  1. Slide 1: oy

    oy

  2. Slide 2: Alberta's Economic Advantage

    Alberta’s Economic Advantage * Alberta forecasts one of the lowest unemployment rates in the country : 4.4% in 2014. _* Alberta added an average of 5,700 jobs per month in 2013 compared with only 2,600 in all other provinces combined. Job gains are expected to remain strong with 2.6% employment grow

  3. Slide 3: Slide 3

  4. Slide 4: Major Electric Transmission Projects

    MAJOR ELECTRIC TRANSMISSION PROJECTS men Eastern Alberta Transmission Line

  5. Slide 5: Slide 5

  6. Slide 6: ~ | aay v ‘

    Aa 4. ~ | aay v ‘ aN NYS Qe NEN X\ a “aN Ee % oh

  7. Slide 7: Major Electric Transmission Projects

    MAJOR ELECTRIC TRANSMISSION PROJECTS eee North East Transmission Development eem Central East Transmission Development mew Eastern Alberta Transmission Line men Hanna Region Transmission Development

  8. Slide 8: 8

    8

  9. Slide 9: 9

    9

  10. Slide 10: High Pressure Pipeline Project Calgary

    HIGH PRESSURE PIPELINE PROJECT CALGARY = Proposed High Pressure Natural Gas Pipelines —— Natural Gas Pipelines to be Removed from High Pressure Service -— Existing High Pressure Natural Gas Pipelines =—= Transportation Utility Corridor Boundary

  11. Slide 11: Slide 11

  12. Slide 12: Slide 12

  13. Slide 13: Slide 13

  14. Slide 14: Alberta's Long Term Power Outlook

    Alberta’s Long Term Power Outlook ; wee y, Expected Generation Capacity Requirements 11,900MW 6,300MW Existing Coal Existing Other Existing Gas —— Expected Effective Capacity with 15% Reserve Margin m Existing Effective Hydro Load Outlook at AIL Winter Peak = Existing Effective Wind

  15. Slide 15: Greenhouse gas emissions by sector

    -39 Mt i : a i 1 OilandGas Transportation Electricity Trade Exposed Buildings Agriculture Waste and Industries Other +38% +5 % -32% +3% +13% +1% +2% Source: Environment Canada

  16. Slide 16: Large Scale Hydro: Canadian Advantage

    Large Scale Hydro: Canadian Advantage eer Fix Nunavut ®colville Lake wf . »s_-| NWT and Alberta have . a . >| more than 10,000 MW of | N Northwest | undeveloped hydro — generation potential that could transform Canada’s | electric supply. Re “A e Wekweti 10} ~ Yukon . \. Territory k \ — 5 <=? eve /

  17. Slide 17: Slide 17

  18. Slide 18: Pool Price ($/MWh)

    —_ Np o Pool Price ($/MWh) i] o 4 o _ o o Ss Coal unit outages can create volatility in Pool Price I L_h > o 4 A NY TV = Annual Average Price Qi Q2 Q3 Q4/)Q01 Q2 Q3 Q4/Q1 Q2 Q3 04/Q1 Q2 Q3 04 2010 2011 2012 2013

  19. Slide 19: Regulatory Inefficiencies

    Regulatory Inefficiencies Gaps and overlaps add costs and create inefficiencies Utility

  20. Slide 20: Regulatory Inefficiencies: Alberta Regulatory Costs

    Regulatory Inefficiencies: Alberta Regulatory Costs ($M) | $146.12 million / 35 Alberta’s regulatory costs “Te million / $3.59M are adding to consumer bills Tr $120M + $9.20M AUC $36.26M $80M ~ i AESO $97.07M $40M - $13.54 million $0 | 1998 2013

  21. Slide 21: Connection Timeline

    . = . \ | xe Connection Timeline 7 | Source: AESO

  22. Slide 22: AESO's High Voltage Transmission Plan for Alberta

    AESO’s High Voltage Transmission Plan for Alberta NEW LINES meee 500 kV EXISTING LINES mame 500 kV HVDC m= 144 kV == 144 kV prebuilt to 240 kV Saeane 240 kV 6) FUTURE OIL & GAS © DEVELOPMENT

  23. Slide 23: ATCO's High Voltage Backbone Vision for Alberta

    ATCO’s High Voltage Backbone Vision for Alberta NEW LINES meee 500 kV EXISTING LINES mame 500 kV HVDC m= 144 kV == 144 kV prebuilt to 240 kV Saeane 240 kV 6) FUTURE OIL & GAS © DEVELOPMENT

  24. Slide 24: ATCO's High Voltage Backbone Vision for Alberta

    ATCO’s High Voltage Backbone Vision for Alberta NEW LINES meee 500 kV EXISTING LINES mame 500 kV HVDC m= 144 kV == 144 kV prebuilt to 240 kV Saeane 240 kV 6) FUTURE OIL & GAS © DEVELOPMENT

  25. Slide 25: ATCO's High Voltage Backbone Vision for Alberta

    ATCO’s High Voltage Backbone Vision for Alberta NEW LINES meee 500 kV EXISTING LINES mame 500 kV HVDC m= 144 kV == 144 kV prebuilt to 240 kV Saeane 240 kV 6) FUTURE OIL & GAS © DEVELOPMENT

  26. Slide 26: Slide 26

  27. Slide 27: Slide 27

  28. Slide 28: oy