  1. Slide 1: America's Emerging Uranium Producer

    AMERICA’S EMERGING URANIUM PRODUCER URANIUM ENERGY CORP | NYSE MKT: UEC | URANIUMENERGY.COM

  2. Slide 2: Disclaimer

    Disclaimer Statements contained in this presentation which are not historical facts are measured mineral resources, indicated mineral resources and inferred forward-looking statements that involve risks, uncertainties and other factors mineral resources, while recognized and required by Canadian reg

  3. Slide 3: Our Mission

    Our Mission TO EXPAND URANIUM PRODUCTION USING LOW COST IN-SITU RECOVERY(ISR) WHILE DEVELOPING A PIPELINE OF RESOURCES FOR MAJOR ONGOING GROWTH 3

  4. Slide 4: UEC's Hobson ISR Processing Plant – South Texas

    UEC’s Hobson ISR Processing Plant – South Texas 4

  5. Slide 5: Energy equivalence of uranium barrels

    These barrels of uranium produce the energy equivalence of 220,000 barrels of oil. 5

  6. Slide 6: Uranium Cheaper Fuel vs. Oil or Gas

    Uranium Cheaper Fuel vs. Oil or Gas  Nuclear Power plants are 1st tier base load generation which means they are the 24/7 base  Oil-fired generation is completely uncompetitive under any circumstances  Even during the 2008 crisis, $40 oil, similar to 2015 prices, was 7x more expensive than uraniu

  7. Slide 7: Uranium Price History

    Uranium Price History Source: Ux Consulting 7

  8. Slide 8: Nuclear Power Generation Pre-Fukushima & Today

    Nuclear Power Generation Pre-Fukushima & Today Currently 437 Reactors are operable in 30 different countries Legend Pre-Fukushima Post-Fukushima 58 69 152 183 58442 71 436 152 437 Reactors Under Reactors on Order Reactors Construction or Planned Operable As of February 2015 Source: International Ato

  9. Slide 9: Post-Fukushima - Uranium Sector Still Faces Supply/Demand Imbalance

    Post-Fukushima - Uranium Sector Still Faces Supply/Demand Imbalance 300 250 200 Million Lbs U3O8 150 Likely Additions Existing Mine Supply Demand 100 50 0 Source: WNA, Ux Consulting 9

  10. Slide 10: HEU Expired November 2013

    HEU Expired November 2013  US-Russian HEU Agreement  HEU supplied 13% of  Current cost of down- expired November 2013; world or 45% of US annual blending HEU exceeds new Russia has no desire to uranium needs mine production costs extend agreement The HEU agreement supplied ~24 M lbs. uranium/yr S

  11. Slide 11: New Production Requires Higher Prices

    New Production Requires Higher Prices Post Fukushima analysts estimate this as the incentive price for $83/lb. development of new conventional projects Of global mine supply comes from 56% higher cost conventional mining 11

  12. Slide 12: Dependence On Foreign Uranium by the World's Largest Electricity Consumers

    Dependence On Foreign Uranium by the World’s Largest Electricity Consumers  The U.S. is the world`s largest  China consumes 19 M pounds uranium consumer with demand per year, forecasted to grow to over 50 million pounds per year, 73 M by 2030, but only produces but only produces about 4.7 M 4 M po

  13. Slide 13: Most Global Production has elevated Geopolitical Risks

    Most Global Production has elevated Geopolitical Risks China Malawi Other 4.3% Kazakhstan 2.6% 1.9% 36.0% U.S. 2.7% Uzbekistan 4.1% Russia 4.9% Production from Kazakhstan, Niger, Namibia Namibia, Russia, Uzbekistan, Malawi 7.7% and “Other” countries total about 2/3 of global production Niger 8.0% Au

  14. Slide 14: Supply Disruptions

    Supply Disruptions Single Largest Global Production Geopolitical Risk Source of Cutbacks Secondary Supply Ends Producers in all regions have Probability of Russian sanctions Supply from High Enriched responded to depressed prices impacting uranium supplies to the U Uranium blended down to reactor by

  15. Slide 15: Market Drivers – Return to Stronger Fundamentals

    Market Drivers – Return to Stronger Fundamentals  US Utilities are returning to the spot, medium and long term markets  4 year bear market has taken a toll on production levels with less supplies overhanging market  Approved restart of four reactors in Japan  Geopolitical developments – increase

  16. Slide 16: UEC at a Glance

    UEC at a Glance Uranium Energy Corp Fukushima Events Current Working ~$7.5M* Capital Share 92 M 5.0 M 11.1 M 108 M Structure Outstanding Warrants + Options** Fully Diluted Recent $1.58 744,655 Activity Price as of 03/11/15 Avg. Daily Vol. (3-mo) $154.5 M Enterprise $142 M $20 M*** Enterprise Analyst

  17. Slide 17: Our Team

    Our Team Amir Adnani Robert Underdown Mark Katsumata President, CEO, Director VP of Production Chief Financial Officer An entrepreneur, founding CEO of UEC, Has held senior operational positions 15 years experience as CFO and VP founder and Chairman of Brazil Resources at ISR uranium mines in Texas

  18. Slide 18: Project Portfolio Includes ISR + Conventional Uranium Projects Across The Americas

    Project Portfolio Includes ISR + Conventional Uranium Projects Across The Americas US Project Paraguay Portfolio Project Portfolio 18

  19. Slide 19: UEC's Project Portfolio

    UEC’s Project Portfolio Texas Hub & Spoke 18.3* M lbs. US Pipeline Project/ Historic Resources Project/ Historic Resources Stage Stage Operator M lbs. Operator M lbs. Palangana/ Union Anderson/ (P) 2.2* (D) 29* Carbide Urangesellschaft Goliad/ Moore Los Cuatros/ Teck (NT) 6.9* (E) 12 Energy Corp Bur

  20. Slide 20: Exploration Databases Drive Resource Expansion

    Exploration Databases Drive Resource Expansion  14 Databases of historical exploration and  Including over 70,000 drill holes that span development data from senior companies well known uranium rich districts in North including Kerr-McGee, Continental Oil America and abroad (Conoco Phillips), Mobi

  21. Slide 21: Conventional mining vs in-situ recovery

    Conventional open-pit or underground mining, shown below, accounts for most global uranium production. However, new projects require incentive prices stably above $80 per pound In-situ recovery of uranium, shown above, accounts for 1/3 of global production – with capital and operating expenses in th

  22. Slide 22: Hub & Spoke Production Strategy

    Hub & Spoke Production Strategy 22

  23. Slide 23: Hobson is fully licensed and permitted

    Hobson is fully licensed and permitted. The Processing Plant has a 2M lb. / year physical capacity 23

  24. Slide 24: Zero Emission vacuum dryer at Hobson Processing Plant

    Zero Emission vacuum dryer at Hobson Processing Plant Yellowcake processed at Hobson from Palangana ISR Mine 24

  25. Slide 25: Palangana ISR Mine First Producing Mine

    Palangana ISR Mine First Producing Mine $10 M Production Commenced Initial CAPEX January 2011 $22.8 M Cumulative sales to October 31, 2013 at an average sale Revenue price of $46.50/lb. with a Generated cash cost of sales of $21.77 6 Months Initial Construction Timeline 25

  26. Slide 26: Palangana Production Area (PA-1)

    Palangana Production Area 1 (PA-1) Palangana Ion Exchange Facility 26

  27. Slide 27: Resin Hauling Truck And Trailer

    Resin Hauling Truck And Trailer 27

  28. Slide 28: Goliad ISR Project Next In Line For Production

    Goliad ISR Project Next In Line For Production  Fully licensed and permitted  NI 43-101 compliant resource:  Measured & Indicated Resource: 5,475,200 lbs. at an avg. grade of 0.05%  Inferred Resource: 1,547,500 lbs. at an avg. grade of 0.05% 28

  29. Slide 29: Burke Hollow ISR Project Growth Ahead

    Burke Hollow ISR Project Growth Ahead  Recently reported a 77% increase in estimated uranium resource to 5.12 million pounds at an average grade of 0.09%  Discovery and delineation of higher grade zones has doubled uranium grade  Discovery of five trends since 2012, resulting from 526 exploration

  30. Slide 30: Longhorn ISR Project

    Longhorn ISR Project Existing aquifer exemption Permitting covers entire project area, Advantage greatly expedites regulatory process Historic production 30 M lbs. Live Oak County Produced within project’s 13 M lbs. George West District Project located ~45 miles Hub and from Hobson Processing Spoke

  31. Slide 31: Anderson Project US Project Portfolio Highlight

    Anderson Project US Project Portfolio Highlight NI 43-101 compliant resource:  Measured & Indicated Resource: 17 M lbs. avg. A Large US grade of 0.029% Resource  Inferred Resource: 12 M lbs. with avg. grade of 0.046% 9,852 Acres Project located ~75 miles northwest of Phoenix, AZ Historic Between 1

  32. Slide 32: Anderson Project Preliminary Economic Assessment

    Anderson Project Preliminary Economic Assessment Projected post-tax IRR of 50% and an NPV of Overview $101.1 million, based on a uranium price of $65 per pound  CAPEX is estimated at $9 million for pre-production Low costs and $43.9 million for initial capital CAPEX / OPEX  Average life of mine di

  33. Slide 33: Slick Rock Project US Project Portfolio Highlight

    Slick Rock Project US Project Portfolio Highlight NI 43-101 compliant resource:  Inferred Resource: 11.6 M lbs. avg. grade of 11.6 M lbs. 0.228%  Inferred Resource: 69.6 M lbs. vanadium with avg. grade of 1.37%  33% pre- tax Internal Rate of Return  $43.8 million pre-tax Net Present Value, at a

  34. Slide 34: Overview of the historic Slick Rock mine workings

    Overview of the historic Slick Rock mine workings Member of technical team collecting a rock sample 34

  35. Slide 35: Expanding The Project Pipeline New ISR District Opportunity In Paraguay

    Expanding The Project Pipeline New ISR District Opportunity In Paraguay Project Historic Operator Stage Resource (M lbs.) Exploration / Yuty Cue Resources 11.1* Development Project Historic Operator Stage Exploration Target (M lbs.) Oviedo Anschutz Corp Exploration 23-56* * NI 43-101 Technical Repor

  36. Slide 36: Paraguay — A Frontier ISR Opportunity

    Paraguay — A Frontier ISR Opportunity 500 Direct Foreign Investment  Government policy Millions US$ focused on attracting foreign direct 400 investment  Low corporate tax rate 300 of 10% and 2.5% royalty on uranium* 200  Produces the world’s highest per-capita surplus of electricity 100 *Ernst &

  37. Slide 37: Yuty ISR Project Paraguay

    Yuty ISR Project Paraguay • NI 43-101 Measured Resource: 2.8 M lbs. at an average grade of 0.062% • NI 43-101 Indicated Resource: 6.1 M lbs. at an 11.1 M lbs. average grade of 0.048% • NI 43-101 Inferred Resource: 2.2 M lbs. at an average grade of 0.047% 500,000 Acres Concession with 95% left unexpl

  38. Slide 38: Oviedo ISR Project Paraguay

    Oviedo ISR Project Paraguay 23-56 M lbs. NI 43-101 Exploration Target for U3O8 Concession located in the area of Coronel 500,000 Acres Oviedo, Paraguay Subject to uranium exploration by The Previously Explored Anschutz Corporation (1976-1983) and Crescent Resources (2006-2008) Determined to be ISR-a

  39. Slide 39: Investment Summary

    Investment Summary  Proof of Concept  Over three year track record as America’s emerging in-situ recovery (ISR) uranium producer  Proven record of developing projects through to low-cost production  Large Portfolio of Advanced, Development and Exploration Uranium Projects  Infrastructure advant

  40. Slide 40: Uranium Energy Corp

    URANIUM ENERGY CORP Toll Free: (866) 748-1030 info@uraniumenergy.com www.uraniumenergy.com Corporate Office 500 North Shoreline Ste. 800N Corpus Christi, TX 78401 Tel: (361) 888-8235 Fax: (361) 888-5041 Investor Relations: Bruce J. Nicholson Mehran Bagherzadeh President and CEO: Amir Adnani