Harte Gold — Investor Presentation (May 2018)
30 slides from Harte Gold's investor presentation, May 3, 2018
Slide 1: Analyst Presentation
Analyst Presentation GOLD CORP May 3, 2018
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains forward-looking information under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Harte Gold’s development potential and timetable of its opera
Slide 3: Summary
Summary STRICTLY CONFIDENTIAL
Slide 4: Milestones for 2018
MILESTONES FOR 2018 HARTE GOLD HAS DELIVERED ON ALL TARGETS TO-DATE Resource update: tripled resource Comprehensive debt financing package for up to US$70 million PEA: $425 million pre-tax NPV5% at US$1,350/oz, 60% pre-tax IRR1 IBA signed with Pic Mobert First Nation (PMFN) Full permitting
Slide 5: Fully Funded to Production
FULLY FUNDED TO PRODUCTION COMPREHENSIVE FINANCING PACKAGE FOR UP TO US$70 MILLION Sprott Facility Up to US$50 million under a senior secured credit facility Appian Subordinated Loan US$20 million loan, subordinated to Sprott facility Benefits Flexible principal and interest schedule supports r
Slide 6: Phased Mine Plan Increasing to 1,400 tpd
PHASED MINE PLAN INCREASING TO 1,400 TPD PROVIDES EARLY CASH FLOW AND LONGER TERM GROWTH Today Phase 1: 540 tpd Low risk ramp-up to commercial production (2018 - 2019) H2 2018 H2 2019 Phase 2: Existing surface and underground mining infrastructure is sufficient 800 tpd (2020) to support increase
Slide 7: Simple Mine Design
SIMPLE MINE DESIGN CONTINUOUS AND TABULAR ORE BODY SUPPORTS SIMPLE MINE DESIGN AND EXTRACTION Lower Zone Ore Face Sugar Zone Stope Design Length: 50 m 8 Meter Width 15 m level interval (floor to floor) Planned dilution: 11.6% Unplanned dilution factored into the model: 26% Steeply dipping or
Slide 8: Production Profile to +100,000 Oz/Year
PRODUCTION PROFILE TO +100,000 Oz/Year SCALABLE MINE PLAN DESIGNED TO MATCH UNDERGROUND DEVELOPMENT Throughput and Grade 600 10.0 Throughput (ktpa) Grade (g/t Au) 450 7.5 300 5.0 150 2.5 0.0 2018 2020 2022 2024 2026 2028 Phase 1 & 2 (800 tpd) Phase 3 (1,400 tpd) Diluted Head Grade Production Forecas
Slide 9: First Quartile Cash Cost Producer
FIRST QUARTILE CASH COST PRODUCER AISC CASH COST OF US$708/OZ OVER LIFE OF MINE AISC Curve Illustrating Sugar Zone Vs. Other Selected High Grade Canadian Underground Mines Eagle River, Wesdome Sugar Zone, Harte Gold* Macassa, Kirkland Lake $3,000 Island Gold, Alamos Hope Bay, TMAC Hemlo, Barrick $2,
Slide 10: Opportunities to Enhance Project Value
OPPORTUNITIES TO ENHANCE PROJECT VALUE SEVERAL OPPORTUNTIIES NOT CAPTURED IN THE PEA $750 mining mineable dilution, lower resource by mining costs +500,000 ? Pre-Tax NPV5% ($ Millions) $600 ounces ? head grade: 7.0 – 8.0 g/t ? $450 $425 ? ? $344 $300 $150 US$1,250/oz US$1,350/oz Improve Head U
Slide 11: Adding Additional Resource to Mine Plan
ADDING ADDITIONAL RESOURCE TO MINE PLAN 534,000 OUNCES OF MINERAL RESOURCE NOT INCLUDED IN PEA MINE PLAN 0m 250 m 500 m 750 m 1,000 m 11 TSX: HRT
Slide 12: Mine Design – Grade Distribution
MINE DESIGN – GRADE DISTRIBUTION MINE DESIGN ILLUSTRATED BY GRADE Sugar Zone South Ramp Sugar Zone North Ramp Middle Zone Ramp Infill Drilling Underway 12 TSX: HRT
Slide 13: Resource and Mine Plan
Resource and Mine Plan STRICTLY CONFIDENTIAL
Slide 14: Resource Estimate (February 2018)
RESOURCE ESTIMATE (FEBRUARY 2018) 1.5 Moz Au INDICATED AND INFERRED RESOURCE Mineral Resource Estimate at 3.0 g/t Au Cut-Off Resource Modelling Category Grade Contained Zone Tonnes (g/t Au) Au (ounces) Includes drilling up to December 6, 2017 Sugar Zone 2,148,000 8.6 594,700 Indicated Middle Zone
Slide 15: PEA Mineable Resource Estimate
PEA MINEABLE RESOURCE ESTIMATE 934,000 OUNCES OF POTENTIALLY MINEABLE RESOURCE FACTORED INTO PEA MINE PLAN Potentially Mineable Mineralization for Mine Planning Potentially mineable resource: 941,000 Diluted ounces at a diluted grade of 6.5 g/t Category Contained Zone Tonnes Grade Au (ounces) (g/t
Slide 16: Mine Design
MINE DESIGN LONGHOLE STOPING PROVIDES A SAFE AND COST EFFICIENT METHOD Mine Design Parameters Longhole Stoping Mining Method Sugar Zone Middle Zone Level interval 15 m 20 m Stope strike length 50 m 30 m Limiting HR (hanging-wall) 7 7 Minimum mining width* 1.3 m true width 1.5 m true width Total 0.50
Slide 17: Mine Design – Schedule
MINE DESIGN – SCHEDULE MINE DESIGN ILLUSTRATED BY YEAR Sugar Zone South Ramp Sugar Zone North Ramp Middle Zone 17 TSX: HRT
Slide 18: Process Flowsheet
PROCESS FLOWSHEET SIMPLE FLOWSHEET WITH LOW CAPITAL AND OPERATING COSTS Flowsheet Design Process Flowsheet Primary jaw crusher followed by secondary cone crusher Grinding: 800 tpd ball mill Gravity: Two Falcon concentrators Flotation: Six TC10 Outotec flotation cells Filtration Tailings
Slide 19: Expansion to 1,400 tpd
EXPANSION TO 1,400 TPD Estimate of $23 million to be spent in 2020 on expanding throughput capacity: ► Additional cone crusher ► Second ball mill in parallel ► Storage modifications and additional conveyors for the ball mill ► Three additional flotation cells ► Concentrate regrind and leaching equ
Slide 20: Summary Economics
Summary Economics STRICTLY CONFIDENTIAL
Slide 21: PEA Summary
PEA SUMMARY Input Unit Value Gold Price US$/oz $1,250 Exchange Rate CAD:USD 0.80 Total Tonnes Processed Tonnes 4,539,800 Average Annual Throughput (2019+) tpa 402,617 Diluted Head Grade g/t 6.5 Macro and Gold Recovery % 95.4% Physical Parameters Mine Life Years 12 Total Ounces Recovered Ounces 904,0
Slide 22: Operating Costs
OPERATING COSTS OPERATING COSTS AND CONDITIONS WELL DEFINED THROUGH 70KT BULK SAMPLE PROCESS Underground Contract Mining Operating Cost Profile (US$/oz Au) Mining Detailed bottom-up cost analysis, considering 1,200 Processing 953 the following: 1,000 G&A 79 US$/oz Au ► Technica contract rates (bul
Slide 23: Capital Costs
CAPITAL COSTS EXISTING MINE DEVELOPMENT REDUCES CAPITAL COSTS, ACCELERATES TIMELINE TO PRODUCTION Costs Remaining for 2018 Capital Cost Profile – as at March 31st Minimal underground development 80 Underground Development Process Plant Construction Infrastructure Tailings Expansion ► Six months of
Slide 24: Debt Financing Package
DEBT FINANCING PACKAGE Sprott Facility Up to US$50 million senior secured credit facility ► Tranche I: US$20 million ► Subsequent US$10 million tranches, as required 5 year term Interest rate LIBOR + 7.5% Appian Subordinated Loan US$20 million subordinated loan 6 month term, option to exte
Slide 25: NPV and IRR Summary
NPV AND IRR SUMMARY Gold Price Sensitivities Unit US$1,150/oz PEA Pricing US$1,350/oz Macro Parameters Gold Price US$/oz $1,150 $1,250 $1,350 Exchange Rate CAD:USD 0.80 0.80 0.80 Pre-Tax NPV and IRR NPV @ 5% M C$ $263 $344 $425 IRR % 40% 50% 60% Post-Tax NPV and IRR NPV @ 5% M C$ $189 $244 $299 IRR
Slide 26: Environmental and Permitting
Environmental and Permitting STRICTLY CONFIDENTIAL
Slide 27: IBA Signed with Pic Mobert First Nation
IBA SIGNED WITH PIC MOBERT FIRST NATION Impact Benefits Agreement (“IBA”) signed with Pic Mobert First Nation (“PMFN”) Applies to other future mines that may be developed on the 80,000 hectare Sugar Zone property Proves a framework within which Harte Gold and PMFN will continue to work togethe
Slide 28: Summary
Summary STRICTLY CONFIDENTIAL
Slide 29: Key Takeaways
KEY TAKEAWAYS Fully funded to production Scalable mine plan: 1,400 tpd, +100,000 ounces of annual production Simple mine design, well understood orebody. 100,000 tonnes mined to-date AISC US$708/oz – first quartile cash cost producer $425 million pre-tax NPV5% Several opportunities to co
Slide 30: Analyst Presentation
Analyst Presentation May 3, 2018 GOLD CORP 30 TSX: HRT