Mitsubishi Heavy Industries, Ltd. · TSE:7011
Mitsubishi Heavy Industries — 10th International Conference on Greenhouse Gas Control Technologies (GHGT-10) 2010
17 slides from Mitsubishi Heavy Industries's conference presentation, Sep 23, 2010

Slide 1: Current Status of MHI CO2 Capture Plant Technology, Large Scale Demonstration Project and Road Map
10th International Conference on Greenhouse Gas Control Technologies Technical Theme; Developments in CO2 capture technology Current Status of MHI CO2 Capture Plant technology, Large Scale Demonstration Project and Road map to Commercialization for Coal Fired Flue Gas Application Takahiko Endo, Yosh

Slide 2: Contents
Contents 1. Introduction 2. Development of MHI’s CO2 Capture Technology – Commercial & R&D Experience 3. Considerations for CO2 Capture from a Coal Fired Boiler 4. High Impurities CO2 Capture Testing from a Coal Fired Boiler 5. Southern Company and MHI 500 tpd Coal Fired CO2 Capture Demonstration Pr

Slide 3: Introduction - World Power Generation Fuel Mix
Introduction - World Power Generation Fuel Mix ¾ Global energy demand expected to increase 40% between 2007 & 2030 ¾ Coal use expected to rise most in absolute terms. ¾ CCS can play a very important role, as a CO2 mitigation strategy. ¾ Early stage deployment of CCS depends on the provision of appro

Slide 4: MHI - Commercial CO2 Capture Plant Experience
MHI - Commercial CO2 Capture Plant Experience World leading LARGE-SCALE post combustion CO2 capture technology licensor, with long term operational experience Largest commercial CO2 capture plant share in the chemical/fertilizer industry 8 commercial CO2 capture plants operating & 1 plant under

Slide 5: Example: MHI Commercial CO2 Capture Plant
Example: MHI Commercial CO2 Capture Plant Urea Production United Arab Emirates Client: Ruwais Fertilizer Industries (FERTIL) CO2 source: Natural gas boiler & steam reformer Start up: December 2009 Capacity: 400 tpd Product: Urea production Process: Improved KM-CDR ProcessTM Solvent: KS-1TM MHI Scope

Slide 6: MHI – Coal Fired R&D Experience
MHI – Coal Fired R&D Experience MHI successful, LONG-TERM coal fired CO2 capture R&D program utilizing pilot and small scale demonstration test plants 1 tpd coal CO2 capture pilot plant at MHI’s R&D Centre, Hiroshima. 10 tpd coal CO2 capture demonstration plant at J-Power’s Matsushima power stat

Slide 7: Coal Fired Flue Gas Considerations
Coal Fired Flue Gas Considerations Coal Fired Flue Gas Impurities depend on coal type and flue gas pre- treatment conditions. The following impurities have to be carefully treated before CO2 capture; ¾SOx (SO2, SO3) ¾NOx (NO, NO2) ¾Dust ¾Hydrocarbons ¾Others (HCl, HF) Accumulation and effects

Slide 8: Design of Plant: High Impurities Testing Program
Design of CO2 Capture Demonstration Plant High Impurities Testing Program ¾ ~5,000 hrs of successful coal fired CO2 capture demonstration testing was followed by a high impurities testing program at the Matsushima CO2 capture plant. ¾ A duct, which bypassed the existing FGD plant was installed. ¾ By

Slide 9: Results of High Impurities Testing Program (1 of 3)
Results of CO2 Capture Demonstration Plant High Impurities Testing Program (1 of 3) 1) Operational stability: • ~1,000 hrs operation under high dust conditions. • Continuous and stable operation was confirmed. • At completion of test, unit internals were thoroughly inspected for fouling, corrosion o

Slide 10: Results of High Impurities Testing Program (2 of 3)
Results of CO2 Capture Demonstration Plant High Impurities Testing Program (2 of 3) 3) CO2 capture capacity: • Capture capacity = 10 tpd as per design base. • 90% of CO2 within the flue gas introduced into CO2 recovery plant is captured. 4) Impact of higher SOx concentration: • Using FGD by pass SOx

Slide 11: Results of High Impurities Testing Program (3 of 3)
Results of CO2 Capture Demonstration Plant High Impurities Testing Program (3 of 3) 5) Impact of higher dust concentration: • Dust concentration increased via FGD by pass (~10mg/Nm3) and direct injection into CO2 capture plant solvent line (100 mg/l in solution). • Dust accumulation within the CO2 c

Slide 12: Southern Company and MHI 500 tpd Coal Fired CO2 Capture Demonstration Project
Southern Company and MHI 500 tpd Coal Fired CO2 Capture Demonstration Project FULLY INTEGRATED carbon capture & storage project with CO2 storage, by SECARB and Owner, in a saline formation at a nearby oil field Location : Alabama Power, James M. Barry Electric Generating Plant Project Partners : Sou

Slide 13: Southern Company CO2 Capture Plant Project: 25 MW Integrated CCS Demo
Southern Company CO2 Capture Plant Project 25 MW Integrated CCS Demo Successful demonstration of the 500 tpd demonstration plant will lead to the provision of COMMERCIAL CO2 recovery plant for coal fired power stations Commercialization Schedule Construction Photograph - Pipe Rack Modules YEAR 09 10

Slide 14: Southern Company Project Demonstration Testing Goals
Southern Company CO2 Capture Plant Project Demonstration Testing Goals Demonstration of ‘Zero Amine Emission System’ Demonstration of ‘Online Solvent Analysing System’ for automatic operational control - features optimum energy conservation Demonstration of ‘Automatic CO2 Capture and Plant Loa

Slide 15: MHI's Commercialization Strategy for Coal Fired Boilers
MHI’s Commercialization Strategy for Coal Fired Boilers MHI’s strategy is in accordance with the IEAs driving principals of having commercial CCS technologies deployable prior to 2020 MHI’s Related Experiences 9Finalised R&D 9Commercial plant deployment 9Long term operational plant experience 9Large

Slide 16: Concluding Remarks
Concluding Remarks ① MHI has the world’s most advanced and comprehensive industrial R&D programs – 20 years of experience has led to the development of energy efficient processes & technologies – reduced CAPEX & OPEX. ② MHI provides the ‘Complete Solution’ - hindered amine solvent KS-1TM with accomp

Slide 17: Thank you, Questions & Further Information
Thank you, Questions & Further Information COME AND MEET THE MHI TEAM AT THE TECHNOLOGY EXHIBIT BOOTH #42
Source: Internet Archive copy of mhi.co.jp
More decks from Mitsubishi Heavy Industries, Ltd.
H1 FY2026 Earnings Presentation28 slides · Nov 6, 2026
Q2 FY2026 Earnings Presentation28 slides · Nov 6, 2026
FY2025 Earnings Presentation36 slides · May 12, 2026
Q3 2026 Earnings Presentation25 slides · Feb 4, 2026
Q2 2026 Earnings Presentation30 slides · Nov 7, 2025
Shareholder Meeting (2012)65 slides · 2012