Gallantt Ispat Limited · NSE:GALLANTT

Gallantt Ispat — Q1 FY25 Earnings Presentation

30 slides from Gallantt Ispat's earnings presentation, Aug 13, 2024

  1. Slide 1: Cover letter to stock exchanges: press release

    Crunnrffi GtLlcKPl2024-2s August 13, 2024 BSE Limited National Stock Exchange of India Limited Floor 25, P J Towers, Dalal Street "EXCHANGE PLAZA', Mumbai- 400 001. INDIA. Bandra - Kutla Complex, Bandra (East) Scrip Code:532726 Mumbai - 400 051. INDIA. Symbol: GALLANTT SirMadam, SUB: PRESS RELEASE P

  2. Slide 2: Gallantt Ispat Limited Q1FY25 Investor Presentation

    Gallantt Ispat Limited Q1FY25 Investor Presentation Presence, Efficiency, Scale

  3. Slide 3: Safe Harbour

    The following slides may contain “forward looking statements” including, statements relating to the implementation of strategic initiatives by Gallantt Ispat Limited (“GIL” or “Company”) and future business developments and economic performance. While these forward looking statements indicate the Co

  4. Slide 4: Financial overview Q1FY25

    Presence Efficiency Scale Financial overview Q1FY25 Revenue EBITDA PAT (Rs. Crore) (Rs. Crore) (Rs. Crore) 11.9% 1,159.69 199.9% 296.8% 1,036.17 215.75 121.86 71.94 30.71 Q1FY24 Q1FY25 Q1FY24 Q1FY25 Q1FY24 Q1FY25  EBITDA and PAT increase are also driven by several efficiency and cost rationalisatio

  5. Slide 5: Production and sales volumes Q1FY25

    Presence Efficiency Scale Production and sales volumes Q1FY25 Production volumes Sales volumes TOTAL TOTAL DRI Steel Melt Shop Rolling Mill DRI Steel Melt Shop Rolling Mill Period Power Plant Pellet Period Pellet (Sponge Iron) (Billet) (TMT Bars) (Sponge Iron) (Billet) (TMT Bars) MW Unit MT MT MT MT

  6. Slide 6: EBITDA Per tonne

    Presence Efficiency Scale EBITDA Per tonne (Rs. Per Tonne)  Various cost rationalization and efficiency initiatives including: 9,782 • Procurement of Railway Goods Rakes which have reduced freight costs and turnaround time besides ease of operation • Commencement of Pellet producing capacity for ca

  7. Slide 7: Successful preferred bidder for Iron Ore Mine

    Presence Efficiency Scale Successful preferred bidder for Iron Ore Mine Gallantt Ispat Limited has been declared as a Successful "Preferred Bidder" vide communication Letter received from the Director of Mines & Geology, Government of Rajasthan on June 15, 2024, for Composite Licence for Todupura lr

  8. Slide 8: Chairman's Message

    Chairman’s Message Chairman and MD, Chandra Prakash Agrawal commenting on the Q1FY25 results, “The first quarter of this fiscal year has seen a robust growth in volumes which has led to increased turnover. In line with our all round endeavour to optimize efficiencies our profitability too has increa

  9. Slide 9: Our journey

    Our journey 2005 2009 2012 – 2022 2020 2022 Commencement of Commencement of Capacity Completed Installation of commercial commercial operation expansions across execution of Real Modern materials operations at 1.7 at 1.67 lakh MTPA both Estate Premium movement Wagon lakh MTPA integrated steel manufa

  10. Slide 10: Presence Efficiency Scale

    Presence Efficiency Scale Profitable growth on Leading manufacturer the back of strong cost of TMT bars – Capacity: optimisation thrust, 950,000 TPA backward integration and value addition Well entrenched presence in key Strong presence in consumption states of infra sector of both Uttar Pradesh and

  11. Slide 11: The Gallantt locational advantage

    Presence Efficiency Scale The Gallantt locational advantage  Gorakhpur, Uttar Pradesh o Only Integrated Steel Plant in Uttar Pradesh; a region which is witnessing significant development o Enhanced customer serviceability: • Shorter delivery times • Ability to deliver small quantities offering deal

  12. Slide 12: Driving operational efficiencies

    Driving operational efficiencies

  13. Slide 13: Backward integration: Pellets and Coal

    Presence Efficiency Scale Backward integration Pellets Coal  792,000 MT/annum pellets capacity in Gorakhpur  Linkages with Northern Coalfields Limited, caters to entire production requirement Eastern Coalfields Limited and Central coalfields  Captive production estimated to be ~10‐15% Limited ens

  14. Slide 14: Logistics and power: Rail infrastructure and Captive Power

    Presence Efficiency Scale Logistics and power Rail Captive infrastructure Power  Railway sidings at both units to facilitate  Total captive power capacity: 129 MW efficient material movement and connectivity  Availability of captive power ensures minimal  Modern material wagon tippler at Gorakhp

  15. Slide 15: Power: Own vs purchased

    Presence Efficiency Scale Power: Own vs purchased % of Captive power consumed – % of Captive power consumed – Kutch, Gorakhpur, UP Gujarat 95.4% 94.7% 98.6% 97.2% 95.7% 95.9% 96.1% 95.5% 94.5% 90.1% 90.4% 88.8% 92.5% 92.5% 91.5% 93.0% 84.8% 78.9% Q1FY23 Q2FY23 Q3FY23 Q4FY23 Q1FY24 Q2FY24 Q3FY24 Q4FY

  16. Slide 16: Capacity overview

    Presence Efficiency Scale Capacity overview Plant wise breakup TOTAL Type Units Total Sponge Iron MT 9,18,000 Steel Melt Shop MT 9,57,000 Rolling Mill MT 9,50,400 Power Plant MW 129 Pellet Plant MT 7,92,000 Gorakhpur, Uttar Pradesh Type Units Total Sponge Iron MT 5,44,500 Steel Melt Shop MT 5,28,000

  17. Slide 17: Dealer & Distributor strength and relationship

    Presence Efficiency Scale Dealer & Distributor strength and relationship Thrust on expanding and Catering to ~2700 dealers and deepening distribution around 34 distributors in network to reach further Into Uttar Pradesh and Gujarat for areas in Uttar Pradesh seeing close to 2 decades Infrastructure

  18. Slide 18: EPC and construction

    Presence Efficiency Scale EPC and construction  Evaluating opportunities to monetise ~27.5 acre land owned by Gallantt Ispat  Group Housing project with ultra modern facilities under the name “Shalimar Gallant”  Plans to enter into new venture of real estate and infra including construction of ho

  19. Slide 19: Value Addition thrust

    Value Addition thrust

  20. Slide 20: Premium offerings

    Presence Efficiency Scale Premium offerings Introduced a stronger and more durable value added offering under the brand Gallantt Advance Bollywood star Ajay Devgn is the brand ambassador Emphasis on branding, use of electronic and social media 19

  21. Slide 21: Capex plans & timelines (Future plans)

    Presence Efficiency Scale Capex plans & timelines (Future plans) Direct Reduced Iron (DRI) Kiln having a capacity of 1,65,000 MTPA at the Company’s manufacturing facilities at Gorakhpur, Uttar Pradesh is expected to be completed by FY2025. The cost towards this is ~Rs. 125 crore. The Company has ins

  22. Slide 22: ESG Initiatives

    Presence Efficiency Scale ESG Initiatives Recycling of water Modern technology and other natural Plantations at Water conservation and equipment to resources across factory premises and harvesting lesser consumption factory premises and of electricity factory operations Modern Modern technology equi

  23. Slide 23: Promoter Group

    Promoter Group CHANDRA PRAKASH AGRAWAL DINESH R. AGARWAL NITIN M KANDOI Chairman & Managing Director Director – Administration Director-Plant Operation  First generation entrepreneur  First generation entrepreneur,  Actively involved in the possessing more than 40 years having over three decades

  24. Slide 24: Uttar Pradesh, Gujarat – Strong infrastructure investment thrust

    Presence Efficiency Scale Uttar Pradesh, Gujarat – Strong infrastructure investment thrust Strong infrastructure push in both states of operation driven by public and private sector participation Key infrastructure projects: Uttar Pradesh Project Name Sector Total Project Cost (in Rs. crore) Road Up

  25. Slide 25: Growth outlook

    Presence Efficiency Scale Growth outlook Efficiencies  Technological upgradation across facilities to enhance capacity utilization from present 80% to 95%  Installation of Modern Rail tippler contributing towards lower wastage faster turnaround time o Full benefit to be visible in current year Rat

  26. Slide 26: Financial outlook

    Presence Efficiency Scale Financial outlook FY26 (E) revenue: ~Rs. 5,000 crore +/‐5% To be driven by targeting to achieve capacity utilisations levels of >90%  EBITDA margins in FY 2023 was 9%, which in FY 2024 has increased to 11% and is expected to expand by 200 basis points to 13% in FY25. To be

  27. Slide 27: P&L Q1FY25

    P&L Q1FY25 STATEMENT OF UNAUDITED FINANCIAL RESULTS FOR THE QUARTER ENDED JUNE 30, 2024 Rs. in Lakhs Quarter ended Year ended Sr. Particulars 30.06.2024 31.03.2024 30.06.2023 31.03.2024 No. Unaudited Audited Unaudited Audited 1. Income from operations (a) Revenue from operations 1,15,969.44 1,17,738

  28. Slide 28: The Gallantt Group

    Presence Efficiency Scale The Gallantt Group Gallantt Cement  Cement manufacturing unit at Gorakhpur with an annual capacity of 6,00,000 MTPA  Commenced commercial operations in 2022 Gallantt Flour  Modern Flour Mill unit with an annual production capacity of 1,08,000 MTPA  Commenced commercial

  29. Slide 29: Contact Us

    Contact Us Nitesh Kumar (Head ‐ Investor Relations) Gallantt Ispat Limited Tel: +91 99034 62248 Email: nitesh@gallantt.com Gavin Desa / Rishab Barar CDR - India Tel: +91 98206 37649/ +91 77770 35061 Email: gavin@cdr‐india.com / rishab@cdr‐india.com 28

  30. Slide 30: Thank You

    “a po re Tar Time _ __ Paar

Gallantt Ispat — Q1 FY25 Earnings Presentation on 6ix