British Land Company PLC · LSE:BLND
British Land — Corporate Update (October 2022)
21 slides from British Land's corporate update, Oct 5, 2022
Slide 1: Canada Water Development Construction Liaison Forum
Canada Water Development Construction Liaison Forum Plot K1 (Roberts Close) and the surrounding area 5 October 2022
Slide 2: Overview of tonight's presentation
• Introductions and meeting code of conduct • Canada Water development • Construction management • Updates from contractors - Construction of Plot K1 (McAleer & Rushe) Overview of - Construction works in the surrounding area (Galldris) tonight’s - Q&A presentation
Slide 3: Our presenters
Our presenters SARAH WARD Construction Neighbour Liaison Manager TIAGO MARQUES DAVID WAKE Contractor, McAleer & Rushe Community liaison, Galldris Construction of Construction of substation at rear of Plot K1 Printworks and works in the surrounding area
Slide 4: Wider Canada Water development works
Wider Canada Water development works
Slide 5: Common working practices
Common working practices Standard construction working hours: Noise, dust and vibration monitoring and reporting • Monday – Friday: 8am - 6pm • In line with industry standards and the Construction Management Plans for each development site, environmental • Saturday: 8am - 2pm (no noisy works before
Slide 6: Plot K1
SSS -— o 2 a3 om S23 eee: ana oe
Slide 7: Plot K1 – site location
Key — Canada Water Development boundary @ First phase of the development Towards Canada Water station g
Slide 8: Plot K1 – site layout
Plot K1 – ROBERTS CLOSE site layout RUSSIA WALK 8
Slide 9: Plot K1 – vehicle movements
Plot K1 – vehicle movements Long wheel movements Short wheel movements
Slide 10: Plot K1 – Site updates
Plot K1 – Site updates • The concrete frame of the building is now visible from the outer boundaries of the site as it rises above the hoarding line • Works to the frame will continue into the Autumn before precast façade (exterior of the building) can be installed to the outer facing elevations in
Slide 11: Plot K1 – Site photos
Plot K1 — Site photos 8. ADDINGTONS ENT |
Slide 12: Plot K1 – Indicative timeline
Plot K1 – Indicative timeline
Slide 13: Zone L – site location
GALLDRIS CLAREMONT HOUSE % 0, > @) Towards Canada Water station A PRINTWORKS — Canada Water Development boundary e@ First phase of the development
Slide 14: Zone L - works at rear of Printworks by Quebec Way
Zone L - works at rear of Printworks by Quebec Way • Progress continues the new, below ground substation for UK Power Networks which supply power to the development as well as the local community • Basement slab works were completed in July, allowing the build to continue up towards mezzanine and gr
Slide 15: Site Layout
Site Layout
Slide 16: Enabling works for Printworks Street and Reel Street – site location
Enabling works for Printworks Street and Reel Street – site location Location of works Paper Yard Buildings B & C Zone L
Slide 17: Enabling works for Printworks Street and Reel Street
Enabling works for Printworks Street and Reel Street (as they are currently known) Work will begin this month on the construction of new access roads and the installation of new below ground infrastructure. This includes electricity, gas, water, telecoms, district heating (space proofing), surface w
Slide 18: Paper Yard (Buildings B and C) – site location
Paper Yard (Buildings B and C) – site location Enabling works for Printworks Street and Reel Street Location of works Zone L
Slide 19: Paper Yard (Buildings B and C)
Paper Yard (Buildings B and C) Work on Phase 2 of the temporary modular hub next to TEDI’s campus began in September. Completion of these works are planned for Spring/Summer 2023. Works include: • Slab construction in October and pouring of slabs in November • Modular units delivered and installed i
Slide 20: UK Power Networks
UK Power Networks • UK Power Networks will be undertaking cable installation works in the New Cross area. New cables will supply the electricity for the new substation. Works will also take place on Carriage Drive in Southwark Park. • Some survey works will be carried out within the area between Can
Slide 21: Q&A Contact us
Q&A Contact us You can contact the Canada Water Masterplan team at: Tel: 0800 470 4593 (freephone) Email: team@canadawater.co.uk Website: www.canadawater.co.uk