Golden Predator Mining Corp

Golden Predator Mining — Investor Presentation (July 2015)

21 slides from Golden Predator Mining's investor presentation, July 2015

  1. Slide 1: Corporate Presentation July 2015

    CORPORATE PRESENTATION JULY 2015

  2. Slide 2: Disclaimer

    Disclaimer ©2015 Golden Predator Mining Corp. All rights reserved. Unless otherwise noted, “Golden Predator” and all other marks used in this presentation are trademarks of Golden Predator (the “Company”). Any reproduction or dissemination of any feature of this presentation, in whole or in part, or

  3. Slide 3: Corporate Highlights

    Corporate Highlights • A strong portfolio of advanced-stage projects in North America; pursuing a joint venture strategy to maximize value of current portfolio while limiting expenditures • Board and management have financial and political backgrounds necessary to de- risk and advance key projects •

  4. Slide 4: Corporate Projects Overview

    Corporate Projects Overview Brewery Creek Project The Brewery Creek project is a past producing heap leach gold mine with expanded current oxide resources and several new discoveries. A preliminary economic assessment was completed in Q4 2014; 3 Aces Project Completed gold deportment and gravity rec

  5. Slide 5: Corporate Structure

    Corporate Structure Share Structure Market Capitalization (@ $0.085) 2.69 mm Shares Issued and Outstanding 31.7 mm Stock Options 1.1 mm Fully Diluted 32.8 mm Institutional Management (As of July 28, 2015) Retail Brewery Creek Circa Late 1990s Prominent Shareholders • Till Capital Ltd. (~60%) • Power

  6. Slide 6: Leadership

    Leadership Blair Shilleto| Co-Chairman • Involved in the mining, tunneling and construction industry since 1976 when he worked for the United Keno Hill Mine in Yukon; has managed projects throughout North America • Self-employed consultant since 2006 to the mining contract and exploration industry,

  7. Slide 7: Portfolio Highlights – Available for JV

    Portfolio Highlights – Available for JV Golden Predator seeks to maximize value in its project portfolio by investing funds towards completing exploration and permitting objectives that will increase financial returns from future JV partners Brewery Creek – Advanced Oxide Gold Deposit with PEA Compl

  8. Slide 8: Brewery Creek Project - Overview

    Brewery Creek Project - Overview • Past open pit heap leach producer from 1996- 2002 before closing due to low gold prices • Preliminary Economic Assessment completed in Q4, 2014 • Since 2009, +$30 MM spent on drilling approximately 100,000 meters increasing indicated and inferred resources by 400%

  9. Slide 9: Preliminary Economic Assessment

    Preliminary Economic Assessment(1) PEA Summary Mine Plan and Operating Assumptions Total Oxide mined from Open Pits (tonnes) 10,264,000 Total Waste mined from Open Pits (tonnes) 43,520,000 Strip Ratio open pits 4.2:1 Total Gold Ounces Contained 445,000 Average Diluted Grade g/t Gold Open Pits 1.351

  10. Slide 10: Preliminary Economic Assessment

    Preliminary Economic Assessment(1) Base Case $1250/oz. Gold  Truck and shovel operation mining from eight PEA Capital and Operating Costs open pits with reprocessing of portion of former Capital Costs (including contingency) Total Direct Capital $59,480,000 leach material Capitalized Mining Costs (

  11. Slide 11: 3Aces Project - Overview

    3Aces Project - Overview • New high grade gold discovery in SE Yukon • Extensive gold anomalies have been identified over 9 km2 – the majority of which remain to be drill tested • Drilling to-date has focused on the Main and Sleeping Giant Zones • Recent metallurgical tests completed on 3 samples ha

  12. Slide 12: 3Aces Project – An Emerging High Grade Gold District

    3Aces Project – An Emerging High Grade Gold District • High-grade mineralized shoots outcrop at surface • Grab samples up to 4,820 g/t gold with multiple +1,000 g/t specimens from Main and Sleeping Giant zones(7) • Channel samples include 5.2 meters of 448 g/t gold(11) • Initial drill results includ

  13. Slide 13: Castle West, Nevada – New Prospect

    Castle West, Nevada – New Prospect Heap leachable oxide gold target in Nevada’s Walker Lane Gold Trend • Vehicle accessible 30 miles west of Tonopah, Nevada • Previous exploration has identified three primary areas of gold mineralization: • Castle Main • West Castle • Golden Rod • 10 miles from Colu

  14. Slide 14: Castle West, Nevada

    Castle West, Nevada • Volcanic hosted, low sulfidation epithermal gold system • Project was most recently explored by Kinross (2008- Picture? Or have Joe make 2010), including: another map… • 769 surface rock chip samples collected with a mean value of 579 ppb. • 35 reverse circulation drill holes c

  15. Slide 15: Grew Creek Project

    Grew Creek Project • Bonanza epithermal gold system located within the Tintina Trench • Analogous to Midas, Sleeper, Comstock deposits in Great Basin Nevada • AMB drilled ~20,000 meters from 2010-2011 at the Carlos Zone, intercepts include: • GCRC11‐326 - 76 m of 2.22 g/t gold including 2 m of 15.55

  16. Slide 16: Sonora Gulch Project

    Sonora Gulch Project • Large, multi-centre porphyry system located between Casino Deposit (WRN.T) and Freegold Mountain Deposit (NFR.V); new proposed Casino road to provide improved access for Sonora Gulch Project • Potential for high grade and bulk tonnage mineralization over 9 km2 gold anomaly, in

  17. Slide 17: Marg Deposit

    Marg Deposit • Currently under option to Minquest Limited • Polymetallic VMS deposit with a current mineral resource estimate(3) • Existing resource open to expansion with numerous untested targets • 40 km winter road from Keno City; airstrip on site • Camp and heavy equipment on site • Class 3 Land

  18. Slide 18: Additional Properties Available for JV or Option

    Additional Properties Available for JV or Option Project Location Stage Deposit Type Highlights Gold Dome Yukon Adv. Exploration Intrusion-related Drill intercepts include 10.45 m of 12.96 g/t gold Cache Creek Yukon New Discovery Intrusion-related Initial drilling results - 77 m of 0.51 g/t gold fro

  19. Slide 19: Summary

    Summary A joint venture strategy to maximize existing portfolio while limiting expenditures Attractive valuation based on Brewery Creek project; with reasonable timelines and capital costs to develop to production Brewery Creek Preliminary Economic Assessment released in Q4 A robust portfolio of ass

  20. Slide 20: Endnotes

    Endnotes 1) NI 43-101 Technical Report on Preliminary Economic Assessment for the Brewery Creek Property, Yukon Territory, Canada, Tetra-Tech EBA dated November 19, 2014 and filed on SEDAR. 2) Northern Tiger News Release dated November 4, 2010. 3) NI 43-101 Technical Report, Marg Volcanoegenic Massi

  21. Slide 21: www.goldenpredator.com

    510-580 Hornby Street Vancouver, BC Canada V6C 3B6 Investor Relations T: 778-847-3351 E: info@goldenpredator.com www.goldenpredator.com

Golden Predator Mining — Investor Presentation (July 2015) on 6ix