Jsw Steel Limited · NSE:JSWSTEEL

Jsw Steel — Corporate Update (March 2022)

41 slides from Jsw Steel's corporate update, March 2022

  1. Slide 1: Vijayanagar Works Site Visit

    Vijayanagar Works Site Visit March 2022

  2. Slide 2: Forward Looking and Cautionary Statement

    Forward Looking and Cautionary Statement Certain statements in this report concerning our future growth prospects are forward looking statements, which involve a number of risks, and uncertainties that could cause actual results to differ materially from those in such forward looking statements. The

  3. Slide 3: Agenda

    Agenda Overview of Vijayanagar Plant Logistics Sustainability R&D and Technical Expertise Digitalisation JSW Steel Vijayanagar Works Site Visit: March 2022 3

  4. Slide 4: Vijayanagar in 1994

    Vijayanagar in 1994 • Barren Land • Inadequate Water Supply, No Electricity • Poor Infrastructure, Road And Rail Connectivity • Non Availability Of Coking Coal & Quality Iron Ore • Lack of skilled people to Build / Operate JSW Steel Vijayanagar Works Site Visit: March 2022 4

  5. Slide 5: JSW Vijayanagar Today

    JSW Vijayanagar Today • Production Capacity : 12 MTPA • No of Trees Planted : 1.8 million • Plant Area : 7,800 Acres JSW Steel Vijayanagar Works Site Visit: March 2022 5

  6. Slide 6: JSW Vijayanagar – Flagship Plant of JSW Steel

    JSW Vijayanagar – Flagship Plant of JSW Steel In million tons Vijayanagar Steel Works – One of India’s Largest: Capacity growth CAGR of 18% since 1999 Integrated Steel Plant & Steel Exporter 19.5 12 10 6.8 2.5 3.8 0.8 1.6 1999 2001 2004 2006 2009 2011 2016 2025 JSW Steel Vijayanagar Works Site Visit

  7. Slide 7: Vijayanagar's Manufacturing Value Chain

    Vijayanagar’s Manufacturing Value Chain Raw Material Processing Steel Making Finished Products Iron Ore HOT ROLLED Products – ~50% Sinter HRPO, (12.95 MTPA) (9.0 MTPA) HR Plates, FLAT Products 67% HR Coils BOF (11.0 MTPA) SLABS EAF (1.5 MTPA) COLD ROLLED Products – ~50% ZPF (1.5 MTPA) Galvalume (GL)

  8. Slide 8: Wide Range of Products

    Wide Range of Products Hot Rolled Coils HR Plates / Sheets Wire Rods CRNO CRCA TMT Bars Note: CRNO: Cold Rolled Non-Oriented Coil, CRCA: Cold Rolled Close Annealed, TMT: Thermo Mechanically Treated JSW Steel Vijayanagar Works Site Visit: March 2022 8

  9. Slide 9: Applications – Flat and Long Products

    Applications – Flat and Long Products Flat Products Long Products Line Pipe Tin Plate Home Appliances Bolt , Nut Free Cutting steel Construction Electrode steel AC Motor Pipe Commercial Vehicles Bridges / Power Plant Medium Carbon Wire Structural Earth Movers Passenger Vehicles JSW Steel Vijayanagar

  10. Slide 10: JSW Vijayanagar – 5 MTPA Brownfield Expansion

    JSW Vijayanagar – 5 MTPA Brownfield Expansion Steel Melting Shop – 2 X 350 T Converter Hot Strip Mill- 5.00 MTPA Blast furnace - 4.50 MTPA Lime Plant Project Schedule 36 months Zero date April 2021 Sinter Plant – 5.75 MTPA Target date March 2024 Lime Plant JSW Steel Vijayanagar Works Site Visit: Mar

  11. Slide 11: Agenda

    Agenda Overview of Vijayanagar Plant Logistics Sustainability R&D and Technical Expertise Digitalisation JSW Steel Vijayanagar Works Site Visit: March 2022 11

  12. Slide 12: Logistics at Vijayanagar Works

    Logistics at Vijayanagar Works 47 MTPA Inward & Outward Movement 6 Imports & Export Iron Ore & Fluxes Steel Dispatches via Ports • Over 38+ • Goa 25 Destinations by • Ennore • Domestic Sources Rail across India • Mangalore • Imports • Chennai • Road dispatches 13 • Krishnapatnam @ 10,000 mt/day MTPA

  13. Slide 13: Iron Ore – Captive Mines around Vijayanagar Works

    Iron Ore – Captive Mines around Vijayanagar Works Mines Dispatch (%) Karnataka Iron Ore Reserves FY21 (MT) Modes of Transport Tunga iron ore mine 6.94 Nandi iron ore mine 10.03 Pipe Conveyor Devadari iron ore mine 28.62 56% 50% Bhadra iron ore mine 33.89 63% 78% Rail Rama iron ore mine 31.53 6% Ubul

  14. Slide 14: Rail Network within Vijayanagar: 194 kms

    Rail Network within Vijayanagar: 194 kms GOA DAROJI CHENNAI CRM-02 CEMENT YARD NORTH YARD OUT WRM/BRM-01 BRM-2 HSM-01 TRACK HOPPER HOT METAL YARD IN RECEIPT YARD-1 Track Length - 194 KM Rail Loading Yard ( Steel ) - 8 MINE HEADS Particulars Rail Loading Yard (Slag) - 3 Rail unloading Yard ( RM ) - 3

  15. Slide 15: Logistics Facilities

    Logistics Facilities Raw Material Receipt Yard Movement with Signaling & Telecommunication Special Purpose Vehicles for CR Finished Goods Dispatch Rail Cold Rolling Mills Dispatch Loco Fleet JSW Steel Vijayanagar Works Site Visit: March 2022 15

  16. Slide 16: Bogie Freight pNeumatic Versatile (BFNV) Rakes Induction

    Bogie Freight pNeumatic Versatile (BFNV) Rakes Induction International Standard Wagon for Steel Transportation • Higher throughput of 4,000t (68.5t per wagon) • Ease of loading & unloading • Damage protection to HR & CR Coils • Step towards Carbon emission reduction JSW Steel Vijayanagar Works Site

  17. Slide 17: Agenda

    Agenda Vijayanagar Overview Logistics Sustainability R&D and Technical Expertise Digitalisation JSW Steel Vijayanagar Works Site Visit: March 2022 17

  18. Slide 18: Sustainability Framework and Priorities

    Sustainability Framework and Priorities 17 Focus Areas Governance & Oversight By Board-level Business Responsibility And Climate Change: Biodiversity: No Net Loss for Biodiversity Sustainability Committee • Aligned to India’s Nationally Determined Contributions for Climate Change as per Mr. Malay Mu

  19. Slide 19: Health & Safety

    Health & Safety JSW is committed to providing a safe and healthy working environment and achieving an injury & occupational illness free work place. Our vision is to achieve ‘Zero Harm’ Building a Culture of Health & Safety • JSW has created a robust governance • Specially curated e-learning modules

  20. Slide 20: Climate Change Mitigation

    Climate Change Mitigation Derivation of carbon emission target for 2030 Planned/ Potential initiatives to reduce CO2 intensity • The Sustainable Development Scenario (SDS) (a) requires direct Energy Transition from thermal to Renewable in steel making emission intensity of crude steel production in

  21. Slide 21: Pipe Conveyor: Innovative Solution for Transportation

    Pipe Conveyor: Innovative Solution for Transportation • Environment friendly, safe and cost effective • Reduced vehicle movement and pollution, • Improved Safety • CO2 reduction by 3.86 kgs/ton of ore transported 1st First steel plant in India to have raw material supply through pipe conveyor JSW St

  22. Slide 22: Green Belt and Biodiversity

    Green Belt and Biodiversity Vijayanagar in 1994 • Planted 1.8 million trees over 2,250 acres and plan to enhance the plantation to 2.4 million • Greenery developed in 432 acre of degraded forest land adjacent to JSW Steel Complex in association with Karnataka State Forest Department • Plan to develo

  23. Slide 23: Delivering Sustainability With Our Value Added Products

    Delivering Sustainability With Our Value Added Products Electrical Steel • Cold Rolled Non-Grain Oriented: Manufacturing with technology from JFE Japan • Largest product range in India, catering to all domestic applications, and substituting imports • Used in electricity generation as well as consum

  24. Slide 24: Environmental Initiatives- Unique Facilities

    Environmental Initiatives- Unique Facilities Solid waste management • Use of slag to produce sand for use in construction activities like road making. This slag is an eco friendly alternative of natural river sand. Mass production units with a capacity of producing 3,000t/day of sand • Slime recover

  25. Slide 25: Environmental Initiatives- Unique Facilities

    Environmental Initiatives- Unique Facilities Waste Water Management • Membrane bio-reactor is a technology which recycles sewage water into useful water • Technologies like Zero Liquid Discharge (ZLD) and ceramembrane makes our production units zero discharge and water efficient Membrane Bio Reactor

  26. Slide 26: Community Development

    Community Development Health & Nutrition Water & Environment Education & Learning • 50,000+ Citizens – Mobile • 69.34 Lakh Liter Water • 7,000+ children ASPIRE Health Unit Storage Project • 15,000+ Citizens – Eye • 2 Lakes restored (1 Under • 9,000+ Children provided Screened process) training in En

  27. Slide 27: Hampi Restoration

    Hampi Restoration • The Hampi project that was set up by JSW in 2000 has been conferred the UNESCO-Asia Pacific Award for Merit for Cultural Heritage Conservation. • Chandramouleshwara Temple has been recognized by UNESCO-Asia Pacific with an Award of Merit for Cultural Heritage Conservation (2012)

  28. Slide 28: Inspire Institute of Sports - Overview

    Inspire Institute of Sports - Overview JSW Group wins the Best Corporate for Promotion of Sports by Sportstar Judo Boxing Athletics Home of 5 Olympic Sports Football Swimming Wrestling • Home to athletes across 5 Olympic sports • First of its kind in the country • Houses over 200 athletes and also s

  29. Slide 29: Agenda

    Agenda Overview of Vijayanagar Plant Logistics Sustainability R&D and Technical Expertise Digitalisation JSW Steel Vijayanagar Works Site Visit: March 2022 29

  30. Slide 30: Research Groups in JSW Steel R&D Centre Vijayanagar

    Research Groups in JSW Steel R&D Centre Vijayanagar Beneficiation Utilizing Non Coking Coals Raw Materials Coal and Coke Waste Iron Making Slag, Dust and Sludge Utilization Process Modeling Mills & Product Steel Development Making Value Added Products Clean Steel Making JSW Steel Vijayanagar Works S

  31. Slide 31: Technical Expertise

    Technical Expertise Beneficiation of Low grade ores • Technology for BHQ and BHQ • 17 patents and 32 papers Development of Niche • High strength Steels > 1,000 Mpa, API X-80 Products • 42 patents and 15 papers • Full scale units working Converting slags into products • Commercialized slag products,

  32. Slide 32: Slag Sand

    Slag Sand Slag Sand preparation First unit at Time in JSW Vijayanagar Works World Slag Granulation Vertical Shaft Impactor First of its kind in the country JSW Steel Vijayanagar Works Site Visit: March 2022 32

  33. Slide 33: Iron and Steel Slag Based Road Cube Testing

    Iron and Steel Slag Based Road Development of design mix for concrete roads with steel slag Cube Testing First Time in 2 km road has been constructed for technology demonstration in association with Karnataka PWD department Country JSW Steel Vijayanagar Works Site Visit: March 2022 33

  34. Slide 34: Dry Slag Granulation

    Dry Slag Granulation Dry slag granulation is the future technology of granulation developed jointly with Ecomaister - Under Implementation Technology Wet granulation Dry granulation First Medium Water Air Time in Water 0.6 – 0.7 Nm3/T 0.1 – 0.2 Nm3/T World Consumption Operational cost 1 0.75 Capital

  35. Slide 35: Plastic Injection in EAF

    Plastic Injection in EAF National Energy Efficiency Innovation Award 2021 Partial replacement of coke First of its kind in India developed fines by shredded plastic fully in-house at JSW Projected recycling capacity: Abating 997 ton of 3 TPD CO2/annum JSW Steel Vijayanagar Works Site Visit: March 20

  36. Slide 36: Collaborations for R&D Work

    Collaborations for R&D Work Indian Indian Indian Indian National Indian Institute of Institute of Institute of Institute of Institute of Agriculture Science, Technology, Technology, Technology, Technology, Research Bangalore Madras Bombay Roorkee Surathkal Institute, New Delhi National Research CSIR

  37. Slide 37: Agenda

    Agenda Overview of Vijayanagar Plant Logistics Sustainability R&D and Technical Expertise Digitalisation JSW Steel Vijayanagar Works Site Visit: March 2022 37

  38. Slide 38: FY22: Achievements

    FY22: Achievements Vijayanagar • Cloud based Condition Monitoring System implemented in Iron and Mills • Digital Project Management System (DPMS) portal developed in-house to track all digital projects • 385 Digital Kaizens completed • Coke Ovens: Auto-positioning of battery cars Iron zone • Coke Ov

  39. Slide 39: Key Digital Projects – FY22

    Key Digital Projects – FY22 CRM-2: Dross cleaning robot for human safety SMS : Flare stack thermal imaging (safety) JSW Steel Vijayanagar Works Site Visit: March 2022 39

  40. Slide 40: Digitalisation of Logistics

    Digitalisation of Logistics Industry 4.0 – Vijayanagar Logistics: IOT Based Cyber Signalling: • Reduced Loco TAT – as manual operation is eliminated • Data analytics to arrive at business decisions • Less Capital cost compared to SSI (Solid state interlocking) • No separate building required for Rel

  41. Slide 41: Investor Relations Contact

    Investor Relations Contact: ir.jswsteel@jsw.in JSW Steel Vijayanagar Works Site Visit: March 2022 41

JSW Steel — Corporate Update (March 2022) on 6ix