Dpm Metals Inc. · TSX:DPM

Dpm Metals — Q4 2025 Earnings Presentation

24 slides from Dpm Metals's earnings presentation, Feb 11, 2026

  1. Slide 1: Uniquely Positioned to Deliver Superior Value

    TSX:DPM TSX: DPM ASX: DPM Uniquely Positioned to Deliver Superior Value Fourth Quarter & Year-End 2025 Results February 11, 2026

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Forward Looking Statements are statements that are not historical facts and are generally, but not always, identified by the use of forward looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “guidance”, “outlook”

  3. Slide 3: Non-GAAP Measures

    Non-GAAP Measures Certain financial measures referred to in this presentation are not measures recognized under IFRS and are referred to as Non-GAAP financial measures or ratios. These measures have no standardized meanings under IFRS and may not be comparable to similar measures presented by other

  4. Slide 4: 2025 Highlights

    2025 Highlights

  5. Slide 5: 2025 Highlights

    2025 Highlights Performance demonstrates strengths that underpin growth strategy ☑ Operational Track Record ☑ Strong Liquidity for Growth • 11 consecutive years achieving gold • $498 million in cash production guidance • New revolving $400 million credit facility ☑ Generating Strong Margins ☑ Organi

  6. Slide 6: Vareš Ramping up to Full Production in 2026

    Vareš Ramping up to Full Production in 2026 On track to achieve 850,000 tonnes by year-end % of 2026 gold equivalent production by quarter5,6 Integration activities proceeding well • Embedding DPM health and safety practices Achieve • Transforming training programs for local personnel 850ktpa 40 • E

  7. Slide 7: Chelopech: Stable Production with Near-Term Growth Potential

    Chelopech: Stable Production with Near-Term Growth Potential Flagship asset underpinning DPM success • Training ground for safety and leadership • Well-established social licence • Multi-decade track record of mineral reserve replacement 2026 production and all-in sustaining cost guidance • Producti

  8. Slide 8: Wedge Zone Discovery

    Wedge Zone Discovery Located in Chelopech mine concession approximately 300 m from existing Mineral Reserves • Newly discovered in 2025 high-grade zone • Results include 68.3 m at 7.42 g/t AuEq • Outlined over ~110 m strike length • Potential to expand zone as open in multiple directions • Ongoing 1

  9. Slide 9: Chelopech: Targeting Additional Mine Life

    Chelopech: Targeting Additional Mine Life Compelling exploration prospects to continue track record of adding mineral reserves Strategy: Near-mine drill testing and licence conversion • Predictable, proven permitting processes from +20-years of DPM ownership • Multiple exploration targets across the

  10. Slide 10: Advancing the Čoka Rakita Project

    Advancing the Čoka Rakita Project High-margin growth project with first production targeted for H1 2029 Feasibility Study Results8 $782M NPV5% | 36% IRR • Feasibility study outlines a robust, high-margin gold operation robust economics at $1,900/oz. Au • NPV5% of $2.2B at $3,500/oz. gold price • DPM

  11. Slide 11: Rakita Camp Inferred Mineral Resource

    Rakita Camp Inferred Mineral Resource Demonstrating Rakita camp’s potential for district-scale gold-copper systems • Since 2024: discovery to Mineral Resource estimate • Resource expansion as all three deposits remain open in multiple directions • Completed initial Inferred mineral resources estimat

  12. Slide 12: Rakita Camp: Large, Untested Porphyry-Skarn System

    Rakita Camp: Large, Untested Porphyry-Skarn System Multiple prospects within 1 to 2km from Čoka Rakita project infrastructure • Intensive camp-wide exploration campaign ongoing • 5 discoveries since 2022, with several untested targets to the north • Multiple targets on Potaj Čuka and Pester Jug lice

  13. Slide 13: Growing Precious Metals Producer

    Growing Precious Metals Producer Organic growth funded from a strong balance sheet Operating Assets Čoka Rakita8 Organic Projects & Exploration Prospects +189,000 ounces • Dumitru Potok (first 5 years) • Rakita Camp exploration • Wedge Zone Deep prospect • Chelopech North & Brevene brownfields explo

  14. Slide 14: Financial Results Highlights

    Financial Results Highlights 1414

  15. Slide 15: Financial Results Highlights

    Financial Results Highlights Record revenue, earnings and free cash flow $ millions except where noted Q4 2025 Q4 2024 % change 2025 2024 % change Q4 free cash flow2 Revenue 352.4 179.1 97% 950.5 607.0 57% $182.8 million Adjusted net earnings3 170.4 82.7 106% 443.2 232.2 91% Per share ($/sh) 0.77 0.

  16. Slide 16: Key Cost Metrics and Capital Expenditures

    Key Cost Metrics and Capital Expenditures All-in sustaining cost1 (excludes Vareš) Capital expenditures (excludes Vareš) $ per ounce of gold sold $ millions 4 5 All in sustaining cost Average realized gold price 2025 2025 Guidance 56 - 64 56 $4,323 $3,632 33 24 - 31 780 - 900 $1,082 $1,121 Q4 2025 2

  17. Slide 17: Three-Year Outlook Underpins Future Growth

    Three-Year Outlook Underpins Future Growth Growing production and investing in high-quality growth and exploration prospects 2025 Results (excluding Vares) 2026 Guidance5 2027 Outlook5 2028 Outlook5 Average annual GEO GEO production6 Koz 288 305 - 365 355 - 400 320 - 365 production6 Chelopech 217 18

  18. Slide 18: Financial Strength to Fund Growth

    Financial Strength to Fund Growth Record revenue, earnings and free cash flow Financial Position Ended 2025 with $498M in cash, following $ millions spending: • $399M in cash for Adriatic transaction • $136M to retire Adriatic's debt Total liquidity • $146M of capital returned to investors 400 (divi

  19. Slide 19: DPM Metals: A Premier Mining Business

    DPM Metals: A Premier Mining Business Strong fundamentals with a peer-leading fully-funded growth pipeline High-margin asset portfolio driving strong free cash flow generation Attractive high-quality growth projects Proven project development capabilities Strong balance sheet and sustainable financi

  20. Slide 20: Appendix

    fe BY S METALS Appendix

  21. Slide 21: Chelopech Operating Highlights

    Chelopech Operating Highlights Q4 2025 2025 Ore processed Kt 550 2,181 Head grades Gold g/t 3.16 3.04 Copper % 0.96 0.75 Recoveries Gold % 81.8 81.9 Copper % 85.0 83.3 Metals contained in concentrates produced Gold Koz. 45.7 174.4 Copper Mlbs. 9.9 30.0 Payable metals in concentrates sold Gold Koz. 4

  22. Slide 22: Ada Tepe Operating Highlights

    Ada Tepe Operating Highlights Q4 2025 2025 Ore processed Kt 236 797 Gold grade g/t 4.04 3.45 Gold recovery % 80.2 79.7 Gold contained in concentrate produced Koz. 24.6 70.5 Payable gold in concentrate sold Koz. 23.3 68.5 Cash cost per tonne of ore processed $/t 72 72 All-in sustaining cost1 $/oz. Au

  23. Slide 23: Footnotes

    Footnotes 1 Cost of sales per ounce of gold sold represents cost of sales for Chelopech and Ada Tepe, divided by payable gold in concentrate sold. This measure is before by-product credits. All-in sustaining cost per ounce of gold, or GEO where applicable, is a non-GAAP ratio which represents cost o

  24. Slide 24: Corporate Head Office Investor Relations

    Corporate Head Office 150 King Street West, Suite 902 Toronto, Ontario M5H 1J9 T: 416 365-5191 Investor Relations jcameron@dpmmetals.com T: 416 219-6177 www.dpmmetals.com

DPM Metals — Q4 2025 Earnings Presentation on 6ix