Triangle Energy (Global) Limited · ASX:TEG

Triangle Energy (Global) — Investor Presentation (March 2013)

19 slides from Triangle Energy (Global)'s investor presentation, March 2013

  1. Slide 1: Corporate Presentation Indonesia

    Slide 1: Corporate Presentation Indonesia

    CORPORATE PRESENTATION Indonesia MARCH 2013

  2. Slide 2: Important Notice

    Slide 2: Important Notice

    Important Notice The information in this presentation is in summary form and should not be relied upon as a complete and accurate representation of any matters that a potential investor should consider in evaluating Triangle Energy (Global) Ltd. While management has taken every effort to ensure the

  3. Slide 3: Triangle Energy (Global) Limited Corporate

    Slide 3: Triangle Energy (Global) Limited Corporate

    Triangle Energy (Global) Limited Corporate Issued Capital Directors Ordinary Shares 1425m John Towner, Executive Chairman Unlisted rights 56.75m Robert Lemmey, Non-Executive Director $0.01 Options 27.00m Steven Hammer, Non-Executive Director Lewis Johnson, Non-Executive Director Market Capitalisatio

  4. Slide 4: Why Aceh?

    Slide 4: Why Aceh?

    Why Aceh? DRAFT • North Sumatran Basin – Proven hydrocarbons – Mega fields EG Arun – Multiple play types • Under explored area due largely to civil war • Majors only looking for mega fields • Large inventory of prospects and leads left by Mobil following merger with Exxon • Extensive seismic coverag

  5. Slide 5: Aceh

    Slide 5: Aceh

    Aceh DRAFT • Management team with extensive experience in Indonesian oil and gas industry • Successful rejuvenation and operation of the Pase field since July 2009 without incident • Aceh government appointed Triangle as their partner • Existing gas production with significant development and explor

  6. Slide 6: Aceh Gas Markets

    Slide 6: Aceh Gas Markets

    Aceh Gas Markets DRAFT • ExxonMobil LNG contracts (until 2014) from Arun LNG facility • Strong SE Asia LNG demand • Strong domestic gas demand ⁻ 3 fertiliser plants ⁻ Local energy (power generation and industrial use) 6

  7. Slide 7: Pase Location

    Slide 7: Pase Location

    Pase Location Pase working area is 922km² located adjacent to Block B operated by ExxonMobil containing the very large Arun gas field ~ 20Tcf 7

  8. Slide 8: Pase Existing Seismic Coverage

    Slide 8: Pase Existing Seismic Coverage

    Pase Existing Seismic Coverage DRAFT Extensive 2D and 3D seismic data over Pase acquired by Mobil in 1990s Pase Pase 8

  9. Slide 9: Pase Field – Reserves Estimates

    Slide 9: Pase Field – Reserves Estimates

    Pase Field – Reserves Estimates • In January 1989, DeGolyer & McNaughton produced a certified reserves report (pre production and major seismic data acquisition): − Proved Reserves: 56.15 Bcf − Probable Reserves: 89.29 Bcf • In 2003, a 3D geomodelling study conducted by ExxonMobil suggested an estim

  10. Slide 10: Pase Rejuvenation

    Slide 10: Pase Rejuvenation

    Pase Rejuvenation Fast track rejuvenation of Pase gas field carried out by experienced Triangle team 10

  11. Slide 11: Corporate Overview: Experienced Board and Management Team

    Slide 11: Corporate Overview: Experienced Board and Management Team

    Corporate IndonesianOverview Corporate Overview Management Structure Experienced Management Team Experienced Board Of Directors John Towner Executive Chairman + 40 years O&G experience (Sydney Gas, Anzon Energy, Sunshine Gas, New Guinea Energy) Duncan Nuttall Robert Lemmey Chief Executive Officer Co

  12. Slide 12: Pase Production Sharing Contract

    Slide 12: Pase Production Sharing Contract

    Pase Production Sharing Contract DRAFT • Initial Pase PSC expired Feb 2012 • Triangle Energy awarded 6 month operating extension followed by an additional term to allow time for a new PSC to be awarded under a new collaborative regime between the Indonesian Central government and the Acehnese govern

  13. Slide 13: Exploration Opportunities

    Slide 13: Exploration Opportunities

    Exploration Opportunities DRAFT • Significant exploration upside • ExxonMobil only interested in very significant gas culminations greater than 1Tcf • Triangle Energy assembled a very experienced subsurface team for the: ⁻ Development of leads database ⁻ Selection of in-fill drilling locations ⁻ Rep

  14. Slide 14: Pase Field Infill & Opportunities

    Slide 14: Pase Field Infill & Opportunities

    Pase Field Infill & Opportunities DRAFT Opportunity 1: BP-2 Sidetrack-1 BP-2 3 potential undrained gas opportunities A-9 A-8 ST3 already identified by preliminary technical Opportunity 2: A-10 studies. A-6 Opportunity 3: A-1 Sidetrack-1 A-5 A-1 14

  15. Slide 15: Great White (SLS-D) Opportunity

    Slide 15: Great White (SLS-D) Opportunity

    Great White (SLS-D) Opportunity DRAFT  A carbonate buildup lead has been identified in the Pase portion of the SLS-D area  As of January 2011, ExxonMobil produced 430 BCF from SLS-D Great  Preliminary 2D ExxonMobil seismic re- White processing suggests the SLS-D carbonate reservoir extends into t

  16. Slide 16: Pase Work Programme & Budget

    Slide 16: Pase Work Programme & Budget

    Pase Work Programme & Budget DRAFT DRAFT BPMIGAS approved Work Program & Budget for 2013: A$M Drill and complete new Pase infill well A10 13.20 Geological and geophysical studies 0.30 Exploration administration 1.60 Production operation 2.70 General administration 2.00 Total Work Program & Budget 19

  17. Slide 17: Local Employer of Choice

    Slide 17: Local Employer of Choice

    Local Employer of Choice DRAFT DRAFT Triangle Pase Inc - HSSE Performance 2012 • >40 Acehnese Triangle’s Journey to employees & Zero Accidents 0/0 0/0 Occupational Fatality / Non Occupational Fatality contractors Lost Time Incidents / Non Occupational LTI 0/0 0/0 0 /0 Recordable Motor Vehicle Accide

  18. Slide 18: Corporate Social Responsibility (CSR)

    Slide 18: Corporate Social Responsibility (CSR)

    Corporate Social Responsibility DRAFT DRAFT (CSR) Triangle’s Acehnese Community Development Program focuses on local health, education and economic development. Triangle has carried out: • Maintenance on roads, bridges and local infrastructure • Provided medical supplies for local clinics and • Cont

  19. Slide 19: Contact Information

    Slide 19: Contact Information

    Contact Information DRAFT DRAFT John Towner, Executive Chairman T +61 8 9286 8300 johntowner@triangleenergy.com.au Canaccord Genuity Asia (Hong Kong) Ltd Cornerstone Corporate Pty Ltd -Perth Peter O’Malley Robert Towner T +852 2110 3406 T +61 8 9286 2828 Peter.omalley@canaccord.com rtowner@cornersto

Source: Internet Archive copy of triangleenergy.com.au