Prosafe SE · OSL:PRS

Prosafe — Pareto Oil & Offshore Conference 2017

27 slides from Prosafe's conference presentation, Sep 13, 2017

  1. Slide 1: Pareto Oil & Offshore Conference

    Slide 1: Pareto Oil & Offshore Conference

    13 September 2017 Pareto Oil & Offshore Conference

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

  3. Slide 3: Agenda

    Slide 3: Agenda

    Agenda  Introductory Highlights  Plan the work - Work the plan  Status and outlook  Summary 3

  4. Slide 4: Who we are

    Slide 4: Who we are

    Who we are World’s most diversified fleet of 8 semi-submersible 1 accommodation-, service- and safety vessels and one monohull under management, three new builds and one TSV vessel 2 Mid to late cyclical, typically exposed to brownfield MMO type work as well as hook-up & commissioning and decommissi

  5. Slide 5: A billion dollar runway through 2020

    Slide 5: A billion dollar runway through 2020

    A billion dollar runway through 2020  Improved cash flow 2017-2020 of more than 250 Cash actual Q2 2017 USD 1 billion 200 ~ Cash neutral EBITDA level  Cash neutral on average at EBITDA of 150 approx. USD 100 million 100  2017 EBITDA guidance of approx. MUSD 50 120 0  Positioning for 2020 and bey

  6. Slide 6: Events over the past year

    Slide 6: Events over the past year

    Events over the past year  Contracting success: • Awarded 12 month firm contract for Statoil at Johan Sverdrup with commencement mid-2018 • Safe Notos commenced three-year and 222 day contract for Petrobras in Brazil • August 2017, Safe Boreas commenced 13 month firm contract for Statoil in the UK

  7. Slide 7: Significant reductions in cost and capex

    Slide 7: Significant reductions in cost and capex

    Significant reductions in cost and capex 2011-2015 annual Initial target levels average levels Run rate (Pareto Sept. 2016) (May 2017) Onshore operating cost USD 40m USD 28-30m USD 22m (-25-30%) (-45%) Annual fleet capex1) USD 60m USD 20-30m USD 10-15m 1) Excluding new-builds and conversions Headcou

  8. Slide 8: Contributing to fleet renewal and high-grading

    Slide 8: Contributing to fleet renewal and high-grading

    Contributing to fleet renewal and high-grading 8

  9. Slide 9: Agenda

    Slide 9: Agenda

    Agenda  Highlights  Plan the work - Work the plan  Status and outlook  Summary 9

  10. Slide 10: Proactive in restructuring of the industry

    Slide 10: Proactive in restructuring of the industry

    Proactive in restructuring of the industry Regalia (’85/’09) «Next phase Fleet renewal Engaging in M&A: restructuring» Growth and and rightsizing: consolidation: 1. Acq. of 1.Consolidation Creation: 1. Renewal Nova/Vega 2. More scrapping 1. Acq. of Discoverer ASA 2. Conversion to Merger between 2. A

  11. Slide 11: Fleet renewal – controlling 3 new builds at COSCO

    Slide 11: Fleet renewal – controlling 3 new builds at COSCO

    Fleet renewal – controlling 3 new builds at COSCO  Negotiations with COSCO regarding Safe Nova, Safe Vega and Safe Eurus ongoing • The standstill agreement between Prosafe and COSCO related to Safe Nova and Safe Vega has been extended until December 2017  Looking for optionality and value creation

  12. Slide 12: TSV Safe Scandinavia – Westcon dispute

    Slide 12: TSV Safe Scandinavia – Westcon dispute

    TSV Safe Scandinavia – Westcon dispute  Court proceedings commenced 22 August 2017  The yard’s budget for the work matured to approx. NOK 1.07 billion after several revisions  Total cost claimed by yard approx. NOK 2.4 billion • Prosafe has already paid approx. NOK 2.1 billion • Yard has claimed

  13. Slide 13: Safe Scandinavia – drilling support at Oseberg

    Slide 13: Safe Scandinavia – drilling support at Oseberg

    Safe Scandinavia – drilling support at Oseberg  Firm contract with Statoil until end June 2018 at Oseberg on the NCS  Strong operational and technical performance • Drilling program well ahead of plan  Focus on Safety & Compliance  Focus on positioning the TSV Safe Scandinavia towards and beyond

  14. Slide 14: Safe Scandinavia – capabilities

    Slide 14: Safe Scandinavia – capabilities

    Safe Scandinavia – capabilities  Target mature platforms, which either do not Planned concurrent activities: have facilities or infrastructure, or require significant upgrade and re-commissioning to perform Drilling support • Permanent Plug and Abandon (P&A) • Well intervention • “Making Safe” / ot

  15. Slide 15: Agenda

    Slide 15: Agenda

    Agenda  Highlights  Plan the work - Work the plan  Status and outlook  Summary 15

  16. Slide 16: Contract portfolio

    Slide 16: Contract portfolio

    Contract portfolio Firm order book at end Q2 2017 of approx. MUSD 443 16

  17. Slide 17: Outlook - North Sea

    Slide 17: Outlook - North Sea

    Outlook - North Sea Age of fixed facilities  Currently low tendering activity due to in the North Sea low and deferred operator spending  Longer term, expect increased tendering and contracts related to support accumulating maintenance backlog and modification work at ageing infrastructure in the

  18. Slide 18: Outlook - Brazil

    Slide 18: Outlook - Brazil

    Outlook - Brazil  Petrobras technical specifications (‘GTD’) have evolved substantially since 2010 – some of the highest requirements of any operator – significantly reducing the compliant supply in Brazil  9 vessels of 8 owners operating in 2015 Opportunity  Presently 5 vessels contracted, reduc

  19. Slide 19: Prospects and tendering – Prosafe business intel

    Slide 19: Prospects and tendering – Prosafe business intel

    Prospects and tendering – Prosafe business intel Tenders and Prospects - outlook is generally three years  Six tenders ongoing for 2017 through 2019 – all outside North Sea  The prospect list with a three-year look-out remains at a relatively high level  16 prospects with high probability of goin

  20. Slide 20: Summary

    Slide 20: Summary

    Summary  Currently low tendering activity due to deferred operator spending. Most activity outside the North Sea  The prospect list with a three-year look-out remains at a relatively high level  Positioning TSV Safe Scandinavia towards and beyond June 2018 for strategic optionality based on vesse

  21. Slide 21: Appendix

    Slide 21: Appendix

    Appendix @ Prosafe

  22. Slide 22: Income statement

    Slide 22: Income statement

    Income statement (Unaudited figures in USD million) Q2 17 Q1 17 Q2 16 6M 17 6M 16 2016 Operating revenues 61.7 75.7 115.4 137.4 218.4 474.0 Operating expenses (37.3) (44.9) (53.8) (82.2) (111.5) (220.8) EBITDA 24.4 30.8 61.6 55.2 106.9 253.2 Depreciation (33.8) (33.4) (29.1) (67.2) (52.5) (115.7) Im

  23. Slide 23: Balance sheet

    Slide 23: Balance sheet

    Balance sheet (Unaudited figures in USD million) 30.06.17 31.03.17 31.12.16 30.06.16 Goodwill 226.7 226.7 226.7 226.7 Vessels 1 967.0 1 997.8 2 029.3 1 559.0 New builds 124.9 123.3 122.2 654.9 Other non-current assets 12.3 13.9 13.9 4.3 Total non-current assets 2 330.9 2 361.7 2 392.1 2 444.9 Cash a

  24. Slide 24: Update on vessel’s cost per day

    Slide 24: Update on vessel’s cost per day

    Update on vessel’s cost per day  CPD in operation being reduced by an average of ca. 30% since 2014 Opex (CPD k/d)* NCS/UK NCS (TSV) UKCS Brazil (figures in USD) DP Moored Moored DP 2014 75-80/60-65 100-105 50-55 60-65 2017e 60-65/40-45 85-90 30-35 40-45 % reduction 19%/32% 15% 38% 32% * Excl. fuel

  25. Slide 25: EBITDA and capex guidance

    Slide 25: EBITDA and capex guidance

    EBITDA and capex guidance Current guidance 2017 EBITDA Ca. MUSD 120 1) Capex per year MUSD 10-15 2) 1) May vary with currency movements 2) Incl. SPS for the Safe Caledonia 25

  26. Slide 26: Order book

    Slide 26: Order book

    2017 2020 2018 2019 31 % 6% 48 % 15 % Q2 17 Q1 17 Q4 16 Q3 16 Q2 16 Firm order book at end Q2 2017 of approx. MUSD 443 Q1 16 Q4 15 Q3 15 Q2 15 Q1 15 Q4 14 Q3 14 Q2 14 Q1 14 Q4 13 Q3 13 Firm contracts Firm contracts Q2 13 Q1 13 Q4 12 Q3 12 Q2 12 Q1 12 Q4 11 Q3 11 Order book Q2 11 Q1 11 Q4 10 Q3 10 Q2

  27. Slide 27: High-quality and diversified fleet

    Slide 27: High-quality and diversified fleet

    High-quality and diversified fleet - Global reach New builds Established fleet Drilling Support Zephyrus (‘16) Notos (‘16) Boreas (‘15) Regalia (’85/’09) Astoria (‘83/’12) Scandinavia (’84/’15) Nova Vega Eurus Marketed Concordia (’05/’15) Bristolia (’83/’08) SCRAPPED 5 VESSELS Caledonia (’82/’12) Sa

Source: Internet Archive copy of prosafe.com

More decks from Prosafe SE

All 115 Prosafe decks