    IMPORTANT NOTICE This presentation has been prepared by the management of Metals Exploration Plc for the benefit of the investing community including, brokers, fund managers, investors and analysts and not for the benefit of any particular person. The information is based on publically available inf

  3. Slide 3: A Near Term Gold Producer

    A NEAR TERM GOLD PRODUCER  Philippine focussed exploration and development company  Owns 100% of the Runruno Gold Project  Early stage construction works commenced in December 2011  Project debt funding – terms agreed being documented  Runruno is secured by a Financial or Technical Assistance A

  4. Slide 4: Company Information

    COMPANY INFORMATION KEY SHAREHOLDERS - % HOLDING (30 April 2012) SHARE CAPITAL  Solomon Capital Limited 32.08%  Issued ordinary shares 694,673,626  Baker Steel 22 79% 22.79%  Unlisted options and warrants 31,285,000  Runruno Holdings Limited 15.26%  Market Capitalisation (22 Feb 2012) £ 71 mil

  5. Slide 5: Runruno Gold Project

    RUNRUNO GOLD PROJECT Status: In development – early works commenced, Mine life: 10 3 years 10.3 Payable Production: 1,006,000 ozs Annual Production (aver.): 96,700 ozs (101,800 ozs Au years 1-5, 92,700 ozs Au years 6-10.3) Capital Cost: US$167.5m Cash Cost (Ave): US$ 477 / oz Au IRR : 42% post tax (

  6. Slide 6: Construction Philosophy

    CONSTRUCTION PHILOSOPHY Strong experienced owners team GMP – EPC execution ti philosophy hil h ffor hi highest h t risk i k mostt ttechnical h i l area – Process P Plant Pl t  Appoint an Engineer / Constructor with demonstrated performance – Leighton Contractors  Incentivise by sharing upside i.

  7. Slide 7: Runruno Construction Timeline

    RUNRUNO CONSTRUCTION TIMELINE Q4, 2011 H1, 2012 Q3, 2012 Q4, 2012 H1, 2013 H2, 2013 Q1, 2014 DMF Early works Project Sanction Construction Construction Construction Commissioning Infrastructure Finalise debt Process plant Commence mining Mining pre pre-strip strip Mining pre pre-strip s

  8. Slide 8: Early Site Works

    EARLY SITE WORKS  Commenced December 2011  Program of work to support full construction activities  Includes: • General site earthworks; • Processing plant pad earthworks; • Establishment E t bli h t off site it roads; d • Erection of construction camp; • Installation of construction power; • Con

  9. Slide 9: Processing Plant Pad

    PROCESSING PLANT PAD metal Sration TOWARDS PROOUCTION

  10. Slide 10: Process Plant Contract

    PROCESS PLANT CONTRACT  Letter of Intent (LOI) issued to Leighton Contractors for the design and construction of the processing plant on a Engineering and Construct contract and a Procurement contract basis for a Guaranteed Maximum Price (GMP) of US$95.1 US$95 1 million  The GMP prices is to be re

  11. Slide 11: Camp Site and Batch Plant Area

    CAMP SITE and BATCH PLANT AREA 11

  12. Slide 12: Main Access Road and Pit Access

    MAIN ACCESS ROAD and PIT ACCESS 12

  13. Slide 13: Regional Location

    REGIONAL LOCATION Airfield – Bagabag airfield 5 kms north of Solano •Solano Road – upgrade allowed along parts of the road. Currently passable all year. •Bayombong “Project Project is well served by existing infrastructure.” Power supply – switch yard in Bayombong will be the origin for the new 69Kv

  14. Slide 14: Resources and Reserves

    RESOURCES AND RESERVES March 2011 Resource & Reserve Statement Ore Gold Molybdenum Reserve Category Mt g/t M Oz ppm M lbs Proven 10.2 1.90 0.62 616 13.9 Probable 4.8 1.77 0.27 414 4.4 2P RReserves 1 0 15.0 18 1.85 0 90 0.90 603 18 3 18.3 Additional Inferred 2.9 1.73 0.16 258 1.7 Resource in-pit Ore

  15. Slide 15: Project Description

    PROJECT DESCRIPTION Five key components:  Mine Open Pit and Run of Mine (ROM) Pad  Process Plant facility y consisting g of conventional crushing, grinding, flotation, along with BIOX® and gravity recovery  Tailings T ili St Storage F ilit (TSF): Facility (TSF) to t ensure materials t i l are pro

  16. Slide 16: Mining

    MINING  Open pit area - 600m x 1,500m  1.75 1 75 Mtpa ore - transported by conveyor to the Process Plant  9.1 Mtpa overburden - used for the construction of the Tailings Storage Facility and in-pit backfill  During D i th first the fi t three th years, waste t material t i l will ill be b used d

  17. Slide 17: Gold Processing

    GOLD PROCESSING Pressure Oxidation, & BIOX® processes tested Ore contains free and refractory gold BIOX® offers: and molybdenite  Reduced Red ced capital intensity intensit  Lower operating costs Gold circuit demonstrated by extensive  Proven process testwork including 20t pilot plant  Ease o

  18. Slide 18: Molybdenum Opportunity

    MOLYBDENUM OPPORTUNITY Molybdenite occurs at Runruno as very fine 10-20 µm grains with pyrite and silicate minerals  Hydrometurgical H d t i l MoM recovery circuit i it in i development d l t – Electrometals El t t l Laboratory L b t Q Queensland l d  Modular add-on to gold circuit  Mo solubilise

  19. Slide 19: Tailing Disposal

    TAILING DISPOSAL Tailing Storage Facility (TSF)  Permanent storage of treated tailings in valley adjacent to the Process Plant  2 year starter embankment established using pit pre strip pre-strip  Dam lifted to final height during initial 3 years of production  Designed to national and internati

  20. Slide 20: Regional Exploration - Activities

    REGIONAL EXPLORATION - ACTIVITIES Active systematic exploration underway Diamond drilling IP and resistivity survey Aeromagnetic survey Ground mapping Geochemistry Remote sensing Early drilling results encouraging  Identification of Runruno styled mineralisation south of the pit  Strong co

  21. Slide 21: Southern Extension Area

    SOUTHERN EXTENSION AREA  Potential gold / molybdenum zone outlined south of the Runruno pit; • Flat dipping zone • Indicated grades 2-3 g/t Au • 8-12 m thick • +600m 600 llong, +200m 200 wide id • Terminated in the east by Malilibeg fault p to the west and south • Open • Underground potential • Int

  22. Slide 22: Cross Sections Showing Mineralised Zone

    CROSS SECTIONS SHOWING MINERALISED ZONE 22

  23. Slide 23: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY Education & Training Scholarships and assistance Adopt a school programme Out of work youth skills training programmes Teachers salaries Mature age learning programmes Multiple award winner Health & Nutrition Provision of a professionally staffed clinic inclu

  24. Slide 24: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY  Environment Protection and Enhancement  Environmental monitoring  Slope stabilisation and rehabilitation of disturbed areas  Forest regeneration  Multiple award winner  Communication Information and Education  To shape desirable social opinion about the compan

Metals Exploration — Shareholder Meeting (June 2012) on 6ix