St. Barbara Ltd. · ASX:SBM

St. Barbara — St Barbara Mines — Investors Day Gold Conference 2003

19 slides from St. Barbara's conference presentation, April 2003

  1. Slide 1: Defiance Mining Corporation

    DEFIANCE MINING CORPORATION

  2. Slide 2: St Barbara Mines Limited – the way forward

    St Barbara Mines Limited “ the way forward ” Stephen Miller Executive Chairman April 2003

  3. Slide 3: Defiance Transaction Status

    Defiance Transaction Status 49.9% 50.1% Stage 1 (June 2003) DEFIANCE MINING CORPORATION ST BARBARA MINES LIMITED Stage 2 (post July 2003) DEFIANCE MINING CORPORATION

  4. Slide 4: The Board and Management

    The Board and Management Board Chairman John Hick (Geomaque CEO & President) President & CEO Stephen Miller (St Barbara Exec. Chairman) Non-executives Cliff Davis (former President, Gabriel Resources) Hank Tuten (Managing Partner, RCF) Gordon Bogden (Managing Director, Beacon) Dick Tastula (former M

  5. Slide 5: The Assets

    The Assets Growth assets · Tasiast (Midas) · Paulsens (St Barbara) Operating assets · Meekatharra (St Barbara) · Vueltas (Geomaque) Vueltas Paulsens Gold Inventory Tasiast · Reserves 525,000 ounces Meekatharra · Resources 4.8 million ounces Exploration · Granted title to 20,000 sq kms

  6. Slide 6: Meekatharra Gold Operations

    Meekatharra Gold Operations 600 000 mE 650 000 mE man Chesterfield JV Tenement Strategy Ne w Farmout Paddys Flat Acquisition · Acquired Paddys Flat (100%) Ga sc oy – 15 km from plant ne Ju nc ti on goo rlie – $4.5m plus royalty Wiluna & Kal Meekatharra Bluebird Airport – inventory 938,000 ounces 705

  7. Slide 7: Meekatharra Exploration

    Meekatharra Exploration 630 000 E 650 000 E Exclusion Gibraltar Revitalised Exploration Program Exclusion Bluebird CIP Plant · 800 holes (62,000m) to test Aircore Bluebird / South Junction Great Northern Highway Target Area targets under shallow sediments 7 040 000 N · Bluebush – Mingah elevated to

  8. Slide 8: Paddys Flat – Vivians and Consols

    Paddys Flat – Vivians and Consols Fenians Consols Vivians Ingliston Central Historical Production of Pit Production of Pit Production of Pit Production of 1.155,000t @ 16.8g/t 277,961t @ 2.02g/t 63,113t @ 1.72g/t 280,680t @ 1.31g/t Historic Production of 2,700t @ 69.9g/t Historic Production of 17,60

  9. Slide 9: Paulsens

    Paulsens · Feasibility completed October 2002 · Design concept a large pit (800 x 500 m to depth of 195 m) followed by underground mine · Production schedule – first 5 years – 3.3 million tonnes at 4.2 g/t recovering 430,000 ounces – peaks year 3 at 137,000 ounces at US $170 per ounce – life-of-mine

  10. Slide 10: Paulsens – upside potential

    Paulsens — upside potential T T T T T T 9300mE 9500mE 9700mE 9900mE 10100mE 10300mE Resource - Reserve Upgrade Drilling 100,0000z resource targeting 200,0000z Resource Upgrade Drilling 200,0000z target = Upper Zone “XV Lower Zone

  11. Slide 11: Paulsens – Ashburton regional picture

    Paulsens – Ashburton regional picture 116º00' 117º00' LEGEND Granites Geological boundary Bangemall Basin Fault Paulsens Upper Wyloo Group Fold axis Lower Wyloo Group Gold deposit / mine Hamersley Basin Gold prospect Belvedere Fortescue Group Tenement boundary Wyloo Dome Miningee Bore Rocklea Dome E

  12. Slide 12: Tasiast (Mauritania) – a new asset

    Tasiast (Mauritania) – a new asset · Newmont (Australia) divestment · Acquisition price US $6.5 million (US $2.0 million now, US $4.5 million in installments from decision to mine) · Resource 29.3 million tonnes grading 1.9 g/t for contained 1.79 million oz. (34% in indicated category) · Mineralised

  13. Slide 13: Tasiast – asset base

    Tasiast – asset base · Large underexplored landholding – 12 exploration licences cover Tasiast 1.8 Moz 16,000km2 of prospective greenstone · 3 Project Areas – Tasiast - ready for BFS – Ahmeyim-Tijirit - (drilling targets identified) Sadiola 9.8 Moz Bamoko – Karet (grass roots) Siguiri 2.7 Moz Morila

  14. Slide 14: Tasiast Gold Project – Colonne Piment Zone

    Tasiast Gold Project – Colonne Piment Zone Aeromagnetics North

  15. Slide 15: Colonne Piment

    Colonne Piment Central High Grade Zone · High grade intersections 30.0m @ 12.2g/t · Consistent 20m to 25m wide ore zones 43.5m @ 22.1g/t · Steeply dipping 64.5m @ 5.5g/t 24.0m @ 4.5g/t · Exposed at surface: 40m 22.5m @ 1.9g/t 2.8m @ 5.6g/t oxide zone 37.5m @ 1.9g/t 6.0m @ 1.9g/t · Primary zone drill

  16. Slide 16: Tasiast Project

    Tasiast Project Favourable parameters: · Higher grade and lower strip ratio in first year First 5 years Year 1* average Grade (g/t) 3.65 2.98 Strip ratio 1.43 2.49 Production (ounces) 158,000 120,000 Cash Cost (US$/oz) 140 171 * conceptual study · 3 year tax holiday · Corporate tax rate of 25% · IRR

  17. Slide 17: Vueltas (Honduras)

    Vueltas (Honduras) · Operating mine since June 2001 – low strip ratio open-cut heap leach – 2002 production 30,785 ounces · Current plan recovers 80,000 ounces at $211 per ounce through to 2004 · Exploration upside – 400,000 ounces in indicated category outside mine plan – Zapotal, 2 km SW, high gra

  18. Slide 18: Potential Annual Production

    Potential Annual Production Average Annual Mine Production (000s oz) Meekatharra 100 (incl. Paddys Flat) Vueltas 40 Tasiast 120 Paulsens 90 350

  19. Slide 19: Defiance Mining Corporation

    DEFIANCE MINING CORPORATION