Polymetals Resources Ltd. · ASX:POL

Polymetals Resources — Noosa Mining Conference 2023

17 slides from Polymetals Resources's conference presentation, Nov 14, 2023

  1. Slide 1: Endeavor Mine Silver-Zinc-Lead

    ENDEAVOR MINE SILVER-ZINC-LEAD Noosa Mining Conference November 2023 ASX: POL

  2. Slide 2: Disclaimer

    DISCLAIMER This investor presentation has been prepared by Polymetals Resources Limited FINANCIAL INFORMATION DISCLAIMER (“Polymetals” or the “Company”). By attending an investor presentation or All financial information set out in this presentation is expressed in briefing, or accepting, accessing

  3. Slide 3: Endeavor – Silver Zinc Lead Mine

    ENDEAVOR – SILVER ZINC LEAD MINE • Polymetals cornerstone asset • Largest known ore body within Cobar Basin (pre-development +10.5Moz Au equivalent) • 32.0Mt mined over 38-years containing 91.8Moz Silver, 2.6Mt Zinc and 1.6Mt Lead • 16.3Mt remaining underground JORC resources1 @ 8.0% Zn, 4.5% Pb and

  4. Slide 4: Endeavor – History & Production Profile

    ENDEAVOR – HISTORY & PRODUCTION PROFILE Pb/Zn tonnes 1974 Electrolytic Zinc discovery of Elura (now Endeavor) 160,000 100% Silver Streaming Royalty 1976 Maiden Resource 27Mt @ 8.3% Zn, 5.6% Pb, 140 g/t Ag 140,000 1982 Production commenced by owner Pasminco 120,000 Chairman David Sproule retreated Le

  5. Slide 5: Endeavor – Established Infrastructure

    5 ENDEAVOR – ESTABLISHED INFRASTRUCTURE (Current value $150M) Location 40km North-West of Cobar, central NSW Tenements 5 Mining Leases (30km2), 3 Exploration Licences (1,100km2) Mineral 45.4Moz Silver, 1.4Mt Zinc, 0.82Mt Lead in 21.5Mt of Resources resources Ore Reserve 14.1Moz Silver, 224.6kt Zinc,

  6. Slide 6: Polymetals – Investment Summary

    POLYMETALS – INVESTMENT SUMMARY Endeavor Mine is in a pro-mining jurisdiction Mine is Fully Permitted & Operationally ready with all Infrastructure in place Stage 1: 10-Years, $323M free cashflow & 91% IRR3 Producing Silver, Zinc & Lead Concentrates H2 2024 Project Expansion via Exploration & hydrom

  7. Slide 7: Three Stage Value Creation Strategy

    THREE STAGE VALUE CREATION STRATEGY Polymetals plans to be a significant silver, zinc & lead producer, unlocking critical metals in New South Wales, Australia. 1 2 3 Mine Restart Extend Project Life Organic Growth Establish a cashflow business Optimise existing mine plan Downstream processing and pr

  8. Slide 8: Strategy Execution - Building a Long-Term Business

    STRATEGY EXECUTION - BUILDING A LONG-TERM BUSINESS ✓ STAGE 1: MINE RESTART • Cashflow generated from low-risk Ore Reserves • Funding: US$10M pre-payment facility in place • Project financing facility A$50M well advanced • Cashflow to fund exploration & growth ✓ STAGE 2: EXTEND PROJECT LIFE • Extend

  9. Slide 9: Stage 1 Mine Restart: 10-Year Life

    STAGE 1 MINE RESTART: 10-YEAR LIFE Project Highlight Study Outcome1 Study verses Spot Comparison Life of Mine Revenue A$1,412 million Spot Price Study vs Variable Restart Study (10/11/2023) Spot Life of Mine OPEX A$934 million Zinc US$2,750/t US$2,560/t + 7.4% Life of Mine EBITDA A$400 million Silve

  10. Slide 10: Stage 2 Extend Project Life: In-Mine

    STAGE 2 EXTEND PROJECT LIFE: IN-MINE • North-Western Lodes Extension • Drill intercepts indicate potential mineralisation • Drilling required to define potential resources • Deep Zinc Lodes (DZL) discovered in 2016 • Current Ore Reserve 1.73Mt @ 8.7% Zinc, 46.4 g/t Silver & 0.8% Lead NW • DZL open a

  11. Slide 11: Stage 2 Extend Project Life: Near-Mine

    11 STAGE 2 EXTEND PROJECT LIFE : NEAR-MINE Poon Boon • 5 Targets: • Panda • Garman • Poon Boon • Southern Extension Endeavor • Bengaccah Garman • Panda identified from Sandfire drill hole 20CES001 which Panda intersected 6m @ 3.61% Pb, 31.4 g/t Ag from 90m downhole Bengaccah Southern Extension • Rec

  12. Slide 12: Stage 3 Organic Growth: Discovery

    12 STAGE 3 ORGANIC GROWTH: DISCOVERY • 1,100km2 Exploration Licences extending over 80km strike of the northern Cobar Basin • Exploration activities focused on delivering new economic deposits • Metal endowment of the Cobar Basin increases towards the north: (Mineral Deposits – Pre-mining)5 • Endeav

  13. Slide 13: On Track for Cashflow

    ON TRACK FOR CASHFLOW In-Mine Extension Drilling (H1 2024) Start Mine Advancing Refurbishment Regional Finalise Rehabilitation Works Exploration Bond Arrangements (H2 2024) Commissioning & metal production Advance Near-Mine Close Exploration Redevelopment Finance 13

  14. Slide 14: Capability to Deliver

    CAPABILITY TO DELIVER Established infrastructure and long operational history lowers restart risk Restart Plan conservatively costed and financially robust Long history with asset and operating within the Cobar Basin Key positions identified; strong employment interest, local community & state suppo

  15. Slide 15: ASX: POL

    ASX: POL Investor Enquiries: Linden Sproule linden.sproule@polymetals.com www.Polymetals.com

  16. Slide 16: Endeavor – JORC (2012) Mineral Resources

    Appendix 1 ENDEAVOR – JORC (2012) MINERAL RESOURCES Underground JORC (2012) Mineral Resource1 JORC Category Mt Zinc % Lead % Silver g/t Zinc Mt Lead Mt Silver Moz Measured 4.4 8.3% 5.1% 93 0.37 0.22 13.2 Indicated 8.8 7.9% 4.6% 82 0.70 0.40 23.2 Inferred 3.1 7.7% 3.7% 78 0.24 0.11 7.8 Total 16.3 8.0

  17. Slide 17: Endeavor – JORC (2012) Ore Reserves

    Appendix 2 ENDEAVOR – JORC (2012) ORE RESERVES Mine Restart Study JORC (2012) Ore Reserves1 Category Source Mt Zinc (%) Lead (%) Silver (g/t) Proved Underground 0.49 6.11 3.90 132 Underground 1.7 7.17 1.64 60 Probable Sector 1 Tailings 3.4 2.14 1.56 80 Total Proved and Probable 5.6 4.04 1.79 78 Rese

Polymetals Resources — Noosa Mining Conference 2023 on 6ix