Carolina Rush Corporation · TSXV:RUSH

Carolina Rush — Investor Presentation (January 2026)

28 slides from Carolina Rush's investor presentation, January 2026

  1. Slide 1: Brewer Gold-Copper Project Partnered with OceanaGold

    Brewer Gold-Copper Project Partnered with OceanaGold Earn-In Includes US$20,000,000 for Exploration Plus Purchasing Brewer Property Q1- 2026 Cover Photo: Reclaimed Brewer Open Pit/Heap Leach Mine Site, South Carolina, USA

  2. Slide 2: Disclaimer

    Disclaimer This Presentation is not an offer to buy or sell the securities referenced herein, nor has the Securities and Exchange Commission or any state, provincial or territorial regulatory authority determined if this Presentation is truthful or complete. Any representation to the contrary is a c

  3. Slide 3: Mineral Resource Estimate Technical Disclosure

    Mineral Resource Estimate Technical Disclosure All scientific and technical information relation to the Mineral Resource Estimate (”MRE”) of the Brewer Gold-Copper Project contained in this presentation is derived from the news release dated August 8, 2025 titled “Carolina Rush Announces Refiling of

  4. Slide 4: Brewer Gold-Copper Project: Epithermal Au-Cu & Porphyry Target

    Brewer Gold-Copper Project: Epithermal Au-Cu & Porphyry Target Location Porphyry • Carolina Slate Belt hosted North America’s first gold • Geological, geochemical and rush – Brewer is 13 km from OceanaGold’s 4+ Moz geophysical exploration model points producing Haile Gold Mine PRIME LOCATION to deep

  5. Slide 5: Mineral Discovery Lifecycle (The Lassonde Curve)

    Mineral Discovery Lifecycle (The Lassonde Curve) Carolina Rush Currently at End of Pre-Discovery Phase Operating Mine Resource Definition Proof of Concept 4+ Years 1 – 2 Years 2 – 3 Years 2 Years 1 Year 10+ Years Concept Pre-discovery Discovery Feasibility Development Start-up Depletion Q1 - 2026 TS

  6. Slide 6: Brewer Gold-Copper Project: Partnered with OceanaGold Corporation

    Brewer Gold-Copper Project: Partnered with OceanaGold Corporation Earn-In Deal Includes U$20 Million for Exploration Plus Purchasing Brewer Option Agreement Key Highlights: Earn-In Option Agreement Entered on September 15, 2025 • Stage 1 Minimum Commitment exploration program and budget approved to

  7. Slide 7: Brewer Gold-Copper Project: Maiden Mineral Resource Estimate

    Brewer Gold-Copper Project: Maiden Mineral Resource Estimate In Situ & Pit Backfill Brewer In Situ Mineral Resource Visual Validation Summary of 2025 Maiden Mineral Resource Estimate Au Cu Tonnes Resource Classification M Oz Au g/t % (Mt) lbs Brewer Backfill Mineral Resource Visual In Situ Indicated

  8. Slide 8: Brewer Geology: Exploration Model

    Brewer Geology: Exploration Model Diatreme Breccias and Porphyry Target Porphyry Cu Model Cross-Section Brewer Level • Lithocap forms prominent topographic high • High-Level diatreme at surface, above porphyry system at depth Q1 - 2026 TSXV: RUSH | OTCQB: PUCCF 8

  9. Slide 9: Compelling Porphyry Target

    Compelling Porphyry Target From Deep-Sensing MT-IP Geophysical Survey • MT-IP survey was conducted by Zonge International Geophysical Services (Zonge) over a four-week period • The survey consisted of 5 lines approximately 3.8 km in length spaced 200 meters apart • The survey was designed to cover t

  10. Slide 10: Compelling Porphyry Target

    Compelling Porphyry Target From Deep-Sensing MT-IP Geophysical Survey Cutaway Section View Through 3D MT Resistivity Porphyry Cu Model Cutaway Section View Through 3D IP Chargeability Volume Showing Spatial Relationship Volume Showing Low-Resistivity Columnar Body Cross-Section Between Low-Resistivi

  11. Slide 11: Porphyry Exploration Drill Program to Commence January 2026

    Brewer Project: Porphyry Exploration Drill Program to Commence January 2026 Two Holes Planned to Test the Geologic, Geophysical and Geochemical Signatures of a Potential Cu-Au System Proposed DDH A-1 • Az: 155, Dip: -70, TD: 1,500 m • Designed to test the strongest part of the low resistivity body (

  12. Slide 12: Brewer Project: MT Resistivity Line 3

    Brewer Project: MT Resistivity Line 3 (looking W-SW) Proposed DDH A-1, A-2 & B-1 Q1 - 2026 TSXV: RUSH | OTCQB: PUCCF 12

  13. Slide 13: Brewer Project: DCIP-Chargeability, MT Resistivity Line 3

    Brewer Project: DCIP-Chargeability, NT Resistivity Line 3 (Looking W-SW) Proposed DDH A-1, A-2 & B-1 Q1 - 2026 TSXV: RUSH | OTCQB: PUCCF 13

  14. Slide 14: Core Photos: Lithology, Mineralization & Alteration

    Core Photos: Lithology, Mineralization & Alteration Breccia and Mineralization B21C-005: 165.4 m B21C-008: 120.3 m B21C-008: 104.5 m B21C-008: 67.6 m Multiple episodes of brecciation and Sub-rounded, polyphase, clast-supported, Angular, monolithic, matrix-supported Large, mineralized quartz-porphyry

  15. Slide 15: Core Photos: Tanyard Zone

    Core Photos: Tanyard Zone Examples of Mineralization Encountered in Hole B23C-021 B24C-034: 145 – 148 m Q1 - 2026 TSXV: RUSH | OTCQB: PUCCF 15

  16. Slide 16: Carolina Rush Capital Structure

    Carolina Rush Capital Structure TSXV: RUSH | OTCQB: PUCCF Capital Structure (as of January 5, 2026) Share Price: $0.14 Shares Outstanding: 90,799,482 Warrants (Avg $0.205): 32,757,198 Insiders, Management Retail & Advisors 21% Options (Avg $0.46): 2,337,500 16% Fully Diluted: 125,894,280 52 Week Ran

  17. Slide 17: Management Team

    Management Team Seasoned Leadership & Technical Expertise LAYTON CROFT – President, CEO & Director MARK MCMURDIE – CFO • Entrepreneur and Executive with 30 years of global professional experience including • Executive with +30 years of senior leadership experience in public and private 20 years of m

  18. Slide 18: Directors & Advisors

    DIRECTORS & ADVISORS LAYTON CROFT – President, CEO & Director LAURIE CURTIS – Strategic Advisor • Entrepreneur and Executive with 30 years of global professional experience • Mining geologist and executive who founded the company that discovered and developed the world class Tujuh including 20 years

  19. Slide 19: Appendix

    Appendix

  20. Slide 20: Porphyry Copper Vectoring

    Porphyry Copper Vectoring Geochemical Zonation • The geochemical zonation patterns at Brewer reveal a broad zone of anomalous gold (0.2 ppm) which encompasses more discrete zones of anomalous copper (>500 ppm) Mo>50ppm and molybdenum (>25 ppm) and represents the high-sulfidation geochemical (-300m r

  21. Slide 21: Brewer Project: Porphyry Copper Vectoring

    Brewer Project: Porphyry Copper Vectoring B20C-007 Patchy B20C-007 (TD = 380 m) pyrophyllite B20C-007 alteration Chargeability • South angled hole located north of resistivity low high • Quartz-pyrophyllite (kaolinite-topaz) dominate alteration • Inter-mineral quartz-feldspar porphyry dike with Zn-P

  22. Slide 22: Brewer Project: MT Resistivity Line 4

    Brewer Project: MT Resistivity Line 4 Looking W-SW Brewer Project: MT Resistivity Line 4 (looking W-SW) B20C-007 Tanyard Breccia HSE Au-Cu Brewer Breccia HSE Au-Cu B21C-016x Inter-mineral porphyry dike >Mo + Topaz @ EOH eastern margin of low resistivity body (inferred intrusion) Q1 - 2026 TSXV: RUSH

  23. Slide 23: Brewer Project: Porphyry Copper Vectoring

    Brewer Project: Porphyry Copper Vectoring B21C-016 & B24C-016x Patchy B21C-016/B24C-016x (TD = 658 m) pyrophyllite alteration Chargeability • Vertical hole located north of resistivity low high B21C-016x • Extended in 2024 to test PCD exploration model • Quartz-pyrophyllite (kaolinite-topaz) dominat

  24. Slide 24: Brewer Project: MT Resistivity Line 4

    Brewer Project: MT Resistivity Line 4 Looking W-SW Brewer Project: MT Resistivity Line 4 (looking W-SW) B20C-007 Tanyard Breccia HSE Au-Cu Brewer Breccia HSE Au-Cu B21C-016x Patchy pyrophyllite w/ tr cpy+bn Increasing Mo: ~200m @ 85 ppm, (up to 1,300 ppm Mo), local cpy western margin of low resistiv

  25. Slide 25: Brewer Project: Porphyry Copper Vectoring

    Brewer Project: Porphyry Copper Vectoring B24C-024 Patchy B24C-024 (TD = 272 m) pyrophyllite alteration Chargeability • Vertical hole located west of resistivity low high • Alunite dominate alteration ** * • Appreciable specularite noted near bottom of hole Quartz-topaz • Alunite+specularite indicat

  26. Slide 26: Brewer Project: MT Resistivity Line 2

    Brewer Project: MT Resistivity Line 2 Looking W-SW Brewer Project: MT Resistivity Line 2 (looking W-SW) B24C-024 Quartz-alunite (+/- pyrophyllite – white mica) altered breccia. Local specularite Quartz-alunite (+/- pyrophyllite – white mica) altered breccia. Local specularite low resistivity body (i

  27. Slide 27: Brewer Project: Porphyry Copper Vectoring

    Brewer Project: Porphyry Copper Vectoring B20C-003 B20C-003 @ 369 m: B-type Mo vein within KPT Patchy alteration pyrophyllite Chargeability alteration high * ** Quartz-topaz alteration B20C-003 (TD = 503 m) • South angled hole drilled west of former mine Resistivity drilled within resistivity low lo

  28. Slide 28: Brewer Project: MT Resistivity Line 3

    Brewer Project: MT Resistivity Line 3 Looking W-SW Brewer Project: MT Resistivity Line 3 (looking W-SW) Tanyard Breccia B20C-003 HSE Au-Cu B-type Mo veins low resistivity body KPT -> Alunite -> White Mica (inferred intrusion) transition @ EOH w/ trace tetrahedrite Q1 - 2026 TSXV: RUSH | OTCQB: PUCCF

Carolina Rush — Investor Presentation (January 2026) on 6ix