Brigus Gold Corp

Brigus Gold — Investor Presentation (July 2011)

28 slides from Brigus Gold's investor presentation, Jul 15, 2011

  1. Slide 1: Positioned for Growth: July Investor Presentation

    Slide 1: Positioned for Growth: July Investor Presentation

    Positioned for Growth (TSX & NYSE Amex: BRD) July Investor Presentation

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements FORWARD-LOOKING STATEMENTS Certain statements in this presentation relating to the Company’s exploration activities, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. These statements include statements r

  3. Slide 3: Investment Highlights: Positioned for Growth

    Slide 3: Investment Highlights: Positioned for Growth

    Investment Highlights: Positioned for Growth (TSX: BRD; NYSE Amex: BRD) • Canadian gold producer – Increasing gold production at the Black Fox Gold Mine, Timmins District, Ontario – Potential development at Goldfields, Saskatchewan – Approximately 2 million ounces of gold reserves in Canada • Year-o

  4. Slide 4: Capital Structure

    Slide 4: Capital Structure

    Capital Structure Basic Shares Outstanding (millions) 190.2 Fully Diluted Shares Outstanding (millions) 1 260.2 Market Capitalization $348.1 (On basic shares; US$ million at US$1.65 on 6/21/11) Trading Liquidity (Total of TSX and Amex average 1.25M shares daily trading volumes of past three months)

  5. Slide 5: North American Asset Portfolio

    Slide 5: North American Asset Portfolio

    North American Asset Portfolio 5

  6. Slide 6: Improving Performance

    Slide 6: Improving Performance

    Improving Performance lans P s e nt 2012 and m p lish July – beyond Ac com December January –  Black Fox 2011 July – June 2011 resource expansion December  Production  Black Fox  Underground ramp up Phase 2 Mill 2010 infrastructure qtr-over-qtr expansion completed at Black Fox  Production  Unw

  7. Slide 7: Current Gold Reserves & Resources

    Slide 7: Current Gold Reserves & Resources

    Current Gold Reserves & Resources Measured & Indicated Proven & Probable Resources, including Inferred Resources Reserves Reserves Gold Gold & Au & Au Gold & Gold Equiv Gold & Equiv Au Grad Gold . Au Tonne Property Tonnes e Tonnes . Equiv. (oz) Grad Equiv. s (g/t) Grad e (oz)4 (oz) 4 e (g/t) 2, 3 (g

  8. Slide 8: Timmins Gold District

    Slide 8: Timmins Gold District

    BRIGUS Timmins Gold District lake Abitibi Frederick House Lake BLACK FOX Kinross Taylor Bell Creek X XS Hoyle Pond & MINE Holt Pamour §¢_ Paes aE. iy 42 |. Timmins % Ong f Q Hollinger 5 South Por BLACK Ross Dome ae Bester DESTOR-PORCUPINE ake ~camslmey FAULT ZONE (250km)

  9. Slide 9: Black Fox Mine: Overview

    Slide 9: Black Fox Mine: Overview

    Black Fox Mine: Overview Location Timmins, Ontario, Canada Ownership 100% Brigus Gold Sandstorm Gold Stream: 12% Black Fox Deposit 10% Black Fox Extension Began May 2009 Production Estimated Mine ~8.5 years based on Life current reserves Mine Type Open pit with underground mine Capex Spent to ~$150

  10. Slide 10: Black Fox Mine Underground

    Slide 10: Black Fox Mine Underground

    Black Fox Mine Underground Min N Proposed 235m level exploration drift 200m extension to continue fan drilling 235m level exploration drift 200m 11

  11. Slide 11: Black Fox Operating Highlights

    Slide 11: Black Fox Operating Highlights

    Black Fox Operating Highlights 2010 2011(1,2) 2012(1) (actual) (plan) (plan) Gold Production (oz) 67,499 73,000 - 80,000 104,000 Capex $35.5M $37.0M $23.8M Cash Cost (per oz) $589 $575-$625 <$550 Exploration $7.5M $11M $8M 11 1. Mine will reach steady state annual production of 104,000 oz by mid-201

  12. Slide 12: Black Fox Complex: Exploration Upside

    Slide 12: Black Fox Complex: Exploration Upside

    Black Fox Complex: Exploration Upside Additional underexplored BLACK FOX MINE property to the north N Entire down-dip extension of the Destor- D Fa est Porcupine Fault ul or Zone is Black Fox t -P 10% Gold stream Z prospective for 12% Gold Stream on orc gold. e u pi n e Pike River Scho ol Hous e Con

  13. Slide 13: Black Fox Mine: Exploration Upside

    Slide 13: Black Fox Mine: Exploration Upside

    Black Fox Mine: Exploration Upside Modelled Au Grade Longitudinal Section Looking North Au >1 gpt N EXPLORATION DRILLING Au >5 gpt Au >10 gpt FROM SURFACE Au Mineralized Trend 235-m Level BLACK FOX Exploration Drift Test West Extension of Green Carbonate and Felsic Intrusive Ore Down Dip Extend 235-

  14. Slide 14: Black Fox Complex: Airborne Mag Survey

    Slide 14: Black Fox Complex: Airborne Mag Survey

    Black Fox Complex: Airborne Mag Survey N Typical of many Major North-South Fault deposits that occur due to major structural flexures, Black Fox sits within Black Fox a major flexure of the Major Flexure in Deposit Destor-Porcupine Fault DPFZ and associated Zone north-south fault Base Metal Zone str

  15. Slide 15: Titan Deep IP Survey Over Black Fox Complex

    Slide 15: Titan Deep IP Survey Over Black Fox Complex

    Titan Deep IP Survey Over Black Fox Complex The 2010 Titan Deep IP survey has define 12 first priority and 14 second priority drill targets. Selected targets will be drill tested in 2011 Chargeabili ty IP (Chargeability) results at the Black Fox Mine show a large, well defined, pronounced IP low at

  16. Slide 16: Black Fox Complex: 2011 Exploration Plan

    Slide 16: Black Fox Complex: 2011 Exploration Plan

    Black Fox Complex: 2011 Exploration Plan • Five drill rigs currently operating at the Black Fox Mine property • Estimated expenditure: $11 million • 147 Zone: New discovery – step out drilling continuing and advancing towards initial NI 43- 101 resource estimate • Black Fox deposit: To be drilled fr

  17. Slide 17: Goldfields Project: Overview

    Slide 17: Goldfields Project: Overview

    Goldfields Project: Overview Location Uranium City, Saskatchewan, Canada Ownership 100% Brigus Gold Current Status Feasibility completed (Box) Pre-feasibility completed (Athona) Production 2013 Expected Estimated Mine 14 years (includes Box and Life Athona) Mine Type Open pit Estimated Capex ~US$125

  18. Slide 18: Goldfields: NPV Sensitivity Analysis

    Slide 18: Goldfields: NPV Sensitivity Analysis

    Goldfields: NPV Sensitivity Analysis Box Mine and Athona Deposit Combined Gold Price NPV @ 5% US$900/oz US$92.9 million US$1,000/oz US$134.4 million US$1,150/oz US$196.6 million US$1,300/oz US$258.6 million Key Assumptions: - 5,000 tonnes per day mill operation (1.8 million tonnes per year) - Estima

  19. Slide 19: Box Mine: Down-Dip Exploration Potential

    Slide 19: Box Mine: Down-Dip Exploration Potential

    Box Mine: Down-Dip Exploration Potential The Box deposit is open at Proposed Pi 0m depth B10-303 B10-304 100 m B10-304 B10-303 41.7m@ 2.52g/t Au 29.1m@ 2.28g/t Au incl 13.9m@ 6.84g/t Au incl 14.1m@ 3.87g/t Au incl 4.7m@ 7.50g/t Au B07-292 47.81m@ 2.13 g/t Au B07-297 incl 8.60m@ 8.35g/t Au 19.36m@ 1.

  20. Slide 20: Catalysts for 2011

    Slide 20: Catalysts for 2011

    Catalysts for 2011 • Increasing gold production – Commercial production commenced in April 2011 – Increasing quarter over quarter gold production and declining cash costs – Cash costs estimated at $575 to $625 per ounce in Q4 2011 • Exposed to rising gold prices • No gold derivatives. 88% of gold pr

  21. Slide 21: Summary Investment Highlights

    Slide 21: Summary Investment Highlights

    Summary Investment Highlights (TSX & NYSE Amex: BRD) “With a full ramp-up expected by Q4/11, a growing production profile, and improved capital structure, Brigus still remains undervalued to its peers currently trading at 7.9X 2011E price/CFPS, versus the group average of 12.1X” Kerry Smith Haywood

  22. Slide 22: Appendix – Additional Information

    Slide 22: Appendix – Additional Information

    Appendix – Additional Information 22

  23. Slide 23: Black Fox Mine – Mine Life & Operating Costs

    Slide 23: Black Fox Mine – Mine Life & Operating Costs

    Black Fox Mine – Mine Life & Operating Costs Open pit 1,000 to 1,200 tpd 5 years mine plan1,2 rate LOM strip1,3 ~10:1 open pit waste to ore Underground 800 to 1,000 tpd 8.5 years mine plan1 rate LOM Mining Costs1 per tonne ore & Open pit ~US$2.60 waste Underground4 ~US$56.50 per tonne ore 1. Based o

  24. Slide 24: Share Capital

    Slide 24: Share Capital

    Share Capital C/ As of March 29, 2011 Date US Price Shares Cash to Brigus1 (US$ millions) Common Shares Outstanding2 190,210,214 7/24/2011 C $2.600 5,100,813 $12,630,585 11/19/201 C $1.569 891,316 $1,331,881 1 7/24/20123 C $2.400 612,098 $1,399,081 7/29/2012 C $1.400 630,000 $840,000 10/19/201 C $1.

  25. Slide 25: Mexican Assets

    Slide 25: Mexican Assets

    Mexican Assets Ixhuatán Project Huizopa Royalty Location Chiapas, Mexico Location Chihuahua, Mexico Ownership LOI to divest 75% to Cangold Brigus Interest 3% Net Smelter Royalty Current Status Exploration Cormack Capital can reduce NSR to 2% by payment of $1 M&I Resources 9.4Mt @ 2.8 g/t Au and 11.5

  26. Slide 26: Board of Directors

    Slide 26: Board of Directors

    Board of Directors • Wade K. Dawe, Chairman, CEO & President: Successful entrepreneur and business leader in Canadian mining and venture capital industries. Held same position for Brigus Gold’s predecessor company, Linear Gold. Director of Linear Metals and Immunovaccine. Bachelor of Commerce, Memor

  27. Slide 27: Management Team

    Slide 27: Management Team

    Management Team • Wade K. Dawe, Chairman, CEO & President: See prior Board of Directors slide • Richard Allan, VP & Chief Operating Officer: Senior mining executive and mine engineer. Formerly Sr. Director, Mining, Barrick Gold; past operations positions in mining, including as Chief Mine Engineer a

  28. Slide 28: Contact Information

    Slide 28: Contact Information

    Contact Information Brigus Gold Corp. TSX: BRD NYSE Amex: BRD Investor Relations: Jennifer Nicholson, VP of Investor Relations Phone: (902) 422-1421 Toll free: (866) 785-0456 Email: jnicholson@brigusgold.com Katie Burgess, Manager Stakeholder Relations Phone: (902) 422-1421 Toll free: (866) 785-0456

Source: Internet Archive copy of brigusgold.com

More decks from Brigus Gold Corp