  1. Slide 1: Corporate Presentation November 2013

    TSX: LUN OMX: LUMI Corporate Presentation November 2013

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward forward‐looking looking statements. statements These forward forward‐looking looking statements are not based on historical facts, but rather on current expectations and projections about future eve

  3. Slide 3: Key Asset Overview

    Key Asset Overview • European Operations • Tenke Fungurume • Growth Projects • Neves‐Corvo, Neves Corvo Portugal • Tier 1 Cu/Co asset • Eagle Mine, Mine Michigan (Cu/Zn) • 24% interest • Tenke Expansions • Zinkgruvan, Sweden • Freeport‐McMoRan (Zn/Pb/Cu) operator t • Aguablanca, Spain • Phase II exp

  4. Slide 4: Q3/13 Operational Highlights

    Q3/13 Operational Highlights Overall mine performance during the quarter achieved objectives ƒ Copper Production: d Neves‐Corvo in‐line; better than expected at Aguablanca and Zinkgruvan ƒ Aguablanca grades and recoveries were better than expected, resulting in an increase in both copper and nickel

  5. Slide 5: Q3/13 Operational Highlights

    Q3/13 Operational Highlights ƒ Cash Costs: ƒ Neves‐Corvo N C – guidance id increased i d to account for f higher hi h production d i costs and d lower by‐product metal prices (guidance $1.90/lb Cu from $1.80/lb Cu) ƒ Aguablanca – guidance lowered due to better than expected production (guidance $4.5

  6. Slide 6: Financial Position

    Financial Position ƒ Strong Balance Sheet flexibility As of Sept. 30, 2013 $US M Cash & Equivalents $137 Total Debt $208 Total Net Debt Balance $71 Available Credit Facility Outstanding ~$400 Credit Facility totalling $600M completed in October 2013, for a four year term with rates between LIBOR +2.

  7. Slide 7: Operations and Outlook

    Operations and Outlook 7

  8. Slide 8: Production and Cost Guidance – Q3/2013

    Production and Cost Guidance – Q3/2013 2013 Guidance Tonnes C1 Cost a Copper Neves‐Corvo 50,000 – 55,000 $1.90 Zinkgruvan 3,500 – 4,000 Aguablanca 5,500 – 6,000 Wholly‐owned 59,000 – 65,000 Tenke (@ 24%)b 50,000 $1.24 Total 109,000 – 115,000 Zinc inc Neves‐Corvo Neves Corvo 50,000 – 55,000 Zinkgruva

  9. Slide 9: Capex Guidance – Cost Restraint Implemented

    Capex Guidance – Cost Restraint Implemented Original Revised Guidance Guidance (Q1/13) (Q3/13) $US M $US M Sustaining Neves‐Corvo $70 $65 Zinkgruvan $40 $35 Total Sustaining $110 $100 New Investment Lombador Phase I $30 $25 Neves water dam $9 $5 Zinkgruvan Ore Dressing Plant $13 ‐ Aguablanca wall st

  10. Slide 10: Neves-Corvo

    Neves‐Corvo 10

  11. Slide 11: Neves-Corvo – Q3/13 Results

    Neves‐Corvo – Q3/13 Results • Production of 12.6kt copper & 14.7kt zinc • C1 costs t off $2 $2.23/lb 23/lb C Cu ((nett off b by‐product d t credits) dit ) hi higher h ththan expected • Average copper grades d off 2 2.4% % with i h recovery rate off 8 81% % • Zinc production achieved a new quarterly

  12. Slide 12: Neves-Corvo – Outlook

    Neves‐Corvo – Outlook • Zinc ore mining rates will increase from bulk stopes in upper Lombador o bado co contributing bu g to o aan increased c eased zincc production p oduc o p profile o e • Preliminary investigation into expansion of shaft capacity appears promising and further studies advancing •

  13. Slide 13: Neves-Corvo Production Outlook

    Neves‐Corvo Production Outlook Midpoint of guidance range assumed for 2013 ‐ 2015 13

  14. Slide 14: Zinkgruvan

    2 zi eee nkgruvan a Pape en be~ J 14

  15. Slide 15: Zinkgruvan – Q3/13 Results

    Zinkgruvan – Q3/13 Results • Production of 18.7kt zinc, 8.7kt lead & 1.0kt copper • Zinc i grades d and d production d i volumes l were back b k on trackk and d largely achieved planned levels for the quarter • Cash costs were at the lowest levels since 2007, primarily due to high lead sales for the

  16. Slide 16: Zinkgruvan – Outlook

    Zinkgruvan – Outlook • Interim measures to improve plant availability have accomplished measurable improvements • Capital investment for plant modernization deferred indefinitely 16

  17. Slide 17: Zinkgruvan Production Profile

    Zinkgruvan Production Profile Midpoint of guidance range assumed for 2013 ‐ 2015 17

  18. Slide 18: Aguablanca

    Aguablanca 18

  19. Slide 19: Aguablanca – Q3/13 Results and Outlook

    Aguablanca – Q3/13 Results and Outlook • Produced 1.8kt nickel and 1.5kt copper at cash cost of $3.67/lb Ni; exceedingg expectations p for the quarter q • Significant stockpile of ore is now available ahead of the processing plant as the rainy season approaches • Open pit mining is planned to contin

  20. Slide 20: Tenke Fungurume

    Tenke Fungurume 20

  21. Slide 21: Tenke – Q3/13 Results

    Tenke – Q3/13 Results • Another excellent quarter in mining, milling and copper production • Total production (100%) of 49.5kt Cu and 3.7kt Co @ $1.23/lb Cu • Cash distributions of $38.4 million for the quarter and $110.7 million year‐to‐date • Copper production guidance increased slightly by Freepo

  22. Slide 22: Tenke Outlook

    Tenke Outlook Significant Cash returns Expected to Continue in 2013/2014 • Further expansion investment timing under review by operator Freeport • Addition of second sulphuric acid plant expected p p to be completed p in 2016 • Lundin expects significant cash flows from Tenke to continue, assisting

  23. Slide 23: Eagle Mine

    Eagle Mine 23

  24. Slide 24: Eagle – Status Update

    Eagle – Status Update • Project ramp‐up proceeding well and on schedule • Capital cost forecast to complete maintained at $400M $ (from July 2013) • Mine surface facilities to be commissioned in Q2/2014 • Mill commissioning and first saleable concentrates expected in Q4/2014 24

  25. Slide 25: Eagle – Construction Progress

    Eagle – Construction Progress Mill site facilities Underground mine ramp Mill site facilities Mine site facilities 25

  26. Slide 26: Annual Production Profile

    Annual Production Profile • Average Life of Mine revenue percentage breakdown is as follows1: • 71% Nickel; 23% Copper; pp 3% Platinum, 2% Cobalt, 1% Palladium, 1% Gold 1 Based on price assumptions used in the July 2013 43‐101 Tech Report., which assume long‐term prices of: $9.25/lb Ni, $3.00/lb Cu,

  27. Slide 27: Eagle Reserves & Exploration Upside

    Eagle Reserves & Exploration Upside Eagle Historical Reserves Growth 6 5 onnes Millions of To 4 3 2 2007 2009 2011 2013 27

  28. Slide 28: Key Exploration Targets

    Key Exploration Targets • Eagle East massive sulfide extensions: Possible resource • Feeder Dikes Eagle and Eagle East: Tracing the sources E‐W Long Section N‐S Section A High grade on keel A Looking North Looking West 28

  29. Slide 29: Corporate Overview

    Corporate Overview 29

  30. Slide 30: Good Growth Profile in Copper, Zinc and Nickel

    Good Growth Profile in Copper, Zinc and Nickel Pro Forma Production Profile ‐ Copper Pro Forma Production d Profile f l ‐ Nickel k l Pro Forma Production Profile ‐ Zinc 30 Notes: LUN production profile based on 3‐yr guidance provided in Dec‐2012. Copper profile does not include any future expansions

  31. Slide 31: Lundin Mining - Low-Cost Operations Cu, Zn & Ni

    Lundin Mining ‐ Low‐Cost Operations Cu, Zn & Ni 2013 C1 Copper Cost Curve, Grouped by Mine ($/lb) $3 00 $3.00 $2.50 Neves‐Corvo $2.00 Weighted Average Tenke Fungurume $1.50 As Tenke $1.00 production increases, Lundin $0.50 will move down the cost curve $0.00 ‐‐ 10% 20% 30% 40% 50% 60% 70% 80% 90% 10

  32. Slide 32: Lundin Mining - Summary

    Lundin Mining ‐ Summary Portfolio of high quality, long‐life mines that are performing well Optimization opportunities and exploration potential at all existing assets No high risk major capital projects Proven disciplined growth approach Geographic and base metal diversification Neves‐Corvo Zinkgru

  33. Slide 33: Appendices

    TSX: LUN OMX: LUMI Appendices

  34. Slide 34: Neves-Corvo – Ore Deposits

    Neves‐Corvo – Ore Deposits 34

  35. Slide 35: Zinkgruvan – Ore Deposits

    Zinkgruvan — Ore Deposits Zinkgruvan | Reserves Kariskoga’ @ Orebro CO Resources : Vane BB copper 4 Askersund, C] Mined out ss oS —~1 400 _ 400m — se ee m —_— SVE Sia m. 600m "SA GRAF 35

  36. Slide 36: Eagle - Mine Plan & Design

    _ Eagle -¢Mine Plan & Wine Site Rxtents A ite Sforage Building station Hoot) r lopment Muck Bay #3 oe 024 rieea Passing Bay #2 ust Stack Approx, p Ventilation Fan Muck Bay #4 Approx. Bedrocle Passing Bay #3 ntake/Epress (ism 4) —— Muck Bay #5 Pump Station #2 (310L) 14200 381 1 Muck Bay #6 31800 Pass

  37. Slide 37: Tenke Concession Map

    _ Tenke Eoncession Map Tenke Fungurume Concessions mt Airstrip OS Construction Village Plan Area Waste Dump a. \. Kwatebala Plant Tailings Pond Ve , i ; Kwatebala Pit AS, Mwadinkomba patibanderre arr, H — . - Power Substation YS < |_| Copper Deposits National Road \, 220 KV Power Line Pumpi Deposits