  1. Slide 1: Project: 33kV Substation Refurbishment Customer: NEEPCO

    Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh

  2. Slide 2: Project Site

    = __ranga hydroelectric project arunc 4 Loak Sippi 9 ° Daporijo Koloriang ° fe ais 6 2 New Palin tif ‘Simen Chapori ‘6 “is Zi Dher Fee si jarh Tinsuki “ey Ranganadi eH 7 a es 7 —e HEP. bs 4 ry Naharkatia _North 7 A ee f / Itanagar Majuli t LD us” al ern ne range hycroelectrc project aun |. Ad Yazali

  3. Slide 3: Project Scope Site Assessment & MOM

    Project Scope Site Assessment & MOM Key Challenges • Remote Site • Old Installation • Close co-ordination among S&S, Vingiri & NEEPCO • Technical Requirement Agreement on performance improvement targeted before detailed engineering • Schedule of execution

  4. Slide 4: Key Contacts

    Key Contacts Site Contact : NEEPCO Mr.Mohan lal kumhar, Sr. Manager(E/M)US &W, Mob.No:09436225093/08730946725 Vingiri Powertech Pvt Ltd S&S Vingiri NEEPCO Mr.K.A.Singh , • Engineering, • Erection, • End Mob.No:09433229494. Manufacturing Commissioning requirement & Supply and Testing specification S&

  5. Slide 5: Project: Engineering, Manufacturing & Supply Portion Proposal Value

    Project: Engineering, Manufacturing & Supply Portion Proposal Value Engineering Charge : Field Visit and Scoping 0.5L : Detailed Engineering 1.0L : As Build Drawing Charge 0.5 L : Site Supervision of Testing 1.0 L : Project Management 0.5L Supply 32.7 L Total proposal 36.2 L

  6. Slide 6: NEEPCO Hydro Powerstation – SLD

    NEEPCO HYDRO POWERSTATION – SLD

  7. Slide 7: Opportunity Size (Qty)

    OPPORTUNITY SIZE (Qty) Sl.No Qty DESCRIPTION 1 33kV, 1250A, 25kA/3SEC PCVCB with Local Control 1 Panels & PT, CT’S 2 33 kV, 1250A DISCONNECTOR (MGB Type ) 5 3 Remote Control panels for Breaker and Isolator (with 1 single panels) 4 Suitable control unit panels for 11kV SF6 (24V DC ) with 11 PT ‘S

  8. Slide 8: Replacement of Existing SF6 with New OFVP36

    REPLACEMENT OF EXISTING SF6 WITH NEW OFVP36 OLD SF6 S&S OFVp36

  9. Slide 9: Replacement of Existing 33kV Disconnector with New 33kV Disconnector

    REPLACEMENT OF EXISTING 33kV DISCONNECTOR WITH NEW 33kV DISCONNECTOR OLD DISCONNECTOR S&S DISCONNECTOR

  10. Slide 10: Replacement of Existing Indoor Control Unit Panel with New Panels

    REPLACEMENT OF EXISTING INDOOR CONTROL UNIT PANEL WITH NEW INDOOR CONTROL UNIT PANELS OLD INDOOR CONTROL S&S INDOOR CONTROL UNIT PANELS UNIT PANELS

  11. Slide 11: Integrated Remote Control Cubicle for 33kV VCB Disconnector

    INTEGRATED REMOTE CONTROL CUBILE FOR 33kV VCB DISCONNECTOR NEW INTEGRATED REMOTE OLD REMOTE PANEL PANEL

  12. Slide 12: NEEPCO BOM

    NEEPCO BOM PLEASE REFER- SECTION - I

  13. Slide 13: Planning Schedule (NEEPCO)

    PLANNING SCHEDULE ( NEEPCO ) Dispatch Erection and Site visit, Drawing Testing and preparation & Commissioning clarification ( Load test ) FEB MAR MAY JUL Drawing , QAP Approval and Manufacturing , Internal Inspection. Customer Inspection

  14. Slide 14: Division of Responsibility

    DIVISION OF RESPONSIBILITY Sl.No Tasks S&S VINGIRI Site Visit for assessment of Existing Site 1 location a฀ a฀ 2 Preparation of site visit report a฀ a฀ 3 Discussion on needed with NEEPCO a฀ a฀ Revision of proposal the in line with 4 discussion a฀ a฀ 5 Firming up technical requirement a฀ X 6 Preparin

  15. Slide 15: Division of Responsibility (continued)

    Sl.No Tasks S&S VINGIRI 11 Negotiation a฀ X Finalization of contract between vingiri and 12 NEEPCO. X a฀ Scope of supply in line with Offer & PO to 13 S&S. a฀ a฀ 14 S&S contract review and kick off meeting. a฀ a฀ 15 Customer engineering a฀ X 16 Drawing submission though vingiri. a฀ a฀ 17 Drg Approva

  16. Slide 16: Division of Responsibility (continued)

    Sl.No Tasks S&S VINGIRI 21 Starting of materials finalization a฀ X 22 Design confirmation check. a฀ X 23 Manufacturing Quality check. a฀ X 24 Customer Inspection X a฀ 25 Internal Acceptance a฀ a฀ 26 Customer FAT & Training. a฀ X 27 Obtaining dispatch clearance a฀ a฀ 28 Obtaining payment. a฀ a฀ 29 Ef

  17. Slide 17: Division of Responsibility (continued)

    Sl.No Tasks S&S VINGIRI 31 Safe storage a฀ a฀ 32 Packing a฀ a฀ X 33 Erection and commissioning. ฀ a฀ 34 Refurbishment / Replacement of items. X a฀ 35 Completion. a฀ a฀ 36 Site Acceptance a฀ a฀

  18. Slide 18: Old SF6 vs New Vacuum Breaker

    OLD SF6 VS NEW VACUUM BREAKER

  19. Slide 19: Minutes of Meeting – at MMF

    sas SWITCHGEAR LIMITED MINUTES OF MEETING Between NEEPCO (NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED) AND S&S POWER SWITCHGEAR LIMITED (On 05-01-2017, Thursday at SSPSL's MMF Facility «t MM Nanar, Chennat MEEPCO Represented by Mr MA Mssemtear, Se Manager, F/M, And S&S Power Switchaear represen

  20. Slide 20: Minutes of Meeting – at NEEPCO

    MINUTES OF MEETING – AT NEEPCO