Patagonia Gold Corp · TSXV:PGDC

Patagonia Gold — Shareholder Meeting (June 2012)

25 slides from Patagonia Gold's shareholder meeting presentation, Jun 6, 2012

  1. Slide 1: Investor Presentation AGM June 6, 2012

    INVESTOR PRESENTATION AGM June 6, 2012 TSX:PAT AIM:PGD

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements The content of this presentation has been prepared for the purpose of providing general information about, and an overview of, Patagonia Gold Plc (the “Company") and its operations. It is not meant to be a complete review of all matters concerning the Company. Whilst the C

  3. Slide 3: Investment Highlights

    Investment Highlights Strong Portfolio of Advanced Exploration Stage Projects Mining‐Friendly Santa Cruz Province & Strategic Partnership with Fomicruz, the Provincially Owned Mining Company Geological Prospectivity & Significant Land Holdings in the Deseado Massif Experienced Team with Extensive Re

  4. Slide 4: Patagonia Gold Plc

    Patagonia Gold Plc Patagonia Gold Plc is an advanced stage mining exploration company that seeks to grow shareholder value through the acquisition, exploration and development of gold and silver projects in the Deseado Massif region of Argentina Targeting Production of +200,000 Oz. AuEq Per Annum By

  5. Slide 5: Santa Cruz Province

    Santa Cruz Province Mining friendly Santa Cruz province Mendoza La Pampa Track record in precious and base metal Buenos Aires Neuguen production Chile Rio Negro Fomicruz is the provincially owned mining company and a partner of Patagonia Gold on certain properties Chubut Argentina Major industry pla

  6. Slide 6: Footprint in Santa Cruz

    Footprint in Santa Cruz La Paloma Property Block Lomada de Leiva Fomicruz Properties El Tranquilo Property Block Cap‐Oeste La Manchuria COSE La Manchuria PGSA Properties Property Block Fomicruz Agreement Favourable geological prospects with land holdings along mineralized trends 350,000 ha land hold

  7. Slide 7: Santa Cruz Province: Established Mines & Advanced Projects

    Santa Cruz Province Established Mines & Advanced Projects Lomada Huevos Verdes de Leiva Cerro Negro El Bagual Don Nicolas La Josefina Cap‐Oeste Pinguino Cerro Puntudo COSE Cerro Moro La Manchuria Cerro Vanguardia Mina Marta Manantial PGSA Properties Sarita Espejo Fomicruz Agreement MineralisationTre

  8. Slide 8: Resources

    Resources 43‐101 Compliant (oz) – 4 Projects INDICATED GRADE (g/t) METAL (Oz) PROJECT Tonnes Au Ag AuEq Au Ag AuEq Cap‐Oeste 8,182,948 2.28 74.71 3.68 599,570 19,656,004 966,972 COSE 20,637 60.06 1,933.07 96.21 39,850 1,282,582 63,835 La Manchuria 425,705 2.95 135.00 4.07 40,317 1,848,211 55,684 Lom

  9. Slide 9: Growth Strategy

    Growth Strategy Advancing a Portfolio of Highly Prospective Assets in Santa Cruz 2012 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Flagship Project Cap-Oeste Pre feasibility study Full feasibility study Permitting, Construction Production Advancing Near Term Production COSE Construction of decline Mining

  10. Slide 10: Development Projects

    Development Projects PATAGONIA GOLD PLC TSX:PaT AIM:PGD

  11. Slide 11: Lomada de Leiva Project

    Lomada de Leiva Project IN PIT CRUSHING GOLD ROOM PAD EXPANSION UNDER IRRIGATION 11

  12. Slide 12: Lomada de Leiva Project

    Lomada de Leiva Project Q2 2011 65,000 tonne trial heap leach pad & processing facility performing satisfactorily Pad expansion to 135,000 tonnes completed in Q2 2012 Continuation to 200,000 tonnes to be completed in Q4 2012 Gold room scheduled for completion early Q3 2012 Resources (oz) Commencemen

  13. Slide 13: Lomada de Leiva Project: HL Project with all key ingredients in place

    Lomada de Leiva Project HL Project with ALL key ingredients in place Au Recovery excellent for this type of extraction process, 75% achievable, crushing greatly improves leach time Low cost filter material available on site High grade, low strip ratio, ALL oxidised Improved leach Kinetics reduce add

  14. Slide 14: COSE Project

    COSE Project 2 km SE of Cap‐Oeste COMPLETED 76 drill holes for 22,040 metres NI 43‐101 Resource Estimate 34,395 tonnes at 60.06 g/t gold and 1,933.07 g/t silver including inferred resources PLANNED 2012‐ development drive for underground drilling Resources (oz) (Mineralisation open in all directions

  15. Slide 15: COSE Project

    COSE Project Proposed Underground Access Decline Development NPV of US$ 93.8M @ gold US$ 1,418/oz @ silverUS$ 35.00/oz Time frames: Life of mine of 23 months 11 month construction 12 month production with 2 month Capex payback OPEX and CAPEX costs US$ 33M for life of mine using the direct shipping o

  16. Slide 16: COSE Project: Ore treatment and handling

    COSE Project ORE treatment and handling ORE Treatment Test work underway to “Scrub” ore, >95% metal contained in Altered Matrix Advantages, 75‐85% projected cost saving in shipping‐treatment costs Silica Breccia 11.84 g/t Au 76.81 g/t Ag, hard Higher payables from Smelter as with Matrix probably not

  17. Slide 17: Exploration and Resources

    Exploration and Resources 17

  18. Slide 18: Cap-Oeste Project

    Cap‐Oeste Project Our flagship project Tracks Bonanza fault Mapped over 6 km strike length of project 94,323 metre drilling completed to April 2012 (61,289 for existing resource 20,743 for new resource 12,291 since) Resources (oz) Mineralisation open in all directions Gold Silver AuEq INDICATED 599,

  19. Slide 19: Cap-Oeste Project Area

    Cap‐Oeste Project Area Advanced Projects & Other Prospects La Pampa Don Pancho Cap‐Oeste Cap‐Oeste Extension COSE Tango 19

  20. Slide 20: Cap-Oeste Project Area

    Cap‐Oeste Project Area Long‐section showing Au x metre 1.4Km Pampa 2km’s COSE 2km’s CO-335-D 28.30m @ 4.59 g/t AuEq Multiple Shoots repeating CO-317-D along strike Potential new 37.40m @ HG shoot, 387 23.88 g/t AuEq 20

  21. Slide 21: Cap-Oeste Project

    Cap‐Oeste Project Average Thickness 12.7m 25m @ 0.67 g/t Au; 10.2 g/t Ag SW NE 9.13m @ 2.87 g/t Au; 61 g/t Ag 450 m Incl 1.5m @ 12.54 g/t Au; 278.5 g/t Ag 7.3m @ 3.54 g/t Au; 31 g/t Ag Incl 2.5m @ 7.49 g/t Au; 38 g/t Ag 5m @ 9.1 g/t Au; 175.5 g/t Ag 350 m Incl 2.03m @ 13.99 g/t Au; 265 g/t Ag 10.1m

  22. Slide 22: Cap-Oeste: Met Testwork programme and process technology

    Cap‐Oeste Met Testwork programme and process technology • Both Oxide and Sulphide amenable to flotation • Au and Ag recoveries in Sulphide returned 88.3% and 95.5% respectively • Au and Ag recoveries in Oxide returned 98.8% and 97.5% respectively •G&T laboratories carrying out second phase flotation

  23. Slide 23: Cap-Oeste Structural Corridor

    Cap‐Oeste Structural Corridor 2410000mN 2400000mN 2390000mN El Tranquilo Exploration Block 4690000 mN Cap‐Oeste COSE 4680000 mN Monte Leon La Bajada Estancia 4670000 mN Marciana 23

  24. Slide 24: La Manchuria Project

    La Manchuria Project Exploration stage project 3 drill campaigns completed over past 3 years High‐grade gold‐silver mineralisation Open to North, South and depth Further drilling planned for late 2012 Resources (oz) Gold Silver AuEq INDICATED 40,317 1,848,211 55,684 INFERRED 72,335 2,335,236 90,682

  25. Slide 25: Other Exploration

    Other Exploration Deseado Massif – 60,000 sq km Second Pass in Progress to Identify Drill Targets El Bagual Sarita PGSA Properties Agreement with Fomicruz 53 additional exploration property blocks totalling 165,596 hectares Three exploration teams dedicated to advancing claims First pass reconnaissa

Patagonia Gold — Shareholder Meeting (June 2012) on 6ix