Slide 1: Advancing the Filo del Sol Copper-Gold-Silver Project in South America
A Lundin Group Company Advancing the Filo del Sol Copper-Gold-Silver Project in South America Corporate Presentation December 2019 TSX-V: FIL Nasdaq First North Growth Market: FIL www.filo-mining.com
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking information”). The forward-looking informatio
Slide 3: Filo Mining Corp. Company Profile
FILO MINING CORP. COMPANY PROFILE ¾ South American Advanced Exploration Company ¾ Project – Filo de Sol (100% interest) ¾ Current Indicated Resource of: 4.4m Ounces of Gold / 147m Ounces of Silver / 3.1b Pounds of Copper ¾ Lundin Group Company Capital Structure Share Ownership Board & FIL TSX-V, Nas
Slide 4: Filo del Sol Project
FILO DEL SOL PROJECT ¾Located in San Juan, Argentina & Chile ¾ Pro-mining jurisdictions ¾ Mining Integration and Complementation Treaty for cross-border projects ¾Positive PFS Released January 2019 ¾ Heap Leach – oxides only ¾ Nearby water source identified ¾Successful 2018/19 drill campaign ¾ Conti
Slide 5: Exploration
EXPLORATION 5
Slide 6: 2019 / 2020 Field Program Plans
2019 / 2020 FIELD PROGRAM PLANS Plans • Over ~10,000m of diamond drilling planned and kicked-off in November 2019 • Drone magnetometer & 3D induced polarization ("IP") geophysical surveys Targets • Filo Deep Area • Three holes underway & testing massive sulphide potential • Temberias West • Testing
Slide 7: 2019 / 2020 Initial Drill Targets
2019 / 2020 INITIAL DRILL TARGETS Initial holes as follows: • FSDH032: targeting sulphide • FSDH034: targeting sulphide under VRC089 (last 70m @ under FSDH028 (last 68m @ 0.62 Cu%, 0.81 g/t Au) 0.61 Cu%, 0.68 g/t Au) • FSDH033: targeting sulphide • FSDH035: targeting new under FSDH030 (last 72m @ Ta
Slide 8: Potential to Extend Resource
POTENTIAL TO EXTEND RESOURCE HOLE 25 TO VRC093 IS 3KM AND REPRESENTS AN UNTESTED TARGET AT DEPTH ¾ Successful 2018/19 drill campaign extended depth of mineralization to 1,025m ¾ Resource remains open North to South and at depth 0 1000m • Continuous mineralization - Potential strike length could incr
Slide 9: 2018/2019 Drilling Results
2018/2019 DRILLING RESULTS See News Release dated March 18, 2019 entitled “Filo Mining Drills 1,025 Metres of See News Release dated May 17, 2019 entitled “Filo Mining Drill 548 Metres of 0.30% Copper and 0.22 g/t Gold at Filo del Sol – Demonstrating the Presence of a 0.40% Copper and 0.78 G/T Gold
Slide 10: Indicated and Inferred Resource
INDICATED AND INFERRED RESOURCE Cu Ag 146.9 3.1 Million oz Billion lbs (indicated) (indicated) Au 4.4 Cu Million oz Ag 1.0 (indicated) 34.8 Billion lbs Million oz (Inferred) (inferred) Au 1.8 Million oz (inferred) Refer to slide 6 for additional details regarding the reporting of the Filo del Sol re
Slide 11: Mineral Resource
MINERAL RESOURCE Notes to accompany Filo del Sol Mineral Resource table: 1. Mineral Resources have an effective date of 11 July 2018; 2. The Qualified Person for the resource estimate is James N. Gray, P.Geo. of Advantage Geoservices Ltd.; 3. The Mineral Resources were estimated in accordance with t
Slide 12: Positive PFS - January 2019
POSITIVE PFS - January 2019 12
Slide 13: Filo del Sol – PFS Results Summary
FILO DEL SOL – PFS RESULTS SUMMARY 23% AFTER-TAX IRR $1.28B $1.23/lb AFTER-TAX CuEq NPV (8%) C1 CASH COST 3.4 yrs PAYBACK 8,653 67 kt Avg. Annual koz Cu Production Avg. Annual Ag Production 159 koz Avg. Annual Au Production 13
Slide 14: Pre-Feasibility Results
PRE-FEASIBILITY RESULTS FILO DEL SOL – PFS RESULTS – January 2019 PFS Metals Prices Assumed Pre-Tax NPV (8%) ($B) $1.86 • $3.00/lb Cu Pre-Tax IRR (%) 27% • $1,300/oz Au • $20/oz Ag After-Tax NPV (8%) ($B) $1.28 After-Tax IRR (%) 23% Undiscounted After-Tax Cash Flow ($B) $3.23 Annual Metal Production
Slide 15: Next Steps
NEXT STEPS ¾ Execute on 2019/2020 field season ¾ Plan to drill +10,000m, drilling now underway ¾ Ongoing environmental studies and data collection in support of project permitting ¾ Initiate metallurgical testwork on sulphide material 15
Slide 16: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING Adam Lundin, CEO Jamie Beck, President • Appointed as President and CEO in September 2017, • More than 15 years of international project Adam is focused on the future and helping Filo management and corporate developmen
Slide 17: Strong & Reputable Board
STRONG & REPUTABLE BOARD EXPERTISE IN EXPLORATION, PROJECT STUDIES, FINANCING, M&A TRANSACTIONS Lukas Lundin, Chairman (non-executive) Ashley Heppenstall • Successful entrepreneur focused on natural resources. • Lead Director of the Board of Directors of Lundin • Has led numerous companies through s
Slide 18: A Lundin Group Company
A LUNDIN GROUP COMPANY CREATING VALUE FOR SHAREHOLDERS The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% *Year is date of takeov
Slide 19: Probable Mineral Reserves
PROBABLE MINERAL RESERVES Filo del Sol Mineral Reserve Statement (@ 0.01 $/t NVPT cut-off) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.1 0.39 0.33 15.1 25.30 2,226 2,764 126,028 Total
Slide 20: Board and Management
BOARD AND MANAGEMENT For more information contact: Amanda Strong Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filo-mining.com reriksson@rive6.ch Tel: +1 604 689 7842 Tel: +46 (0)8 440 5450 Suite 2000 – 885 West Georgia Street Vancouver, BC Canada V6C3E8 www.filo