Slide 1: 1Q FY27 Result Presentation
rsonal use only NYSE: TBN, ASX: TBN 1Q FY27 Result Presentation ` Executive Officer Mr. Todd Abbott – Managing Director and Chief November 12, 2026
Slide 2: Disclaimer
Disclaimer The information in this presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), which include statements
Slide 3: Investment highlights
Investment highlights Systematically de-risking one of the largest undeveloped gas projects in the world Tamboran’s Investment Case Tamboran’s ~2.8 million prospective acres (net) rsonal use only Basin-scale acreage position Most experienced operator Beetaloo depocenter Largest Beetaloo Basin acreag
Slide 4: Evolution of Beetaloo Basin development
Evolution of Beetaloo Basin development Years of subsurface de-risking underpin disciplined capital allocation to resource delineation Capital disciplined approach to de-risking Tamboran’s Beetaloo Basin development ✓ rsonal use only Evaluate Subsurface and Resource Delineation and Development and C
Slide 5: 1Q FY27 highlights
1Q FY27 highlights Flow results affirm expectation and confirm the deliverability of Velkerri B Shale wells 1Q FY27 key statistics rsonal use only Delivered first gas sales from the Beetaloo Basin 0.31 Bcf Net production to Tamboran(2) (~24.8 MMcf/d average gross daily volume(3)) SS2-3H and -5H well
Slide 6: Well performance
Well performance Confirming low decline and improvement in productivity as wells are cleaned up | SS2-2H ST1 shows material improvement SS2 Well Pad Performance − Well rates confirm positive deliverability in-line with previous testing rsonal use only Stimulated Wellhead IP30 IP30 (Normalized) IP30
Slide 7: Shenandoah South Pilot Project
Shenandoah South Pilot Project Successfully executed infrastructure construction and stimulation activities, achieving first gas sales on time and within budget − Completed construction of the SPCF, forecasted to be ~US$10 million under budget rsonal use only − Targeting completion of commissioning
Slide 8: Balance sheet
Balance sheet Maintain strong balance sheet with ~US$180 million cash(1) and expected near-term inflows 1Q FY27 Change in Cash Balance rsonal use only (10) (58)(2) 15 7(3) 2(4) US$ million 225 180 165 Cash Balance (June Cash Flow from Cash Flow from Proceeds from Debt Other Cash Balance (Sept. Check
Slide 9: Key deliverables and upcoming catalysts
Key deliverables and upcoming catalysts Progressing towards resource delineation across two depocenters during 2027 campaign Key 12-month achievements rsonal use only ✓ FID of the Shenandoah South Pilot Project ✓ Completed acquisition of Falcon Oil & Gas subsidiaries ✓ Farmout of Pilot Area and Beet
Slide 10: Appendix
rsonal use only Appendix
Slide 11: Dominant Beetaloo Basin acreage position
Dominant Beetaloo Basin acreage position Tamboran’s 2.8 million net prospective acreage position is the largest of peers and the only operator to cover two depocenters Gross Net rsonal use only Beetaloo depocenter Permits(1) Prospective Interest Prospective (* Denotes Operator) Acres Acres Northern
Slide 12: Shenandoah South historic results
Shenandoah South historic results IP30 results from Shenandoah South region Shenandoah South well statistics rsonal use only SS-1H SS2-2H ST1 SS2-2H ST1 SS2-3H SS2-5H (2024) (2025) (2026) (2026) (2026) Stimulated Lateral Length (feet) 1,644 5,483 5,483 10,260 10,246 Stages (#) including toe 11 36 36
Slide 13: ASX Listing Rule 5.30 well test disclosures
ASX Listing Rule 5.30 well test disclosures Shenandoah South flow test results for, -2H ST1, -3H and -5H ASX Listing Rule 5.30 requirement SS2-2H ST1 (2025) SS2-2H ST1 (2026) SS2-3H SS2-5H rsonal use only (a) Name and type of well SS2-2H ST1 horizontal well SS2-2H ST1 horizontal well SS2-3H horizont
Slide 14: Glossary
Glossary AEMO Australian Energy Market Operator H&P Helmerich & Payne AGP Amadeus Gas Pipeline IP20 Average production rate over the first 20 days of production APA APA Group (ASX: APA) IP30 Average production rate over the first 30 days of production rsonal use only AUD Australian dollar IP90 Avera