Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Cowen and Company Global Metals, Mining and Materials Conference 2014

17 slides from Turquoise Hill Resources's conference presentation, Nov 11, 2014

  1. Slide 1: Oyu Tolgoi – a world-class copper and gold mine

    Cowen and Company Global Metals, Mining and Materials Conference NOVEMBER 11, 2014 Oyu Tolgoi – a world-class copper and gold mine STEEVE THIBEAULT CFO

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: The Oyu Tolgoi mine

    The Oyu Tolgoi mine Strategically located approximately 80km from Chinese border 3

  4. Slide 4: First quartile costs

    First quartile costs Copper mine C1 cost curve in 2020 (c/lb, 2014$) 400  Oyu Tolgoi is in the first quartile of the industry Oyu Tolgoi cost curve Other Mines 300  Third largest copper mine after planned expansion1  Top 10 copper deposit by 200 contained reserves and resource2  One of the large

  5. Slide 5: Updates from the Gobi

    Updates from the Gobi Oyu Tologi - operating cash flow positive, focused on cost savings  High-grade zone of open pit was accessed in Q3’14 with consistent mining in September  Grades improved in Q3’14 and are expected to increase in Q4’14  Strong concentrate sales continue with sales exceeding p

  6. Slide 6: 2014 Technical Report

    2014 Technical Report Reserve Case (Feasibility Study): LOM Case: HNL1 & SOT Pit SOT Pit, HNL1, HNL1 ext, HNL2, HS, Heruga Plant *Life of Mine Case includes inferred, so not included in economic evaluation  Proposes the next sensible step in development, delivering significant value and initiating

  7. Slide 7: Highly attractive project economics

    Highly attractive project economics 2014 Reserve Units Case Total Processed Bt 1.5 Cu Grade % 0.85 Au Grade g/t 0.32 Ag Grade g/t 1.94 Copper Recoverable B lb 24.9 Gold Recoverable Moz 11.9 Silver Recoverable Moz 78.0 Life Years 41 Expansion Capital US$B 4.9 NPV (8.0%) After Tax US$B 7.43 IRR After

  8. Slide 8: Multiple development options

    Multiple development options  Production creep targeted along with expansion  Actual operating performance will inform choice of expansion path  A decision to expand the concentrator is not be required for a couple years 8

  9. Slide 9: Potential upside value

    Potential upside value • Copper/gold prices Market • Potential outbound logistics options • Block cave performance - reduced dilution/losses Mining • Schedule - faster development, faster ramp-up • Higher productivity on footprint could translate to higher production rate • Throughput rate Processin

  10. Slide 10: Made in Mongolia

    Made in Mongolia  Mongolians now occupy more than 90% of Oyu Tolgoi roles  Over $1 billion in taxes, pre-payments and fees paid to the Government since 2010  Partnered with more than 1,300 local suppliers over the last two years  $126 million investment in education and training across Mongolia

  11. Slide 11: Unlocking the next phase of development

    Unlocking the next phase of development Underground development is subject to… 1. Resolution of the remaining shareholder matters, including the tax dispute 2. Agreement of a comprehensive funding plan, including project finance 3. Approval of feasibility study by shareholders and acceptance by the

  12. Slide 12: Turquoise Hill – a long-term growth opportunity

    Turquoise Hill – a long-term growth opportunity  Pure copper and gold exposure  Positive operating cash flow and focusing on asset optimization  Focused on progressing development of the high-grade underground mine  Significant growth, development and expansion opportunities  Strategically loca

  13. Slide 13: Appendix

    Cowen and Company Global Metals, Mining and Materials Conference NOVEMBER 11, 2014 Appendix

  14. Slide 14: 2014 Technical Report assumption changes

    2014 Technical Report assumption changes Parameter 2013 Technical Report 2014 Technical Report Reserve (Mt) 491 @ 1.80% Cu, 0.39 g/t Au 499 @ 1.66% Cu, 0.35 g/t Au 1,048 @ 0.46% Cu, 0.31 g/t Au 1070 @ 0.45% Cu, 0.31 g/t Au Mining losses & No draw bell losses, Increased dilution entry with 4% dilutio

  15. Slide 15: 2014 OTTR vs. 2013 OTTR mine design

    2014 OTTR vs. 2013 OTTR mine design 2014 OTTR Panel 1 Panel 2 15

  16. Slide 16: Current development schedule

    Current development schedule Complete Convey to Surface Sustainable Underground Production Complete Concentrator Project Start Upgrade Complete Ramp-up 1st Draw Bell Firing 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Set-Up Excavation (Lateral / Mass / Vertical) Undercutting Ext

  17. Slide 17: Copper and gold market strength

    Copper and gold market strength Copper mine supply/demand outlook (Mt)  Copper market likely to see small surplus in coming years Base Highly Probable Primary Demand 30  Ongoing attrition at existing Forecast mines driven by structural 25 decline in grade; continued demand growth means the 20 indu

Turquoise Hill Resources — Cowen and Company Global Metals, Mining and Materials Conference 2014 on 6ix