Pan American Silver Corp. · TSX:PAAS

Pan American Silver — Investor Presentation (March 2023)

43 slides from Pan American Silver's investor presentation, March 2023

  1. Slide 1: Investor Presentation March 2023

    INVESTOR PRESENTATION // MARCH 2023

  2. Slide 2: Cautionary statements and non-GAAP measures

    2 timing for the same, and any anticipated benefits therefrom; the timing for any for gold, silver and other metals; future anticipated prices for gold, silver and future guidance related to production, AISC, operating and sustaining costs, or other metals and assumed foreign exchange rates; the tim

  3. Slide 3: Cautionary statements (continued)

    3 CONTINUED information, changes in assumptions, future events or otherwise, except to the U.S. companies. In particular, and without limiting the generality of the extent required by applicable law. foregoing, this presentation uses the terms “measured resources,” “indicated Such factors include, w

  4. Slide 4: Yamana transaction overview

    4 • Total consideration of US$4.8 billion or US$5.02 per Yamana share (as of Nov. 4, 2022 announcement of binding proposal) • Comprised of US$1.0 billion in cash funded by Agnico Eagle, ~36.1 million Agnico Eagle shares and up to ~156.9 million Pan American shares • Pan American is the purchaser of

  5. Slide 5: Enhanced diversification across the Americas

    CANADA Timmins 5 Dolores // Pan American has the scale & experience to capture value La Colorada Skarn Deposit opportunities in the Americas, where we have been operating for MEXICO GUATEMALA nearly 3 decades Escobal (C&M) • 4 producing mines(1): Jacobina, El Peñón, Minera Florida & Pan American Ass

  6. Slide 6: Production increases and growth projects

    6 // Assets to be acquired through Yamana Transaction have a long history of reserve replacement & an extensive exploration portfolio • Production increases on a pro forma basis for 2022: • Annual silver production would have increased by ~50%(1) • Annual gold production would have increased by ~102

  7. Slide 7: The go-to name for investing in silver

    7 // The “go-to” name for investing in silver Large silver reserves(1) • PAAS’ proven and probable silver mineral reserves of 514.9M ozs + 933.0M ozs of measured and indicated silver mineral resources • Yamana’s proven and probable silver mineral reserves of 111.0M ozs + 50.9M ozs of measured and in

  8. Slide 8: Supports growth and capital returns to shareholders

    8 // Supports investment in growth & capital returns to shareholders Accretive per share to key financial Opportunity to capture synergies and operating metrics, even before estimated between $40-$60M annually considering synergies through operational efficiencies from the combined LATAM portfolios,

  9. Slide 9: Prudent balance sheet management

    9 Cash & Short-term investments $142.3M TOTAL //Prudent balance sheet management reduces risk, AVAILABLE improves long-term shareholder returns LIQUIDITY(1) $482.3M √ Total debt(2) of $226.8M as at December 31, 2022, related to Sustainability-Linked Revolving Credit Facility, lease liabilities & con

  10. Slide 10: La Colorada Skarn: large polymetallic deposit

    10 ZACATECAS, MEXICO // 100% owned, large, polymetallic deposit with potential for decades of production • Over 240,000 metres drilled since discovery in October 2018; only 80% of metres used in the updated resource provided on September 14, 2022 • Skarn footprint of 1,500 metres x 1,100 metres, ope

  11. Slide 11: La Colorada ventilation shaft

    11 The fully concrete lined 5.5-metre diameter and 560-metre deep ventilation shaft is expected to be completed in 2023 at a cost of ~$47M. Ventilation fans to be installed on shaft in 2024, reducing power requirements upon commissioning. In 2022, shaft sinking initiated and advanced to a depth of 8

  12. Slide 12: La Colorada Skarn mineral resource

    12 ZACATECAS, MEXICO Mining Cut-off Resource Tonnes Zn Pb Ag Zn Pb Ag Method Value Classification (millions) (%) (%) (g/t) (Mt) (Mt) (Moz) (US$/tonne) Indicated 95.9 2.77 1.28 31 2.66 1.23 94.4 Sub-level 45 Caving (SLC) Inferred 147.8 2.29 1.04 28 3.39 1.54 132.9 Notes: 5. Reasonable prospects for e

  13. Slide 13: La Colorada Skarn mineralisation zones

    13 ZACATECAS, MEXICO // polymetallic skarn mineralisation is concentrated in 3 zones, covering an area of 1,500 metres by 1,100 metres laterally, and a depth of between 600 metres and 1,900 metres below surface

  14. Slide 14: Escobal: one of the world's best silver mines

    14 SANTA ROSA, GUATEMALA // One of the world’s best silver mines • High quality, well built operation with over US$500 million invested1 • One of the world’s largest primary silver deposits with reserves of 264 Moz • 3 consecutive years of production at 20 Moz Ag/year at AISC consistently below US$1

  15. Slide 15: Escobal ILO 169 consultation process

    15 // Escobal mining license suspended pending completion of an ILO 169 Consultation in Guatemala. For more information visit: https://mem.gob.gt/pueblo-indigena-xinka/ PRE-PHASE 1 PHASE 1 PHASE 2 PHASE 3 REVIEW PRE-CONSULTATION CONSULTATION SUPREME COURT VERIFICATION PAS Guatemala shall work Minist

  16. Slide 16: Other investments and projects: NUAG, La Arena II, Amalia

    16 (NUAG) (Peru) (Mexico) Pan American owns a ~9.4% undiluted Pan American holds a 100% interest JV agreement with Radius Gold: Pan interest in NUAG, which is advancing the in La Arena II, an undeveloped American holds a 65% interest in the Amalia Silver Sands and Carangas exploration copper-gold pr

  17. Slide 17: ESG ratings and rankings

    17 Reporting Frameworks and Standards Ratings and Rankings (as of February 21, 2023) 68 BBB rating Ranked top 7% in the Metals & Upgraded to ‘BBB’ from ‘BB’ in Mining industry November 2021 Memberships and Commitments Scale: 0 (worst) to 100 (best). Scale: CCC (worst) to AAA (best). 25.9 (medium ris

  18. Slide 18: PAAS Snapshot

    18 // PAAS SNAPSHOT 1 $3.5B $0.10 MARKET CAP QUARTERLY DIVIDEND2 210.7M 2.4% Long-life silver reserves SHARES OUTSTANDING DIVIDEND YIELD Medium and long-term growth projects 3.8M 10 3-MONTH DAILY SELL SIDE AVERAGE SHARES ANALYSTS Committed to best-in-class ESG performance MEMBER OF THE MSCI WORLD AN

  19. Slide 19: Appendix

    PAN AMERICAN APPENDIX

  20. Slide 20: Q4 2022 highlights

    20 NASDAQ: PAAS // TSX: PAAS Announced transaction to acquire Revenue of $375.5M excludes Yamana Gold with related expenses approximately $45M to $50M of impacting earnings and cash flow finished goods inventory build-ups Silver production of 4.8 Moz and gold Strong financial position with total pro

  21. Slide 21: 2022 cash flow and liquidity bridge

    21 Sustaining Cash Flow Performance Growth, Business Development, and Other $800 $418 $9 $750 $700 $650 $600 $550 $500 ($224) $450 $400 Millions $335 ($138) $350 $300 $263 $9 $3 ($95) $250 ($42) $200 ($71) $142 $150 ($45) $100 ($16) $50 $0 Cash and STI Adjusted Net other Sustaining Net income Divide

  22. Slide 22: ESG structure and accountability

    22 // Structure and Accountability E N V I R O N M E N TA L AND SOCIAL • The Communities and Sustainable Development (CSD) Committee reviews the Company’s 35% sustainability and ESG performance. 15% • The Health, Safety, and Environment (HSE) Committee provides policy direction and oversight of SAFE

  23. Slide 23: Climate change strategy

    23 // Climate Change Strategy // 30% reduction in GHG emissions by 2030 and an aspirational objective of net zero by 2050 • Integrating GHG emission reduction strategies into our operational risk and opportunities assessments and strategic planning • Adapting our operating and non-operating mines to

  24. Slide 24: ESG ratings history

    24 // As of December 31, 2022 S&P Global 0 (worst) to 100 (best) 23 46 56 68 94 MSCI CCC (worst) to AAA (best) BB BB BBB BBB ~43 Sustainalytics 0 (best) to 100 (worst) 44.0 35.6 31.0 27.3 82 (SEVERE RISK) (HIGH RISK) (HIGH RISK) (MEDIUM RISK) 1 (higher disclosure) to E 10 (lower disclosure) - 5 3 4

  25. Slide 25: Silver supply and demand

    25 // 2022 estimate(1); in million ounces Mine Photography & Industrial Recycling Production Other Investment2 45% 18% 82% 3% 27% Silver Silver Supply Demand 1,017 1,210 Jewelry & Silverware 25% ~ 194 Moz supply shortfall estimated for 2022 1. Source: Silver Institute, Nov. 18, 2022. 2. Net physical

  26. Slide 26: Growth in silver demand for solar installations

    26 // Continued growth in silver demand for solar installations Index is based on silver loadings per cell Source: Metals Focus, EPIA, December 2022

  27. Slide 27: Industrial demand from decarbonization and electrification

    27 // Growing industrial demand from global transition to decarbonization and electrification • Silver has the highest electrical and thermal conductivity of all metals, making it an important metal in the transition to a low carbon economy. • ~11% of silver supply used for photovoltaics (solar pane

  28. Slide 28: La Colorada

    28 La Colorada ZACATECAS, MEXICO // Pan American’s largest silver producing mine • 100% owned and operated underground mine • Expansion completed in 2017 – new mine shaft and sulphide processing plant • Currently producing silver-gold doré bars from a conventional cyanide leach plant for the oxide o

  29. Slide 29: Dolores

    29 Dolores CHIHUAHUA, MEXICO // Large gold / silver Mine • 100% owned and operated • Mining is by open pit and uses conventional cyanide heap leaching to produce gold and silver doré • Average throughput capacity of 20,000 tpd Silver & Gold Production Mineral Reserves & Resources Silver (Moz) Gold (

  30. Slide 30: Huaron

    30 PASCO, PERU Huaron // Polymetallic silver mine • 100% owned and operated underground mine • Average throughput capacity of ~2,500 tpd using flotation technology to produce silver in copper, lead, and zinc concentrates Silver Production (Moz) Mineral Reserves & Resources 3.7 Grade Contained Metal

  31. Slide 31: San Vicente

    31 POTOSÍ, BOLIVIA San Vicente // Polymetallic silver mine • 95% owned and operated underground mine • Average throughput capacity of ~950 tpd utilizing a standard flotation process to produce silver-zinc and silver-lead concentrates • Mechanization efforts, enhanced mine dilution controls and impro

  32. Slide 32: Shahuindo

    32 CAJAMARCA, PERU Shahuindo // Large gold mine with significant growth potential • 100% owned and operated open pit gold mine producing silver by-products from doré • Average throughput capacity of ~36,000 tpd with heap leach processing • Commercial production began in 2016, significant exploration

  33. Slide 33: La Arena

    33 LA LIBERTAD, PERU La Arena // Gold mine with sulphide expansion potential (La Arena II) • 100% owned and operated open pit gold mine producing doré • Run-of-mine heap leach currently processing ~36,000 tpd • Exploration success has extended mine life Gold Production (Koz) Mineral Reserves & Resou

  34. Slide 34: Timmins West and Bell Creek

    34 ONTARIO, CANADA Timmins West Bell Creek // Two producing mines in prolific Canadian mining camp • 100% owned and operated • Comprises two underground gold mines, Timmins West and Bell Creek, which both feed the Bell Creek mill • Throughput capacity of ~6,000 tpd producing doré • Exploration succe

  35. Slide 35: La Arena II

    35 LA LIBERTAD, PERU La Arena II // 100% owned, undeveloped copper porphyry Reserves & Resources (as of June 30, 2021) Grade Contained Metal Tonnes Au Cu Au Cu (Mt) (g/t) (%) (koz) (kt) M&I Resources 696.3 0.24 0.38 5,280 2,623 Inferred Resources 54.7 0.23 0.29 413 159 Model Highlights & Key Assumpt

  36. Slide 36: Navidad

    36 CHUBUT, ARGENTINA // One of the largest undeveloped primary silver deposits Navidad • 100% owned silver project • Project comprises 8 individual mineral deposits in 3 separate mineralized trends • Scalable production profile with high-grade mineralization at surface • Development contingent on pr

  37. Slide 37: Mineral resource estimate at different cut-offs and mining methods

    37 ZACATECAS, MEXICO // Mineral Resource Estimate at Different Cut-off Values and Mining Methods 1. Prices used to report mineral resources were: US$22 per ounce of silver, US$2,800 per tonne of zinc and US$2,200 per tonne of lead. Mining Cut-off Value Classification Tonnes Zn Pb Ag Zn Pb Ag 2. An e

  38. Slide 38: Proven and probable mineral reserves as of June 30, 2022

    38 As of June 30, 2022 (1,2) Silver Segment Huaron Peru Proven 7.0 169 38.1 0.54 38.0 1.51 105.6 2.97 208.2 Probable 3.9 167 21.1 0.30 11.8 1.63 64.2 2.97 116.6 Morococha (92.3%) (3) Peru Proven 3.3 156 16.6 0.44 14.7 1.31 43.3 3.95 130.7 Probable 3.3 158 16.6 0.32 10.6 1.43 46.5 3.78 123.1 La Color

  39. Slide 39: Measured and indicated mineral resources as of June 30, 2022

    39 As of June 30, 2022 (1,2) Silver Segment Huaron Peru Measured 2.1 163 10.9 0.42 1.58 3.05 Indicated 2.4 166 12.7 0.40 1.71 2.92 Morococha (92.3%) (3) Peru Measured 0.6 130 2.7 0.64 0.79 2.59 (1) See table below entitled "Metal price Indicated 0.7 124 3.0 0.61 0.74 2.37 assumptions used to estimat

  40. Slide 40: Inferred mineral resources as of June 30, 2022

    40 as of June 30, 2022 (1,2) Silver Segment Huaron Peru Inferred 7.2 155 36.1 0.26 1.47 2.73 Morococha (92.3%) (3) Peru Inferred 5.2 143 24.0 0.35 1.28 3.74 La Colorada Mexico Inferred 14.9 195 93.9 0.20 98.4 1.05 1.89 La Colorada Skarn(4) Mexico Inferred 147.8 28 132.9 1.04 2.29 Manantial Espejo Ar

  41. Slide 41: Metal price assumptions for reserves and resources

    41 Metal Price Assumptions Used to Estimate Mineral Reserves and Resources as of June 30, 2022 Huaron All categories 19.00 1,300 7,000 2,000 2,600 Morococha All categories 19.00 1,300 7,000 2,000 2,600 La Colorada All categories 19.00 1,300 7,000 2,000 2,600 La Colorada skarn All categories 22.00 2,

  42. Slide 42: Technical notes on mineral reserves and resources

    42 Mineral reserves and mineral resources are as defined by the Canadian Institute of Mining, Metallurgy and Petroleum. Pan American reports mineral resources and mineral reserves separately. Reported mineral resources do not include amounts identified as mineral reserves. Mineral resources that are

  43. Slide 43: Investor relations contact

    43 Siren Fisekci VP, INVESTOR RELATIONS & CORPORATE COMMUNICATIONS +1.604.806.3191 ir@panamericansilver.com Panamericansilver.com Suite 1440, 625 Howe Street Vancouver, BC, V6C 2T6

Pan American Silver — Investor Presentation (March 2023) on 6ix