TransGlobe Energy Corporation

TransGlobe Energy — Merger or Acquisition (March 2014)

32 slides from TransGlobe Energy's merger presentation, Mar 15, 2014

  1. Slide 1: Combination of Caracal Energy Inc. and TransGlobe Energy Corporation

    COMBINATION OF CARACAL ENERGY INC. AND TRANSGLOBE ENERGY CORPORATION CREATING ONE OF THE LARGEST INDEPENDENT AFRICA FOCUSED OIL PRODUCERS MARCH 15, 2014 .COM

  2. Slide 2: Disclaimer

    DISCLAIMER You must read the following before continuing. The following applies to this document, the presentation of the information in this document, and any question‐and‐answer session that may follow (collectively, the “Presentation”). In viewing the Presentation, you agree to be bound by the fo

  3. Slide 3: Disclaimer (continued)

    DISCLAIMER (CONTINUED) In respect of the forward‐looking statements and information concerning the anticipated benefits and completion of the proposed Arrangement, the anticipated timing for completion of the Arrangement and the listing of Caracal's shares on the TSX, Caracal and TransGlobe have pro

  4. Slide 4: Transaction Highlights

    TRANSACTION HIGHLIGHTS  Creating One of the Largest Independent Africa Focused Oil Producers  Platform for Continued Reserves and Production Growth  Catalyst Rich Exploration and Development Program  Improved Profile Relative to Africa Focused E&P Peers  Experienced Board and Proven Management

  5. Slide 5: Creating One of the Largest Independent Africa Focused Oil Producers

    CREATING ONE OF THE LARGEST INDEPENDENT AFRICA FOCUSED OIL PRODUCERS  Concentrated and majority operated, onshore oil production growth in Africa  High impact portfolio of exploration, development, and 3 B C 1 producing assets A2 2P(1)(2) RPR(1)(2) Chad Egypt 135 447 MMbbl MMbbl Yemen 8 7 G H 6 D

  6. Slide 6: Proven Track Record of Reserve and Production Growth

    PROVEN TRACK RECORD OF RESERVE AND PRODUCTION GROWTH Caracal Reserves Growth (MMbbl)(1) Caracal Production Growth (Mbbl/d)(2) Drivers of Near Term Reserves & Production Growth 100.0 89.8 25.0  Current production from Badila 80.0 20.0  Mangara on stream target H2 2014 60.0 15.0  Two further fields

  7. Slide 7: Catalyst Rich Exploration and Development Program

    CATALYST RICH EXPLORATION AND DEVELOPMENT PROGRAM Chad Egypt: Eastern Desert Beche 2014 drill locations Beche B East Arta Existing Oil fields Beche C Kibea Field Extensions Sourma Ouham I Future upside expl. / dev. Baouda E W Gharib + NW Gharib Damalla E W Bakr Beongo Arta Krim (1) Bangono Summary o

  8. Slide 8: Strong Pro Forma Positioning

    STRONG PRO FORMA POSITIONING C o m b i n e d c o m p a ny to b e c o m e o n e o f t h e l a rge st i n d e p e n d e nt A f r i c a fo c u s e d o i l p ro d u c e rs Pro Forma Highlights Select Africa Focused Listed Peers – 2014E (mboe/d)(1)  Majority operated positions in concentrated asset base

  9. Slide 9: Improved Market Profile

    IMPROVED MARKET PROFILE I m p ro ve d p ro f i l e re l at i ve to A f r i c a fo c u s e d E & P Pe e rs 2014E Production Guidance vs. P/Core NAV 2014E EBITDA vs. P/Core NAV 80 60 1,500 1,000 Production – 2014E Management Guidance (Mboe/d) EBITDA – 2014E Bloomberg Consensus (US$mm) 50 800 40 / 600

  10. Slide 10: Experienced Board and Proven Management

    EXPERIENCED BOARD AND PROVEN MANAGEMENT BOARD OF DIRECTORS EXECUTIVE TEAM LED BY GARY GUIDRY Robert Hodgins • Joined Board in July 2011 • Qualified Chartered Accountant Gary Guidry Chairman • Previously CFO of Pengrowth Energy Trust, VP / Treasurer (30+ Years Experience) of Canadian Pacific, and CFO

  11. Slide 11: Overview of Transaction Mechanics

    OVERVIEW OF TRANSACTION MECHANICS  TransGlobe shareholders will receive 1.23 new common shares of Caracal for each TransGlobe common share  65.6% : 34.4%(1) ownership for current Caracal / TransGlobe shareholders in the combined entity  London (LSE Main  Toronto (TSX) and New  After completion

  12. Slide 12: Expected Transaction Time Table

    EXPECTED TRANSACTION TIME TABLE  Transaction Announcement 15 March 2014  Distribution of Caracal and TransGlobe Shareholder Circulars Late May 2014  Notice of TransGlobe Intention to Appear at Application for Final Order of Court Early June 2014  TransGlobe Shareholder Meeting Mid June 2014  Ca

  13. Slide 13: One of the Largest Independent Africa Focused Oil Producers

    ONE OF THE LARGEST INDEPENDENT AFRICA FOCUSED OIL PRODUCERS  M ate r i a l O n s h o re O i l P ro d u c t i o n  Combined current oil production of 25.1 Mbbl/d (1) and 2P reserve base of 135 MMbbl (1)(2)  N e a r Te r m P ro d u c t i o n G ro w t h  Average 2014E production target of 31.0 – 34

  14. Slide 14: Appendix A: Caracal Energy Asset Overview

    APPENDIX A: CARACAL ENERGY ASSET OVERVIEW M a rch 2 0 1 4

  15. Slide 15: Production: Badila Field Overview

    PRODUCTION: B A D I L A F I E L D O V E RV I E W First production achieved in September 2013; core value anchored by reserves and production • Reserves increase in 2012 after re‐entry and testing of Badila Wells Wells Location previously untested Badila‐1 Badila Location • 3D Seismic acquired (320 k

  16. Slide 16: Near Term Development: Mangara Field Overview

    NEAR TERM DEVELOPMENT: M A N G A R A F I E L D O V E RV I E W Advancing towards first oil during 2014 Mangara Mangara WellsLocation Wells Location • In line with the McDaniel reserves evaluations with effective date December 31, 2013, Caracal expects to drill up to 72 development wells (50 producers

  17. Slide 17: Exploration-Focused Growth Strategy

    E X P LO R AT I O N ‐ F O C U S E D G R O W T H S T R AT E G Y Testing 1 billion barrels of mean unrisked prospective resources with 8‐10 prospects in 2014 Breakdown of Prospective Resources for the Top 42 Prospects by Area 16

  18. Slide 18: DOI / DOB Blocks

    D O I / D O B B LO C K S Infrastructure in place, high reward prospects nearby DOI/DOB Overview • 2,865 Km2 (~708,000 acres) Prospect Mean Mbbl Effective Risk (%) • Development anchored by Badila and Mangara fields EXPLORATION PROSPECTS • 3D seismic covers both fields and offsetting prospects Krim 2

  19. Slide 19: DOH Block

    D O H B LO C K Offsetting existing production at Kome DOH Overview • 824 Km2 (~203,600 acres) Prospect Mean Mbbl Effective Risk (%) • Tectonically similar history to Kome field in the Doba basin Damalla East 89,579 25.6 on the NW side of the Borogop uplift Beongo 27,226 31.9 • Potential targets in b

  20. Slide 20: Borogop

    BOROGOP Highly structured area with limited data Borogop Overview Mean Effective Risk • 8,992 Km2 (~2,222,000 acres) Prospect Mbbl (%) • Acquiring 2D seismic to delineate offsetting leads in highly Bepara 74,174 23.6 structured area between rift basin margin and Borogop uplift Mainon 88,877 11.1 • S

  21. Slide 21: Doseo West-Chari

    D O S EO W E S T ‐ C H A R I Multiple follow‐up prospects Doseo West‐Chari Overview Mean Effective • 5,343 Km2 (~1,320,300 acres) Prospect Mbbl Risk (%) • Northern prospects on trend with Maku and Tega Discoveries Bangono 51,614 17.9 • High density of follow‐up prospects upon exploration success Ouh

  22. Slide 22: Doseo East-Chari

    D O S EO E A S T ‐ C H A R I Existing discoveries prove charge in the trend Doseo East‐Chari Overview • 3,707 Km2 (~916,000 acres) Mean Effective Prospect Mbbl Risk (%) • Maku and Tega Discoveries on northern rift margin prove source, Tega A 71,105 16.8 migration and trap Tega B 130,310 26.7 • Prosp

  23. Slide 23: Doseo East-Doseo

    D O S EO E A S T ‐ D O S EO Exploration to open up the basin Doseo East‐Doseo Overview • 3,049 Km2 (~753,400 acres) Mean Effective Prospect Mbbl Risk (%) • Sako North oil discovery to the north of Tangaray prospect Tangaray A(1) 128 33 • Well drilled on southern margin of rift basin indicated good s

  24. Slide 24: Doseo Salamat

    D O S EO S A L A M AT Far East anchor to open up the basin Doseo Salamat Overview 1323 Sqkm • 1,323 Km2 (~327,000 acres) Effective Prospect Mean Mbbl Risk (%) • Commercial threshold at Kibea Discovery anchors development Kibea 40,071(1) 34.3 and exploration Kibea North 51,185 24.3 • Acquiring 3D sei

  25. Slide 25: Appendix B: TransGlobe Energy Asset Overview

    APPENDIX B: TRANSGLOBE ENERGY ASSET OVERVIEW M a rch 2 0 1 4

  26. Slide 26: Production: West Gharib (100%)

    Western Desert PRODUCTION: WEST GHARIB (100%) Egypt Eastern Desert Eastern Desert Description  Eight development leases, increased production by over 400% since acquisition in 2007 (development drilling, improved water flooding and exploration discoveries) Year Acquired  Sep ‘07 – 75%  Aug ‘08 –

  27. Slide 27: Production: West Bakr (100%)

    Western Desert PRODUCTION: WEST BAKR (100%) Egypt Eastern Desert Eastern Desert Description  Three fields: H, K and M Year Acquired  2011 Expiration  2020 Development Extension  + 5 years (at option of contractor) Gross Acreage (acres)  11,600 Production (February Av.)  5,600bbl/d First produc

  28. Slide 28: Development: East Ghazalat (50%)

    Western Desert DEVELOPMENT: EAST GHAZALAT (50%) Egypt Eastern Desert Western Desert Description  Safwa development lease approved in July 2011 Year Acquired  July 2010 North Dabaa Safwa Development Field Expiration  Safwa lease expiring in 2031 Lease Development Extension  20 years Gross Acreage

  29. Slide 29: Exploration: Eastern Desert

    Western Desert EXPLORATION: EASTERN DESERT Egypt Eastern Desert NW Gharib SW Gharib SE Gharib Eastern Desert (100%) (100%) (100%) Description Exploration acreage nearby West Gharib and West Bakr Year Acquired November 2013 (initially awarded in 2011 EGPC bid round) NW Gharib Expiration 2020 2020 202

  30. Slide 30: Exploration: Western Desert

    Western Desert EXPLORATION: WESTERN DESERT Egypt Eastern Desert South Alamein (100%) South Ghazalat (100%) Boraq 3D seismic program Description  Exploration acreage being progressed to Description  Exploration block, nearby North Dabaa drill‐ready prospects Year Acquired  2013 (signature bonus of

  31. Slide 31: Yemen (Non-operated)

    YEMEN (Non‐operated) Producing B ‐ S ‐ 1 (25%) B ‐ 32 (13.8%) Year acquired 1998 1997 Expiration 2023 2020 Extension (Develop.) + 5 years + 5 years Gross Acreage (acres) 284,700 146,070 First Production March 2004 November 2000 Production (February Av.) 1,109bbl/d 43bbl/d Status Export pipeline 3 we

  32. Slide 32: Contact information

    Contact information C ARACAL +1 (403) 724‐7200 S UITE 2100, 555 ‐ 4 TH A VE SW C ALGARY , AB. T2P 3E7 C ANADA WWW . CARACALENERGY . COM T RANSGLOBE +1 (403) 444‐4787 SUITE 2300, 250 ‐ 5 TH S T SW C ALGARY , AB. T2P 0R4 C ANADA WWW . TRANS ‐ GLOBE . COM

TransGlobe Energy — Merger or Acquisition (March 2014) on 6ix