  1. Slide 1: Tenke Fungurume - Project Update

    Tenke Fungurume - Project Update An Affiliate of February 2009 Freeport-McMoRan Copper & Gold

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward-looking statements. These forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events. These forward- looking statements are

  3. Slide 3: Tenke Fungurume

    Tenke Fungurume “…potentially one of the largest/highest grade copper/cobalt resource in the world”

  4. Slide 4: Ownership and Funding

    Ownership and Funding • 82.5% TF Holdings Limited • 17.5% Gecamines (carried interest) • TF Holdings shareholders – funding all project investments

  5. Slide 5: A World Class Copper District

    A World Class Copper District

  6. Slide 6: Copper Clearings

    Copper Clearings

  7. Slide 7: Mine Plan and Resource Expansion

    Mine Plan and Resource Expansion • FS basis 40 year mine plan • Oxides-Kwatebala, Fwaulu and Goma deposits developed first • Open pit - low strip ratio • High grade mine plan • Prove up new high grade for expansions with aggressive drilling program

  8. Slide 8: Exploration priorities

    ~~ (8) Ditoma O Priority Drill Targets O Oxide Target Zone i Copper Deposits Fwaulu Kwatebala S i co a Mwandinkomba Pa-@S @ Shinku —_— ) rungurume *® Kansalawile it t—— ee a e Cg East Mambilima — p> = ——— Sie > 7 j7 ~1*% Pumpi 5 km

  9. Slide 9: Development Plan

    Development Plan • Initial phase – 115,000 tpa Cu cathode / 8,000 tpa Co • Construction progress excellent. Commissioning and first copper cathode target – 2nd quarter 2009 • Investment for initial facilities plus expansion capability: $US1.75 billion • Full Production - second half 2009 • Explorati

  10. Slide 10: "Before" December 2007

    “Before” December 2007

  11. Slide 11: "After" December 2008

    “After” December 2008

  12. Slide 12: Kwatebala Prestripping

    a _“Kwatebala Prestripping ~ >

  13. Slide 13: Mining Method

    Mining Method

  14. Slide 14: Process

    Process Process Copper / Cobalt Ore From Mine Grinding Whole Ore Agitated Leaching Thickening and First and Second Tailings Neutralization Counter Current Stage Impurity Residue to disposal Decantation Removal Intermediate Cobalt Hydroxide Solvent Extraction product to Precipitation Market Electrowi

  15. Slide 15: Construction Site January 2009

    Construction Site January 2009 Tenke Fungurume DevelopmentFProject Update I J D H E G A B C A – Heavy Duty Shop, B – Dump Pocket, C – Stockpile, D – Grinding (SAG mill), E – Leach and CCD, F – Cobalt Precipitation, G – PLS Ponds, H – Solvent Extraction, I – Electrowinning, J – Sulphuric Acid Plant

  16. Slide 16: Regional Infrastructure

    Regional Infrastructure Construction Airstrip Plant Village Access Road Waste Dump Tailings Pond 220 KV Power Line Fwalu Pits Kwatebala SNEL Pit Power Substation TFM Camp Goma Pits SNCC Railway 150 KV Power Line National Road Each grid line = 2km 16

  17. Slide 17: DRC's Latent Power Supply

    DRC’s Latent Power Supply • Tenke a major investor in rebuilding system capacity • Investing in reliability and for expansions • Restarting latent capacity

  18. Slide 18: Transportation – A key Issue

    Transportation — A key Issue ras Cameroon Somalia Namibia

  19. Slide 19: Corporate Social Responsibility

    Corporate Social Responsibility • Safely run project and operations • Equator Principles • Voluntary Principles - Security and Human Rights • Applicable IFC guidelines • Freeport - high corporate standards • Extractive Industries Transparency Initiative • Implemented in partnership with NGO’s Tenke

  20. Slide 20: Key Social Issues

    Key Social Issues • Resettlement Plan • Community Development • Employment/Economic Community Meeting in Mulumbu Opportunities • A Sustainable Future New Fungurume School

  21. Slide 21: Social/Regional Commitments

    Social/Regional Commitments • Re-settlement to high standards • Environmental protection • Education, agriculture, water, health programs • Micro enterprise development • Infrastructure investment – roads, border, power • Operating Phase Social Development Foundation

  22. Slide 22: DRC Contract Review

    DRC Contract Review •Complex political process – very different issues between contracts •Tenke agreements - legally sound, equitable, binding. Cooperative dialogue on current issues. •Tenke Agreements = DRC Mining Code fiscal terms + additional financial + project and social commitments •> 60% of p

  23. Slide 23: Tenke Fungurume – one of the World's Largest New Copper Mines

    Tenke Fungurume – one of the World’s Largest New Copper Mines • Superb, experienced development team on site • Freeport making excellent progress. Critical circuits for first copper production nearing completion – stretch target first cathode - Q2 • Major expansion planning in progress • Best in cla

  24. Slide 24: For Our Shareholders

    For Our Shareholders • Stakeholders in a world class copper project • Freeport as Operator • Low cash operating costs • Strong project economics • Extraordinary upside potential

  25. Slide 25: Tenke Fungurume