Power Mech Projects Ltd. · NSE:POWERMECH

Power Mech Projects — H1 FY20 Earnings Presentation

35 slides from Power Mech Projects's earnings presentation, Nov 18, 2019

  1. Slide 1: Investor Presentation Q2 & H1 FY20

    Investor Presentation Q2 & H1 FY20 POWER MECH PROJECTS LTD Growth Unlimited 17th Nov 2019

  2. Slide 2: Disclaimer

    Disclaimer Safe Harbor Statement  The information contained herein has been prepared to assist prospective investors in making their own evaluation of Power Mech Projects Limited (hereinafter ‘the company’) and does not purport to be all-inclusive or to contain all of the information a prospective

  3. Slide 3: Power Mech – At a Glance

    Power Mech – At a Glance A leading Industrial Services and Construction Company providing versatile and comprehensive service in power and infrastructure sector Largest O&M service FY 19 Established in 1999 by Presently Operates Pan- Total Income: Rs 22,754 Mn Mr. S. Kishore Babu, a India, Middle Ea

  4. Slide 4: Journey of the Company, Major milestones and achievements

    Journey of the Company, Major milestones and achievements → Listing in BSE & NSE, overwhelming response → First ETC of 1 X 63 Tph and 2 X 165 → Private Equity into Power Mech subscribed by 38 times Tph AFBC Boilers, 20.85 MW & 55 → First major international work in Libya, 2X157 MW Erection → Major O

  5. Slide 5: Established Track Record

    Established Track Record Integrated power infrastructure services Track record of ~20 years  Established a track record of successfully 26,00,000 MT of aggregate tonnage of the erection works executed executing ETC-BTG and BOP contracts for large power projects 64,000 MW, engaged on ETC-BTG and BOP

  6. Slide 6: Our Service presence across key areas

    Our Service presence across key areas Industrial Industrial Construction Construction Industrial Services (O&M) International Operations Infrastructure Construction (Civil) Power Projects (Ultra Mega, Super  Overhauling and Maintenance of  Erection, Testing & Commissioni Power Plants, Railway, Ind

  7. Slide 7: Our Service presence across key areas (cont..)

    Our Service presence across key areas (cont..) Industrial Construction Electricals Hydro Power & Water Manufacturing  Extra High Voltage Substation  Supply & construction of Hydro  Fabrication of Heavy Structures, Works power plants Large & High Pressure Tanks,  Construction of 33/11 Kv  Renova

  8. Slide 8: Company Strengths

    Company Strengths Large talent with Highly Experienced Management Comprehensive service provider in Power Team with strong industry background Sector Largest service provider in O&M space Strong execution capabilities across verticals Well diversified business profile with stable Marquee clientele:

  9. Slide 9: Qualified Board

    Qualified Board Sajja Kishore Babu, CMD Sajja Lakshmi, Non Executive Director Founder of the company holds bachelor’s degree in She is a science graduate and holds place in HR Mechanical Engineering. He has 35 years of experience management of the company & also member of CSR in power and infra sect

  10. Slide 10: Professional and Experienced Management Team

    Professional and Experienced Management Team M. Rajendran, COO S Kodandaramaiah, Director – Business Development Degree in Civil Engineering. He has more than 38 years of experience Post graduate in mechanical engineering. More than 4 decades of in construction & project management in power & indust

  11. Slide 11: Shareholding Pattern Top Shareholders

    Shareholding Pattern Top Shareholders S No Name Shares Category Percentage 1 HDFC Small Cap Fund 9,83,126 MUT 6.68% Promoters 3.30% 2.72% 2 Vantage Equity Fund 6,95,000 AIF 4.72% 3.30% 0.67% Resident Individuals 3 IDFC Multi Cap Fund 4,17,737 MUT 2.84% 6.66% 7.21% 4 Banyantree Growth Capital II L.L.

  12. Slide 12: Established Relationships with Clients – Domestic Projects

    Established Relationships with Clients – Domestic Projects 12

  13. Slide 13: Established Relationships with Clients – International Projects

    Established Relationships with Clients – International Projects 13

  14. Slide 14: Infra for Project Management

    Infra for Project Management Large construction equipment base Primavera SAP & Site level Support functions MS Project- Productivity Application SBU Heads 9,100 HR Base For Project Engineers, Supervisors, Responsibility Technicians, HSE, FQA Other Staff Capability Centers Construction, Quality, Safe

  15. Slide 15: Business Strategy

    Business Strategy Expanding the services footprint & leveraging technical expertise to target higher margin contracts Offer comprehensive O&M solutions Working on advanced project execution methodologies & improve cash flow  Fully established manufacturing setup available at Noida for non critical

  16. Slide 16: Expanding Services Footprint

    Expanding Services Footprint  48 GW Capacity addition up to 2022  Presently 15 GW opportunities in BTG & ETC value of Rs 15 Billion Domestic  Green & Brown field expansion, 5,000 MW of EPC tenders in pipe line Power, FGD,  Estimated that Rs 200 Billion to Rs 300 Billion worth of investments are

  17. Slide 17: Expanding Services Footprint (cont…)

    Expanding Services Footprint (cont…)  Substantial growth is expected, installed base of 252 M MT enhance to 320M MT by 2030-31 by way of brown field & green filed refineries, augmenting the capacities  Annul investments in the range of Rs 600 Billion to Rs 800 Billion Oil & Gas  The construction

  18. Slide 18: Expanding of O&M service into other sectors & new horizons

    Expanding of O&M service into other sectors & new horizons Solar Thermal Hydro Domestic O&M (AMC, R&M, GAS Steel Trouble (Power) shooting etc) Fully developed Captive Exports Power (Thermal) Partially developed Refinery & Petro Chemicals To be developed 18

  19. Slide 19: Expanding Horizons…… Broadening Capabilities

    Expanding ExpandingHorizons…… Horizons…… …..Broadening …..BroadeningCapabilities Capabilities 19

  20. Slide 20: Q2 FY20 – YoY Consolidated Financial Performance

    Q2 FY20 – YoY Consolidated Financial Performance INR in million Total Income EBIDTA PAT 400 351 725 722 5,390 5,383 284 720 300 5,380 6.6% 5,370 200 715 5,355 13.4% 711 5.3% 5,360 710 100 5,350 13.3% 5,340 705 - Q2FY19 Q2FY20 Q2FY19 Q2FY20 Q2FY19 Q2FY20 Q2 Revenue Erection O&M Electrical Works Civil

  21. Slide 21: H1 FY20 – YoY Consolidated Financial Performance

    H1 FY20 – YoY Consolidated Financial Performance INR in million Total Income EBIDTA PAT 10,400 1,373 635 1,375 700 10,285 10,300 600 528 1,370 500 10,200 1,365 13.3% 6.2% 400 10,100 10,030 1,360 1,358 300 5.3% 200 10,000 1,355 13.5% 100 9,900 1,350 - H1FY19 H1FY20 H1FY19 H1FY20 H1FY19 H1FY20 H1 FY 2

  22. Slide 22: FY19 Financial Performance (consolidated)

    FY19 Financial Performance (consolidated) INR in million Contract Revenue Revenue mix with high-margin O&M services segment 13,650 13,778 13,344 15,439 22,566 2% EBITDA Margins continue to remain healthy…. Profit After Tax inching higher 22

  23. Slide 23: FY19 Financial Performance (consolidated)

    FY19 Financial Performance (consolidated) INR in million Healthy net debt equity ratio provides significant headroom for growth High Asset Turnover … testament to higher efficiency 23

  24. Slide 24: Robust Order Book: Stronger Revenue visibility for next 3 years

    Robust Order Book: Stronger Revenue visibility for next 3 years INR in million 68,943 70,000 15% 60,000 49 % 48,832 50,000 85% 42,677 35,238 37,050 Contract Revenue 40,000 34,063 Order Inflow 30,000 21,064 22,566 Order Back Log 19,420 15,375 17,950 20,000 13,650 13,778 15,439 13,344 34% 10,000 - 55%

  25. Slide 25: Robust Order Book: Stronger Revenue visibility for next 3 years (cont..)

    Robust Order Book: Stronger Revenue visibility for next 3 years (cont..) INR in million Order Inflow during H1 FY 20 (up to 30th Sep 2019) Order backlog as on 30th Sep 2019 Rs. 72,130 Mn Rs. 13,402 Mn Erection 34 % 3,583 Erection 41 % O&M 24,160 O&M 27 % 5,528 Electrical Works 33,213 Electrical Work

  26. Slide 26: Key Orders won during FY18, FY19 & FY20

    Key Orders won during FY18, FY19 & FY20 Domestic / Key projects received Location Segment Rs Mn International during FY 18/ FY19 & Q1FY20 Erection, testing, commissioning of boiler and its auxiliaries, BHEL Bangladesh ETC 1,080 Structural & Architectural works (except Pile, Pile Cap and Pedestal of

  27. Slide 27: Key Orders won during FY18, FY19 & FY20

    Key Orders won during FY18, FY19 & FY20 Domestic / Key projects received Location Segment Rs Mn International during FY 18/ FY19 & Q1FY20 Operation and Maintenance contract for 2*800 MW Coal based Yeramarus Thermal Karnataka O&M 1,090 Power Station , Raichur Power Corporation Ltd Design, Fabrication

  28. Slide 28: Financial Snapshot | Consolidated Income Statement & Balance Sheet

    Financial Snapshot | Consolidated Income Statement & Balance Sheet INR in million Income Statement (Consolidated) Balance Sheet (Consolidated) Particulars FY15 FY16* FY17* FY18* H1 FY19* FY19* Particulars FY15 FY16 * FY17* FY18* H1 FY19* FY19* Revenue from operations 13,662 13,782 13,382 15,478 9,96

  29. Slide 29: Our Projects

    POWER MECH _ Growth Unlimited Our Projects 29

  30. Slide 30: Industrial Construction: Domestic Projects (Erection, Testing & Commissioning)

    INDUSTRIAL CONSTRUCTION: DOMESTIC PROJECTS (ERECTION, TESTING & COMMISSIONING) 1X660 MW TPP, BTG, HARDUAGANJ, DOOSAN 3X660 MW ,BOILER, ESP,CP, STRUCTURE & STG, 2X500 MW STPP,BOILER, ESP STG, BOILER, ESP, TG AUXILIARIES, UMPP BOILER, ESP, STRUCTURE, TG NABINAGAR, BHEL VINDHYACHAL, BHEL (COMPLETED) 80

  31. Slide 31: Infrastructure Construction: Civil, Architectural & Railway Works

    INFRASTRUCTURE CONSTRUCTION : CIVIL, ARCHITECTURAL & RAILWAY WORKS 1X800 MW TPSS, CIVIL, STRUCTURAL AND 1X800 MW TPSS, CIVIL, STRUCTURAL AND GDV-MTM 37 ,DOUBLING & 1X500MW, FGUTTP, CIVIL, STRUCTURAL 2X800 MW, YTPS, CIVIL, STRUCTURAL ARCHITECTURAL WORK UNIT-12, ARCHITECTURAL WORK STAGE-3, NORTH ELECT

  32. Slide 32: International Operations

    INTERNATIONAL OPERATIONS 250 MW SABIYA CCPP, KUWAIT 2X157 MW GT POWER PLANT, LIBYA 6X200 MW HEP, BHUTAN 1800 MW ALBA CCPP, BAHRAIN 360MW BHERAMARA CCPP, INSTALLATION OF HRSG (COMPLETED) INSTALLATION OF HYDRO ETC OF GTG,STG,HRSG & BOP BANGLADESH INSTALLATION OF GTG, TURBINE & GENERATOR STG & HRSG 151

  33. Slide 33: Operation and Maintenance

    OPERATION AND MAINTANENCE SIEMENS -138MW GAS TURBINE TG OVERHAUING 600MW JHARSUGUDA BEARING DIASSEMBLY AT NTPC-SIMHADRI CONTROL & STOP VALVES OVERHAULING PAGUTHAN VEDANTA SIPAT 660MW CAPITAL OVERHAULING OF TURBINE 63MW, HP HEATER REPLACEMENT 800MW ,CGPL CUPLOCK SCAFFOLDING ERECTION MSH LINE MODIFICA

  34. Slide 34: Manufacturing Facility & Hydro Power Services

    MANUFACTURING FACILITY & HYDRO POWER SERVICES MANUFACTURING UNIT (NOIDA) CNC SECTION (NOIDA) SR FURNACE (NOIDA) CNC OXY FUEL CUTTING (NOIDA) HEAVY DUTY CENTRE LATHES( NOIDA) VTL(MANUAL+CNC (NOIDA) PLANO MILLER, CND (NOIDA) 3 ROLL PLATE BENDING MACHINE (NOIDA) HYDRO GENERATOR UNDER ASSEMBLY FOR FRANC

  35. Slide 35: Thank You

    Thank You For investor queries, please contact: Mr. Rohit Tibrewal, Company Secretary Ph: +91-040-30444418 Mobile No: +91 9160325151 Email: cs@powermech.net 35