Eco-Stim Energy Solutions — Corporate Update (January 2016)
16 slides from Eco-Stim Energy Solutions's corporate update, Jan 20, 2016

Slide 1: Operational Update January 2016
ea¥stm ENERGY SOLUTIONS Operational Update January 2016 Paget

Slide 2: Forward-looking statements
This presentation contains statements about future events and expectations that can be characterized as forward-looking statements, including, in particular, statements about the Company's plans, strategies and prospects. The use of the words “anticipate,” “estimate,” “expect,” “may,” “project,” “be

Slide 3: Election Results
Election Results = October 22, 2015 election results were unexpected and forced a run- off election in November. = Status quo candidate (Scioli) was expected to win = Status quo candidate had campaigned on maintaining oil and gas pricing subsidies = The Change candidate (Macri) campaigned on a free

Slide 4: Uncertainty Created by Election Process
ty Created by Election Process > Will oil prices remain at $77/BBL? > If oil prices are adjusted, how far downward > Will YPF CEO (Gullucio) remain in that position? If not, who stays and who goes within YPF? > What will the YPF capital expenditure and operating budget look like in 2016 under a new

Slide 5: Policy Changes Already Implemented
licy Changes Already Implemented > Appointment of perceived energy expert (former Shell executive) to the Minister of Energy position » Reduced oil price from $77 to $67.50 for light sweet crude > Devalued currency by 40% and removal of currency controls > Removed taxes on agricultural exports thus

Slide 6: Argentina Seeks to End Dispute
ina Seeks to End Dispu “"We are ready to bring the matter to a close and negotiate a solution, | hope we can rapidly leave this issue behind because it limits our ability to grow.“ — Mauricio Macrl (January 12, 2016) < Mr. Macri is also scheduled to attend the World Economic Forum in Davos in late J

Slide 7: Review of Past Business and New Contract Opportunities
Review of Past Business and New C act Opportuniti > Contracts in place with Medanito and Oil Stone but low activity due to capital constraints » Most 2015 YPF work executed on protocol basis — no contract > Much of the work with YPF in two areas where customers prefer our service capability — willin

Slide 8: New Customer Opportunities Currently Being Discussed
New Customer Opportunities Currently Being Discussed to Deploy New Capacity Timing of start | Type of Work _| Volume of Work YPF — new districts Q2 - 2016 Well Stim & CT High Madalena Resources Q2 - 2016 Well Stim Medium Medanito Q1 - 2016 Well Stim & CT Low Techpetrol Q2 - 2016 Well Stim & CT Mediu

Slide 9: Argentina Shale Developments
2 rgentina Shale Developments > Audrey McClendon’s American Energy Partners signed an agreement with YPF for $500M over next 3 years — Financial Times > Petronas to drill 900 wells in Argentina; 35 horizontal wells in 2016 - Upstream > Dow Chemical to participate in 130 wells in Argentina; 30 horizo

Slide 10: Equipment Deliveries, Timing
uipment Deliveries, Timin Description Number Expected of Units | Di ry Date 2500 HHP Frac Pumps 3 Delivered QM Equipment 2500 HHP Frac Pumps 2 Q1 2016 QM Equipment 48ft Data Van & Laboratory il Q1 2016 S&S Hydration Unit w/ dry add unit 1 Q1 2016 S&S High Capacity Blender il Q1 2016 S&S High Pressur

Slide 11: Advantages of Turbine Powered Pumping Units
Advantages of Turbine Powered Pumping Units = Only pumping unit in the world capable of: — running on 100% natural gas — running on multiple fuel sources including natural gas, CNG, LNG and Diesel — delivering emissions 65% below EPA Tier 4 requirements — delivering 4500 HHP from a single trailer —

Slide 12: Upgrades and Modifications Made To Address Certain Inefficiencies
Upgrades and Modifications Made To Address Certain Inefficiencies Observed During Previous Operations Restricted air flow to turbine engines Improper seals on transfer gear boxes causing higher maintenance cost Previous system control software prevented pressure testing and graduated control changes

Slide 13: Baker Hughes Rig Count For Argentina Through December
Baker Hughes Rig Count For Argentina Through December Shows Decline In Activity In Late 2015 120 110 100 90 80 ARGENTINA RIG COUNT 14-Mar 14-Jun 14-Sep 14-Dec 15-Mar 15-Jun 15-Sep 15-Dec

Slide 14: Uncertainty Around Oil Price Caused A Slow Down In Q4
Uncertainty Around Oil Price Caused A Slow Down In Q4 As Illustrated In This article Dated December 4, 2015 Ellnversor Online.com iPr dja en stand by un 10% de sus equipos torre en el marco de un plan vacacional cat ser qt cpt tie fe ran a jan eri ta sc st io, Ups ep aes tv pa ow ‘so en oes clea iri

Slide 15: Labor Unions Upset With Idled Rigs
Labor Unions Upset With Idled Rigs. This Started In Novembe In Some Regions But Activity Set To Resume Mid-January Ellnversor son | Avila: "The 46 teams unemployed have to return to activity on January 10" Onlinecom were By Editorial Team | The Online Investor hi lamashamarcha ‘The massive strike th

Slide 16: 2016 Outlook And Preliminary Q4 2015 Results
2016 Outlook And Preliminary Q4 2015 Results > Given uncertainty & visibility limitations we believe it is impractical at this time to provide forward guidance for 2016 with a high degree of confidence > Q4 activity levels were about half of normal levels for ESES and its competitors > We expect Q1
Source: SEC EDGAR · 8-K filed Jan 20, 2016
More decks from Eco-Stim Energy Solutions Inc
The Oil & Gas Conference 201816 slides · Aug 21, 2018
Louisiana Energy Conference 20188 slides · May 29, 2018
IPAA OGIS New York April 201814 slides · Apr 9, 2018
Howard Weil New Orleans 201814 slides · Mar 23, 2018
EnerCom Dallas 201822 slides · Feb 21, 2018
CSFB Energy Conference 201819 slides · Feb 12, 2018