Radisson Mining · TSXV:RDS

Radisson Mining — Radisson Mining Resources — Investor Presentation (October 2026)

43 slides from Radisson Mining's investor presentation, Oct 3, 2026

  1. Slide 1: A New Vision for an Historic High-Grade Gold Mine in Québec's Abitibi

    The O'Brien Gold Project A New Vision for an Historic High-Grade Gold Mine in Québec's Abitibi October 2026 TSXV:RDS OTCQX:RMRDF

  2. Slide 2: Cautionary Statement Regarding Forward-Looking Information

    TSXV : RD S OTCQX : RMRDF 2 Cautionary Statement Regarding Forward-Looking Information This presentation contains "forward-looking information" within the meaning of the applicable Canadian securities other risks of the mining industry; delays in obtaining governmental approvals or financing; risks

  3. Slide 3: Cautionary Statement Regarding Forward-Looking Information

    TSXV : RD S OTCQX : RMRDF 3 Cautionary Statement Regarding Forward-Looking Information Qualified Persons All-in Sustaining Cost (AISC) and AISC per Ounce Disclosure of a scientific or technical nature in this presentation was prepared under the supervision of Mr. Richard AISC is reflective of all of

  4. Slide 4: Exploring and Growing the Historic O'Brien Gold Project in Québec's Abitibi

    TSXV : RD S OTCQX : RMRDF 4 W H Y R A DI S S O N H I G H - G R AD E R ES O U R C E (E F F E C TI V E J AN 2 02 6 ) 1 Updated 2026 Mineral Resource Estimate Published March 2, 2026 Exploring and Growing the 0.63 Moz Indicated 1.69 Moz Inferred Historic O’Brien Gold 3.5 Mt at 5.59 g/t Au 10.4 Mt at 5.

  5. Slide 5: Management

    TSXV : RD S OTCQX : RMRDF 5 Board Pierre Beaudoin Peter MacPhail | Director Chairperson  35+ years of m ining experie nce . Formerly COO (2015-2022) of Alamos Gold, Aurico and Northgate Mine rals  30+ years of mining experie nce  Forme rly COO (2018-2024) of SilverCrest Metals Inc. for Las Chipas

  6. Slide 6: A History of Hub-and-Spoke Mining Complexes

    TSXV : RD S OTCQX : RMRDF 6 Q U É B E C ’ S A BI T I B I A History of Hub-and- N Spoke Mining Complexes Mines and Mining Services in Québec’s Abitibi (+100 Moz Au endowment) Positioned within the 25 Moz Cadillac- AGNICO: LaRonde IAMGOLD: Bousquet Camp on the Cadillac-Larder ROUYN- Doyon- Lake Break

  7. Slide 7: O'Brien located 3km from LaRonde Complex and 21km from Westwood-Doyon

    TSXV : RD S OTCQX : RMRDF 7 O’Brien located 3km (direct) from Westwood- LaRonde Complex and 21km Doyon (by road) from Westwood-Doyon Complex LaRonde Three mills, two operating tailings facilities, multiple shafts, highway, powerline, railway O’Brien Gold Project Cadillac

  8. Slide 8: Exploration and Growth

    Exploration and Growth

  9. Slide 9: Adjacent Ore Deposits in the Cadillac-Bousquet District

    TSXV : RD S OTCQX : RMRDF 9 Adjacent Ore Deposits in the Cadillac-Bousquet District O’Brien Project 2026 O’Brien MRE 140,000 m step-out drill program ongoing to 2km depth

  10. Slide 10: O'Brien Geology

    TSXV : RD S OTCQX : RMRDF 10 O’Brien Geology Ore Zone in surface trenching 30m east of O’Brien coreshack illustrates typical geological relationships Z-Fold Quartz Vein Quartz-sulphide veins with coarse VG within Piché Formation adjacent to the Cadillac-Larder Lake Break High strain, with biotite al

  11. Slide 11: O'Brien Geology: Multiple Veins and a High-Graded Historic Mine

    TSXV : RD S OTCQX : RMRDF 11 O’Brien Geology: Multiple Veins and a High-Graded Historic Mine

  12. Slide 12: Deep Exploration and Growth: Successful Step-Out Drilling

    TSXV : RD S OTCQX : RMRDF 12 Deep Exploration and Growth: Successful Step-Out Drilling A 140,000m step-out drill program with up to 8 drill rigs is ongoing to test the full potential of the Project 2025 MRE With Deep Step-Out Result: deep drill holes + wedges have intersected high-grade Drill Result

  13. Slide 13: Testing Project Scope

    TSXV : RD S OTCQX : RMRDF 13 Testing Project Scope 2026 MRE Update, 2.2 g/t Au Cutoff (US$2,500, 1.2m minimum width, 90% Recovery) Indicated Resource Inferred Resource 0.63 Million Oz 1.69 Million Oz (3.49 Mtonnes at 5.59 g/t) (10.37 Mtonnes at 5.08 g/t) Additional Exploration Target to 2km Depth De

  14. Slide 14: September Drilling Completed

    TSXV : RD S OTCQX : RMRDF 14 September 21, 2026: Drilling Completed since March 2026 MRE

  15. Slide 15: Recent Drilling Highlights

    TSXV : RD S OTCQX : RMRDF 15 Recent Drilling Highlights September 21, 2026: O’Brien Mine East Growing Inc. 68.24 g/t Au over 6.2m

  16. Slide 16: Recent Drilling Highlights

    TSXV : RD S OTCQX : RMRDF 16 Recent Drilling Highlights September 2, 2026: Closing the Undrilled Trend 1-2 Gap inc. 52.34 g/t Au over 3.0m

  17. Slide 17: Recent Drilling Highlights

    TSXV : RD S OTCQX : RMRDF 17 Recent Drilling Highlights July 7, 2026: Highest Ever Drill Assay in History of Project 316 g/t Au over 5.1m

  18. Slide 18: Recent Drilling Highlights

    TSXV : RD S OTCQX : RMRDF 18 Recent Drilling Highlights July 7, 2026: Highest Ever Drill Assay in History of Project OB-26-385W4 1,603.95 g/t Au over 1.0 metre (within 316.31 g/t Au over 5.1 metres). OB-26-384W1 132.28 g/t Au over 1.3 metres (within 46.22 g/t Au over 3.9 metres)

  19. Slide 19: Recent Drilling Highlights

    TSXV : RD S OTCQX : RMRDF 19 Recent Drilling Highlights April 30, 2026: Deepest Intercept to Date at 1.9 Km

  20. Slide 20: 18 Month Drilling Success

    TSXV : RD S OTCQX : RMRDF 20 W H Y R A DI S S O N Drill Results Reported Over the Last 12 Months 18 Month Drilling Success Holes “Hit” “Hit” 1. Represents 100% of drill holes completed and assayed (Contains News Release Best Intercept2 2. The O’Brien Gold Project MRE effective May 6, 2025 utilizes a

  21. Slide 21: MRE 2026 Indicated and Inferred Mineral Resources

    TSXV : RD S OTCQX : RMRDF 21 MRE 20261 (US$2,500, 2.2 g/t Au Cut-Off, 1.2m Minimum Width, 90% Recovery) Indicated Mineral Resources (koz) Tonnes (kt) Grade (g/t Au) Oz (koz Au) 501 582 628 Indicated Mineral 3,493 5.59 628 289 Resources Inferred Mineral 10,368 5.08 1,692 Williamson SLR March 2023 SLR

  22. Slide 22: 2026 MRE Sensitivity by Cut-Off

    TSXV : RD S OTCQX : RMRDF 22 2 0 2 6 M RE Up d a t e 8 g/t Au 4.5 g/t Au (Historic O’Brien Mine, US$700/oz) (March 2023 MRE, US$1,250/oz) 2026 MRE Indicated Indicated Sensitivity 0.24 Moz 0.43 Moz (0.6 Mt at (1.6 Mt at by Cut-Off 12.7 g/t Au) 8.4 g/t Au) The updated MRE for the O’Brien Gold Project

  23. Slide 23: Mine Development

    Mine Development

  24. Slide 24: O'Brien 2025 Metallurgy Study

    TSXV : RD S OTCQX : RMRDF 24 O’Brien 2025 Metallurgy Study1 2024-2025 metallurgical program undertaken at the Lakefield, Ont. facilities of SGS Canada under the supervision of Ausenco Engineering. 35 samples of mineralized core from 0.8 g/t to 49.1 g/t in four composite samples for each principal Pi

  25. Slide 25: O'Brien 2025 PEA: Basis of Study

    TSXV : RD S OTCQX : RMRDF 25 Westwood- O’Brien 2025 PEA: Basis of Study Doyon Complex “Snap-shot” study using 2025 MRE, based on drilling to the end of 2022. Does not incorporate the recently expanded 2026 MRE. 140,000m fully LaRonde funded drill program ongoing. Complex Assumes off-site milling bas

  26. Slide 26: C$57M to Support Advanced Underground Exploration Program

    TSXV : RD S OTCQX : RMRDF 26 A G N I C O EA G L E I N V E S T M E N T ST RA T EG I C I NV E STM E NT (C L O S ED S EP TE MB ER 1, 20 2 6) 1 C$1.07/unit. 19% premium to 20-day VWAP and 6% to spot. Half warrant at C$57M to Support C$1.39. 10.45% ownership of issued/outstanding and 14.90% partially dil

  27. Slide 27: Corporate

    Corporate

  28. Slide 28: Next Steps

    TSXV : RD S OTCQX : RMRDF 28 Next Steps Pursuing Exploration Growth Pursuing Development Path Significant Success with Ongoing Integration into Existing Mine-and-Mill Exploration Complex or Stand Alone? Fully Funded 140,000m drill C$57M investment by Agnico-Eagle to program with up to 8 rigs through

  29. Slide 29: Capitalization and Balance Sheet

    TSXV : RD S OTCQX : RMRDF 29 Capitalization and Balance Sheet Shareholder Distribution Tickers TSXV:RDS | OTCQX:RMRDF 35.4% 6.0% Share Price 1 C$1.08 Management & Public Float Insiders 2 Market Cap (Basic) C$552 Million 2 Common Shares 512 Million 25.0% Options 2 15 Million Institutional 10.4% Share

  30. Slide 30: Contact Information

    Contact Information Matt Manson President, CEO & Director mmanson@radissonmining.com Hubert Parent-Bouchard Chief Financial Officer hpbouchard@radissonmining.com Radisson Mining Resources Inc. 50 rue du Petit-Canada Kristina Pillon Rouyn-Noranda, Qc J0Y 1C0 Manager, Investor Relations Investor Inqui

  31. Slide 31: Appendix

    Appendix

  32. Slide 32: O'Brien Gold Project

    TSXV : RD S OTCQX : RMRDF 32 O’Brien Gold Project 32

  33. Slide 33: Well Understood Geology

    TSXV : RD S OTCQX : RMRDF 33 Well Understood Geology Good understanding of vein morphology and continuity from mapping of historic O’Brien workings At large-scale the veins are continuous, sub-parallel to the stratigraphy and are developed within multiple units of the Piche Group. Vein Model with 13

  34. Slide 34: O'Brien 2025 PEA: Sensitivities

    TSXV : RD S OTCQX : RMRDF 34 O’Brien 2025 PEA: Sensitivities Valuation Sensitivities to Gold Price (C$M)note1,2 1. See "Non-IFRS Measures". Gold Price (US$/oz) $1,800 $2,200 $2,550 $3,000 $3,300 $4000 2. Payback is defined as achieving cumulative Price Case Downside Consensus Upside “Spot” positive

  35. Slide 35: Gold Price Assumptions and Sensitivities

    TSXV : RD S OTCQX : RMRDF 35 W H Y R A DI S S O N Gold Price Assumptions Project Assumptions and Sensitivities Assumption At US$4,000 Au 2026 MRE1 US$2500/oz More Ounces, More Tonnes, Lower Grade 2025 PEA MRE/DSO 2 US$2000/oz More Tonnes, Larger Stopes, Better Continuity (Stope Design) NPV5% from C$

  36. Slide 36: O'Brien 2025 PEA: Underground Mine Design

    TSXV : RD S OTCQX : RMRDF 36 O’Brien 2025 PEA: Underground Mine Design Long hole stoping with cemented rock backfill. 2.2m minimum and 2.7m average stope widths Stope Optimization at US$2,000/oz Au 11 year Life. Years 2–8: 1,160 tpd prod. stopes PEA contemplates 2,000 tpd of mill capacity Hence, all

  37. Slide 37: O'Brien 2025 PEA: Underground Mine Design (2)

    TSXV : RD S OTCQX : RMRDF 37 O’Brien 2025 PEA: Underground Mine Design (2) Twin portals and 4.5mx4.5m ramp access 20 tonne trucks and vertical conveyor from 300m level to surface 86km of development and 25m levels Does not utilize historic O’Brien Mine. Utilizes Kewagama Mine infrastructure for vent

  38. Slide 38: O'Brien 2025 PEA: Underground Mine Design (3)

    TSXV : RD S OTCQX : RMRDF 38 O’Brien 2025 PEA: Underground Mine Design (3) 56% of mined ounces in the PEA mine plan are from Indicated Mineral Resources and 44% from Inferred Mineral Resources Indicated/Inferred Mineral Resource blocks are equally distributed through the 11-year life Future infill d

  39. Slide 39: "Trends" and "Gaps" at O'Brien

    TSXV : RD S OTCQX : RMRDF 39 “Trends” and “Gaps” at O’Brien Previous drilling at O’Brien has defined steeply plunging mineralization “Trends” separated by “Gaps”, a pattern that defines the character of the mineral Historic O’Brien Mine Historic O’Brien Mine resource block model and influences explo

  40. Slide 40: O'Brien 2025 PEA: Surface Facilities

    TSXV : RD S OTCQX : RMRDF 40 O’Brien 2025 PEA: Surface Facilities No mill, tailings facility, or major surface earthworks No requirement for major access or power Water Treatment infrastructure No camp, surface maintenance (small vehicle Historic Mine Waste Rock maintenance at existing O’Brien facil

  41. Slide 41: O'Brien 2025 PEA: Costs

    TSXV : RD S OTCQX : RMRDF 41 O’Brien 2025 PEA: Costs LOM Capital Costs (C$M) note 1,2 LOM Operating Costs and AISCnote 1,2 Mining Capex $93 $346 C$M Mining, Haulage and Water Management Mobile Equipment $25.7 $75.66 C$/tonne milled Mine Development $47.4 $173 C$M Buildings $0.4 Processing & Tailings

  42. Slide 42: Neighbouring Mills to the O'Brien Project: Quebec

    TSXV : RD S OTCQX : RMRDF 42 Neighbouring Mills to the O’Brien Project: Quebec Operating Process Facilities Sleeping Giant Mill 1. LaRonde Complex Exploration Projects Owner Abcourt Mines includes two mines Mine Feed Elder Mine (LaRonde Mine, LZ5 Mine) Throughput 350 tpd(3) which feed into two LaRon

  43. Slide 43: Neighbouring Mills to the O'Brien Project: Ontario

    TSXV : RD S OTCQX : RMRDF 43 Neighbouring Mills to the O’Brien Project: Ontario Operating Process Facilities Bell Creek Mill Normetal, Globex Mining Exploration Projects Owner Pan American Silver Mine Feed Bell Creek, Timmins West Throughput 4,400 tpd Capacity 5,359 tpd Dome Mill North Timmins, Gowe

Radisson Mining Resources — Investor Presentation (October 2026) on 6ix