Robyg S.A. · GPW:ROB
Robyg — Q1 2025 Earnings Presentation
62 slides from Robyg's earnings presentation, June 2025

Slide 1: Financial Results 1Q 2025
Financial Results 1Q 2025 Warsaw, June 2025

Slide 2: Agenda
AGENDA PART 01 Summary PART 02 Sales results and revenue perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

Slide 3: Part 01 Summary 1Q 2025
ROBYG PART O01 Summary 1Q 2025

Slide 4: Summary 1Q 2025: revenues, cash, operating cash flow
01. Summary 1Q 2025 Financial Results 1Q 2025 Revenues Strong cash position* Operating cash flow 177 mln PLN 267 mln PLN 181 mln PLN (excl. purchases of new plots) 4 * Including amounts kept on individual escrow accounts.

Slide 5: Summary 1Q 2025: units presold and land bank
01. Summary 1Q 2025 Number of units under Units presold: Total land bank units construction 500 * 21 186 3 236 (net after cancellations) Units on offer Number of units recognised in revenues 1949 185 (out of which 1% finished goods) 5 * Incl. 66 agreements in jointly controlled projects

Slide 6: Activities for other entities within TAG Poland
01. Summary 1Q 2025 ROBYG Group’s activities for other entities within TAG Poland* Residential sales coordination General contractor services Revenue from services provided to Number of units contracted Number of units under construction other entities within TAG Poland in 1Q 2025: as of 31.03.2025:

Slide 7: Material acquisitions and financial activities
01. Summary 1Q 2025 Gdynia Warsaw Warsaw ROBYG Group – material acquisitions and financial activities New financing: NEW PLOTS 470 mln PLN approx. 318 mln PLN FINANCIAL ACTIVITY Area of plots [ha] Type of contracts Locations CREDIT FACILITIES 2,9 Final Wroclaw, Krzyki 7,3 Final Warsaw, Wilanów •revo

Slide 8: Part 02 Sales results & revenue perspective
P A R T 02 Sales results & revenue perspective 7

Slide 9: Developer and preliminary agreements signed
02. Sales results & revenue perspective D e v e l o p e r a n d p r e l i m i n a r y a g r e e m e n t s s i g n e d i n 1 Q 2025: 388* 4308 17% 100% -5 0 % 3471 -27% 27% 2957 2% 31% 2 8 0 9 -3 3 % 10% 2 5 6 9 -16% 2520 22% 2333 2118 2156 2144 56% 1731 1891 9% 1019 1113 388 2011 2012 2013 2014 2015

Slide 10: Pre-sold units in 1Q 2025 by city
02. Sales results & revenue perspective 138 UNITS 27% GDANSK & GDYNIA Pre-sold units in 1Q 2025: 50 0 * 88 254 UNITS UNITS 18% 51% 18% POZNAN POZNAN WARSAW 4% WROCLAW 20 UNITS 27% GDANSK &GDYNIA 4% WROCLAW 51% WARSAW 9 * I n c l . 66 agreements in jointly controlled projects.

Slide 11: ROBYG Group – units on offer
02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e ROBYG Group – units on offer Number of units on offer FINISHED GOODS ON O F F E R : 1% 2297 112 1949* 1843 1777 1729 1695 23 1579 99 49 58 205 39 58 58 1926 2185 1744 1719 1524 1646 1540 1719** 1719** 3 Q 2023 4Q 2023 1Q 2024 2Q 2024

Slide 12: Revenue recognition
02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e R O B Y G G r o u p – r e v e n u e r e c o g n i t i o n ( a s a t March 31st, 2025) Recognition potential of units in revenues: Number of units recognized in revenues (quarterly) Units not presold and not r e c o g n i z e d *: 1 94

Slide 13: Units to be completed in 2025-2026
02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2025-2026 and also (contracted) until March 31st 2025 Total & contracted 2025 2026 2025+ 2 0 2 6 Total Total Total Contracted Contracted Contracted units units units R y t m M o k o t o w a , W e n d

Slide 14: Units to be completed in 2025
02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2025 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to Total no. of units to be Total no. of units to be Project Project Project be completed in 2025 completed in 2025 completed in 2

Slide 15: Units to be completed in 2026
02. S a l e s r e s u l t & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2026 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to Total no. of units to be Total no. of units to be Project Project Project be completed in 2026 completed in 2026 completed in 202

Slide 16: Part 03 Financial results
P A R T 03 Financial results 16

Slide 17: Financial results
03. F i n a n c i a l r e s u l t s (PLNk) Q1 2025 Q1 2024 Change 2024 Revenues 176 846 401 824 (55,99%) 1 301 353 Sales of residential andcommercial units 99 725 374 989 (73,41%) 1 116 457 Revenues from sales to related parties 68 576 23 202 195,56% 166 513 Other revenues 8 545 3 633 135,21% 18 383

Slide 18: Financial condition
03. F i n a n c i a l r e s u l t s Financial condition (PLNk) Q1 2025 Q1 2024 Change 2024 Total assets, including: 3 904 172 3 262 121 19,68% 3 565 598 Non-current assets, including: 1 262 686 733 576 72,13% 1 003 056 Investment properties and investment 931 189 455 648 104,37% 680 224 properties u

Slide 19: Statement of cash flow
03. F i n a n c i a l r e s u l t s Statement of cash flow (PLNk) Q1 2025 Q1 2024 2024 Net cash flows from operating activities, 8 406 233 138 64 028 including: Expenditures for the purchase of new plots (172 904) (11 300) (432 949) Net cash flows from investing activities, (223 322) (5 305) (272 20

Slide 20: Debt financing
03. F i n a n c i a l r e s u l t s Debt financing Nominal value and maturity of bank credit facilities and bonds as at March 31st 2025 (PLNm). DEBT - Aging <1 y e a r 1-2 years 2-3 years 3-4 years 4 - 5 years O v e r 5 years Total BANK CREDIT 76,38 135,36 60,12 0,00 0,00 0,00 271,86 FACILITIES BOND

Slide 21: Leverage and collections
03. F i n a n c i a l r e s u l t s Leverage and collections as at March 31st 2025 * Net debt ratio = net debt ** / equity ** N e t d e b t = in t e re st b e a rin g lia b ilit ies + d eriva t ives + g u a ra n t ees N e t d e b t r a t i o * = 0,25 g ra n t e d – in t e rc o mp a ny lo a n s – c a

Slide 22: Part 04 Plans of ROBYG Group
PART 04 Plans of ROBYG Group 22

Slide 23: Strategic goals
04. Plans of ROBYG Group Strategic goals Residential sales in 2025 at the level of approx. 2 600 units* Increasing sales in the years ahead Maintaining of margins Expansion of activities in Warsaw, Wroclaw and Tricity Maintaining of the land bank level Realisation of the ESG strategy 23 * Incl. unit

Slide 24: Strategy with TAG Immobilien
04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

Slide 25: Total land bank
04. Plans of ROBYG Group Total land bank 21 186** units + 1 949 units on offer = 23 135 units Gdansk&Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Ujescisko 53 1% Wilanow 800 7% Krzyki 412 22% Piatkowo 453 18%

Slide 26: Commercial potential
04. Plans of ROBYG Group Commercial potential = 80 200 sqm of usable area Commercial potential = 80 200 sqm of usable area WROCLAW* WARSAW GDANSK 35 000 30 000 15 200 TOTAL: 80 200 sqm *Preliminary land purchase agreements. 26

Slide 27: Part 05 ESG
PART 05 ESG Creating people and planet friendly spaces 27

Slide 28: Mission, values and directions
05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and that are integrated with the surrounding car

Slide 29: The biggest ESG successes in 2024
05. ESG FOR SOCIETY AND ENVIRONMENT The biggest ESG successes in 2024 Development of a consolidated sustainability report in cooperation Voluntary assurance of the New methodology for calculating with TAG, in accordance with the sustainability report by an external CO2e emission intensity and launch

Slide 30: Environmental dimension – ROBYG for Planet
05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG for the Planet means that we lead a sustainable development process, and we fully respect the natural environment on all our projects. Strategic Goals 1. ROBYG as the number 1 low-carbon housing developer in Poland: • Continuation of reporting

Slide 31: The Green Standard
05. ESG – Environmental dimension ROBYG FOR PLANET THE GREEN STANDARD 15 minutes to ocal estates green ro ecological hotovoltaic mart ouse olar In 2024, the Management Boards of ROBYG S.A. all important and recreation facilities rain gardens panels system in benches and Vantage Development S.A. offi

Slide 32: Social dimension – ROBYG for People
05. ESG – Social dimension ROBYG FOR PEOPLE For us, construction is part of the process of Strategic Goals creating new communities, which includes erecting buildings, developing infrastructure, shaping green areas, and creating spaces for 1. ROBYG Zero Accidents: zero serious and fatal accidents on

Slide 33: Governance dimension – ROBYG for Sustainable Business
05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES We act responsibly by choosing to partner with local businesses, caring for the natural environment and managing the company responsibly while delivering strong financial results. Sustainable governance also means that we communicate abou

Slide 34: ESG
05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

Slide 35: Part 06 Appendices
PART 06 Appendices 35

Slide 36: Senior Management Team
06. Appendices Senior Management Team Oscar Kazanelson Artur Ceglarz Dariusz Pawlukowicz Eyal Keltsh Marta Hejak Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Years at ROBYG: 20+ Years at ROBYG: 17 Y

Slide 37: Ownership structure
06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 37

Slide 38: TAG Immobilien AG consolidated financials
06. A p p e n d i c e s TAG Immobilien AG consolidated financials (EURm) Financial data (mln EUR) 1Q 2025 2024 2023 2022 2021 2020 2019 2018 Assets 8 210,80 7 750,25 7 299,80 8 214,60 7 088,60 6 478,00 5 647,00 5 033,30 Equi t y 3 154,10 3 099,85 2 964,50 3 307,70 3 129,50 2 681,50 2 394,20 2 048,30

Slide 39: Under construction (1)
06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 35 No. of stages: 8 No. of stages: 14 Stages completed:

Slide 40: Under construction (2)
06. Appendices Description of investments – under construction (2) Young City 2 Modern City Jagodno City: Warsaw City: Warsaw City: Wroclaw District: Bemowo District: Bemowo District: Krzyki No. of stages: 4 No. of stages: 9 No. of stages: 10 Stages completed: 2 Stages completed: 4 Stages completed:

Slide 41: Under construction (3)
06. Appendices Description of investments – under construction (3) Osiedle Życzliwa Praga Nadmotławie Estate Szumilas City: Warsaw City: Gdansk City: Gdansk (Kowale) District: Tarchomin District: Śródmieście No. of stages: 8 No. of stages: 9 No. of stages: 6 Stages completed: 7 Stages completed: 4 S

Slide 42: Under construction (4)
06. Appendices Description of investments – under construction (4) Royal Residence Porto Początek Piątkowo City: Warsaw City: Gdansk City: Poznan District: Wilanów District: Nowy Port District: Piątkowo No. of stages: 7 No. of stages: 6 No. of stages: 8 Stages completed: 5 Stages completed: 3 Stages

Slide 43: Under construction (5)
06. Appendices Description of investments – under construction (5) Sady Ursynów Rytm Mokotowa Praga Piano City: Warsaw City: Warsaw City: Warsaw District: Ursynów District: Mokotów District: Praga Południe No. of stages: 5 No. of stages: 4 No. of stages: 1 Stages completed: 1 Stages under constructi

Slide 44: Under construction (6)
06. Appendices Description of investments – under construction (6) Rosa Przystanek Tarnogaj Kobieli City: Gdansk City: Wroclaw City: Gdansk District: Ujeścisko District: Krzyki District: Brzezno No. of stages: 2 No. of stages : 1 No. of stages: 1 Stages under construction: 2 Stages under constructio

Slide 45: Under construction (7)
06. Appendices Description of investments – under construction (7) Wendy Foresteria Apartamenty Krakowska City: Gdynia City: Gdynia City: Wroclaw District: Śródmieście District: Wielki Kack District: Krzyki No. of stages: 5 No. of stages: 7 No. of stages: 3 Stages under construction: 1 Stages under

Slide 46: Under construction (8)
06. Appendices Description of investments – under construction (8) Leszczynskich 2 Nowa Walowa City: Gdansk City: Gdansk District: Ujescisko District: Srodmiescie No. of stages: 1 No. of stages: 3 Stages under construction: 1 Stages under construction: 1 No. of units: 137 units No. of units: 692 uni

Slide 47: Completed (1)
06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

Slide 48: Completed (2)
06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

Slide 49: Completed (3)
06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

Slide 50: Completed (4)
06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

Slide 51: Completed (5)
06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

Slide 52: Completed (6)
06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

Slide 53: Completed (7)
06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

Slide 54: Completed (8)
06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

Slide 55: Completed (9)
06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

Slide 56: Completed (10)
06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

Slide 57: Completed (11)
06. Appendices Description of investments – completed (11) Kameralna Olszówka VISTA (Myśliwska) Wiśniowa Aleja City: Wroclaw City: Gdansk City: Gdansk District: Krzyki District: Piecki-Migowo District: Ujescisko No. of stages: 1 No. of stages: 1 No. of stages: 2 No. of units: 55 units No. of units:

Slide 58: Completed (12)
06. Appendices Description of investments – completed (12) Sea Salt Dożynkowa 43 Osiedle nad Widawą City: Gdansk City: Wroclaw City: Wroclaw District: Zaspa District: Krzyki District: Psie Pole No. of stages: 1 No. of stages: 1 No. of stages: 1 No. of units: 118 units No. of units: 11 units No. of u

Slide 59: Completed (13)
06. Appendices Description of investments – completed (13) Moment Lagom Nowa Letnica City: Gdansk City: Gdansk City: Gdansk District: Ujescisko District: Ujescisko District: Letnica No. of stages: 2 No. of stages: 1 No. of stages: 9 No. of units: 207 units No. of units: 41 units No. of units: 2 197

Slide 60: Completed (14)
06. Appendices Description of investments – completed (14) Mój Ursus Jutrzenki 92 City: Warsaw City: Warsaw District: Ursus District: Włochy No. of stages: 8 No. of stages: 1 No. of units: ca. 2 293 units No. of units: 142 units (completed: 1 616 units) Total sellable area: ca. 7.0k sqm Total sellab

Slide 61: Disclaimer
Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

Slide 62: Summary 1Q 2025 and contact
Summary 1Q 2025 Please contact us: Units pre-sold: 500 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl Units on offer: 1 949 (out of which 1% are finished goods) (22) 419 11 00 Revenues: PLN 177 million Strong cash position*: PLN 267 million Operating cash flow: PLN 181 milli
Source: company website
More decks from Robyg S.A.
H1 2026 Earnings Presentation63 slides · September 2026
H1 2026 Earnings Presentation63 slides · September 2026
Investor Presentation (August 2026)57 slides · August 2026
Q1 2026 Earnings Presentation64 slides · June 2026
Investor Presentation (May 2026)113 slides · May 2026
FY2025 Earnings Presentation63 slides · March 2026