping green areas, and creating spaces for 1. ROBYG Zero Accidents: zero serious and fatal accidents on

  33. Slide 33: Governance dimension – ROBYG for Sustainable Business

    Slide 33: Governance dimension – ROBYG for Sustainable Business

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES We act responsibly by choosing to partner with local businesses, caring for the natural environment and managing the company responsibly while delivering strong financial results. Sustainable governance also means that we communicate abou

  34. Slide 34: ESG

    Slide 34: ESG

    05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

  35. Slide 35: Part 06 Appendices

    Slide 35: Part 06 Appendices

    PART 06 Appendices 35

  36. Slide 36: Senior Management Team

    Slide 36: Senior Management Team

    06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 17 Y

  37. Slide 37: Ownership structure

    Slide 37: Ownership structure

    06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 37

  38. Slide 38: TAG Immobilien AG consolidated financials

    Slide 38: TAG Immobilien AG consolidated financials

    06. A p p e n d i c e s TAG Immobilien AG consolidated financials (EURm) Financial data (mln EUR) 1Q 2025 2024 2023 2022 2021 2020 2019 2018 Assets 8 210,80 7 750,25 7 299,80 8 214,60 7 088,60 6 478,00 5 647,00 5 033,30 Equi t y 3 154,10 3 099,85 2 964,50 3 307,70 3 129,50 2 681,50 2 394,20 2 048,30

  39. Slide 39: Under construction (1)

    Slide 39: Under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 35 No. of stages: 8 No. of stages: 14 Stages completed:

  40. Slide 40: Under construction (2)

    Slide 40: Under construction (2)

    06. Appendices Description of investments – under construction (2) Young City 2 Modern City Jagodno City: Warsaw City: Warsaw City: Wroclaw District: Bemowo District: Bemowo District: Krzyki No. of stages: 4 No. of stages: 9 No. of stages: 10 Stages completed: 2 Stages completed: 4 Stages completed:

  41. Slide 41: Under construction (3)

    Slide 41: Under construction (3)

    06. Appendices Description of investments – under construction (3) Osiedle Życzliwa Praga Nadmotławie Estate Szumilas City: Warsaw City: Gdansk City: Gdansk (Kowale) District: Tarchomin District: Śródmieście No. of stages: 8 No. of stages: 9 No. of stages: 6 Stages completed: 7 Stages completed: 4 S

  42. Slide 42: Under construction (4)

    Slide 42: Under construction (4)

    06. Appendices Description of investments – under construction (4) Royal Residence Porto Początek Piątkowo City: Warsaw City: Gdansk City: Poznan District: Wilanów District: Nowy Port District: Piątkowo No. of stages: 7 No. of stages: 6 No. of stages: 8 Stages completed: 5 Stages completed: 3 Stages

  43. Slide 43: Under construction (5)

    Slide 43: Under construction (5)

    06. Appendices Description of investments – under construction (5) Sady Ursynów Rytm Mokotowa Praga Piano City: Warsaw City: Warsaw City: Warsaw District: Ursynów District: Mokotów District: Praga Południe No. of stages: 5 No. of stages: 4 No. of stages: 1 Stages completed: 1 Stages under constructi

  44. Slide 44: Under construction (6)

    Slide 44: Under construction (6)

    06. Appendices Description of investments – under construction (6) Rosa Przystanek Tarnogaj Kobieli City: Gdansk City: Wroclaw City: Gdansk District: Ujeścisko District: Krzyki District: Brzezno No. of stages: 2 No. of stages : 1 No. of stages: 1 Stages under construction: 2 Stages under constructio

  45. Slide 45: Under construction (7)

    Slide 45: Under construction (7)

    06. Appendices Description of investments – under construction (7) Wendy Foresteria Apartamenty Krakowska City: Gdynia City: Gdynia City: Wroclaw District: Śródmieście District: Wielki Kack District: Krzyki No. of stages: 5 No. of stages: 7 No. of stages: 3 Stages under construction: 1 Stages under

  46. Slide 46: Under construction (8)

    Slide 46: Under construction (8)

    06. Appendices Description of investments – under construction (8) Leszczynskich 2 Nowa Walowa City: Gdansk City: Gdansk District: Ujescisko District: Srodmiescie No. of stages: 1 No. of stages: 3 Stages under construction: 1 Stages under construction: 1 No. of units: 137 units No. of units: 692 uni

  47. Slide 47: Completed (1)

    Slide 47: Completed (1)

    06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  48. Slide 48: Completed (2)

    Slide 48: Completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  49. Slide 49: Completed (3)

    Slide 49: Completed (3)

    06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  50. Slide 50: Completed (4)

    Slide 50: Completed (4)

    06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  51. Slide 51: Completed (5)

    Slide 51: Completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  52. Slide 52: Completed (6)

    Slide 52: Completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  53. Slide 53: Completed (7)

    Slide 53: Completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

  54. Slide 54: Completed (8)

    Slide 54: Completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

  55. Slide 55: Completed (9)

    Slide 55: Completed (9)

    06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

  56. Slide 56: Completed (10)

    Slide 56: Completed (10)

    06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

  57. Slide 57: Completed (11)

    Slide 57: Completed (11)

    06. Appendices Description of investments – completed (11) Kameralna Olszówka VISTA (Myśliwska) Wiśniowa Aleja City: Wroclaw City: Gdansk City: Gdansk District: Krzyki District: Piecki-Migowo District: Ujescisko No. of stages: 1 No. of stages: 1 No. of stages: 2 No. of units: 55 units No. of units:

  58. Slide 58: Completed (12)

    Slide 58: Completed (12)

    06. Appendices Description of investments – completed (12) Sea Salt Dożynkowa 43 Osiedle nad Widawą City: Gdansk City: Wroclaw City: Wroclaw District: Zaspa District: Krzyki District: Psie Pole No. of stages: 1 No. of stages: 1 No. of stages: 1 No. of units: 118 units No. of units: 11 units No. of u

  59. Slide 59: Completed (13)

    Slide 59: Completed (13)

    06. Appendices Description of investments – completed (13) Moment Lagom Nowa Letnica City: Gdansk City: Gdansk City: Gdansk District: Ujescisko District: Ujescisko District: Letnica No. of stages: 2 No. of stages: 1 No. of stages: 9 No. of units: 207 units No. of units: 41 units No. of units: 2 197

  60. Slide 60: Completed (14)

    Slide 60: Completed (14)

    06. Appendices Description of investments – completed (14) Mój Ursus Jutrzenki 92 City: Warsaw City: Warsaw District: Ursus District: Włochy No. of stages: 8 No. of stages: 1 No. of units: ca. 2 293 units No. of units: 142 units (completed: 1 616 units) Total sellable area: ca. 7.0k sqm Total sellab

  61. Slide 61: Disclaimer

    Slide 61: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

  62. Slide 62: Summary 1Q 2025 and contact

    Slide 62: Summary 1Q 2025 and contact

    Summary 1Q 2025 Please contact us: Units pre-sold: 500 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl Units on offer: 1 949 (out of which 1% are finished goods) (22) 419 11 00 Revenues: PLN 177 million Strong cash position*: PLN 267 million Operating cash flow: PLN 181 milli

Source: company website