Aurelia Metals Limited · ASX:AMI
Aurelia Metals — Investor Presentation (June 2019)
51 slides from Aurelia Metals's investor presentation, Jun 12, 2019
Slide 1: Building the Next Mid-Tier Gold and Base Metals Producer
Building the Next Mid-Tier Gold and Base Metals Producer Investor Site Visit Presentation, June 2019 ASX Code: AMI
Slide 2: Forward looking statements
Forward looking statements This presentation has been prepared by Aurelia Metals Limited (“AMI” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those
Slide 3: Corporate snapshot
Corporate snapshot ASX code: AMI Share price (11 June 2019) $0.53 Shares on issue 867.9m Major shareholders Market capitalisation A$460m Colonial First State 6.1% Van Eck 5.7% Board and management AustralianSuper 5.2% Chairman and Acting CEO Cobb Johnstone Executive Director and Michael Menzies Acti
Slide 4: Investment highlights
Investment highlights Two major processing plants Dominant position in the highly High-margin gold and base with a combined capacity of prospective Cobar Basin metals production profile approx. 1.3Mtpa Strong balance sheet: Upgrade and efficiency projects Recent drilling success A$109m cash and no d
Slide 5: Key assets
Key assets Located in the highly endowed and productive Cobar Region Bourke Endeavour Zn/Pb/Ag (CBH- Toho) Australia CSA Cu (Glencore) NSW Nyngan Cobar Peak Au/Cu/Pb/Zn Mines Cobar Nymagee Cu Project Basin Hera Au/Pb/Zn Mine Wonawinta Ag Mallee Bull Cu/Pb/Zn Project (Peel/CBH) Newcastle ORANGE Parke
Slide 6: Core strategy
Core strategy A mining-for-value approach 1 Optimise existing operations Peak contract transition and Pb/Zn circuit Mine life extension and ongoing efficiencies at Hera 2 Focus on returns Margin over volume or commodity preference Accelerating access to higher margin material for FY21 3 L
Slide 7: Building for extension and growth
Building for extension and growth Calendar 2019 a transition period dedicated to establishing a new platform March quarter impacted by reduced contribution from Chronos Au at Peak FY19 guidance: approx. 115 koz gold at AISC of approx. A$1,000 per ounce Investing in the business: Peak plant upg
Slide 8: A look at the year ahead: FY20
A look at the year ahead: FY20 Investing in the business Peak Hera Increased development rates (+80% on FY19) Reduced gold grades countered by higher base Pb/Zn circuit completion in March 2020 quarter; metals content allows 800ktpa milling across all mineral inventory Reduced unit costs and
Slide 9: The exploration value driver
The exploration value driver Significant recent drilling success Enhanced financial ability and growing geological understanding of controls on mineralisation Early stage but significant results at Federation; potential scale, polymetallic and strong grade tenor Main Southeast down-plunge inte
Slide 10: Building value
Building value 01 02 03 04 Robust operational Upgrade and Near-mine inventory Regional exploration base efficiency projects additions success Peak: 4 year Reserve life Peak Pb/Zn plant Chronos Extensions, Federation upgrade Pb/Zn Hera: 4 year Reserve life Dominion Peak contract mining
Slide 11: Building Value in the Cobar Basin
Regional foothold Highly strategic asset base in the polymetallic Cobar Basin with two major processing plants possessing a combined capacity of 1.3Mtpa Building Value in High margin output Established, high-value gold and base metals production profile the Cobar Basin Leveraging a strategic asset N
Slide 12: Peak Mines
Peak Mines 12
Slide 13: Safety at work
Safety at work Driving the focus Total Recordable Injury Frequency Rate (Rolling) and While very low severity events, recent TRIFR Monthly Injuries trend is a key focus 35.00 4 Significant change dynamics: ownership 30.00 handover, transition to contract mining 25.00 3 Key management personnel
Slide 14: Social licence to operate
Social licence to operate Targeting a positive, sustainable local operating presence Seeking strong community relationships Quarterly town hall meetings and information sessions Community Consultative Committee Funding contributions for local community projects Event volunteer support Ef
Slide 15: A stellar acquisition
A stellar acquisition Solid base with high margin highlights Payback on net A$59M purchase price within 4 months Reserves provide 4+ year life plus large Resource base delivers significant life extension potential Strong history of replenishment (we expect to replace reserve depletion in past
Slide 16: Operating improvement continuing
Operating improvement continuing Contract mining transition in March 2019 quarter Increasing underground development rates Progressive throughput ramp-up with significant unlock expected from late FY20 Successful focus on reducing external water requirements Peak Mine - Monthly Ore Milled Pe
Slide 17: Upgrade and efficiency projects
Upgrade and efficiency projects A year of transition – investing in the business Ongoing focus on increasing productivity Peak 2018 Ore Reserves1 and reducing unit operating costs Peak (Pb/Zn) Tonnes NSR Au Pb Zn Ag Cu (kt) ($/t) (g/t) (%) (%) (g/t) (%) Targeting delivery of a sustainable, long-
Slide 18: Pb/Zn circuit installation
Pb/Zn circuit installation Unlocking the high-grade base metals prize Enables treatment of high margin Pb/Zn ore at 800ktpa throughput rate Separate concentrate streams = higher payabilities Revised capital cost estimate of A$53M Increased complexity Elongated approval timeframes (now reso
Slide 19: Chronos Pb/Zn plant trial: April 2019
Chronos Pb/Zn plant trial: April 2019 Existing circuit with Chronos Pb/Zn feed 10kt ore parcel processed at 39tph Saleable Pb and Zn/bulk concentrates produced Demonstrated capability of processing under current plant setup at lower rates 19
Slide 20: Contract mining transition
Contract mining transition Driving underground efficiencies Transition to contract UG mining with PYBAR Peak lateral development metres 600 Lift underground development rates Reduce unit operating costs 500 Workforce changeover largely complete Transition to contract mining 400 from February
Slide 21: Southern mine corridor
Southern mine corridor Perseverance/Chronos Development Peak Development 21
Slide 22: Recent high-margin drilling success
Recent high-margin drilling success Delineating further high value plant feed Improved understanding of controls Enhanced ability to test for ‘repeat’ deposits Upper Chronos extension (further 100m), high value Pb/Zn material High margin Kairos (Peak Deeps) material Potential Chronos repla
Slide 23: Peak: The focus ahead
Peak: The focus ahead Delivering on the operating and revenue transition 1 Increased development rates and focus Access to more stoping blocks = higher throughput = lower overall unit costs from late FY20 2 Prioritising access to high margin ore Mining of residual Chronos Au Progressive Chro
Slide 24: Hera Mine
Hera Mine 24
Slide 25: Safety is at the core of our business
Safety is at the core of our business Continual improvement focus Significant improvement in Total Hera - Total Recordable Injury Frequency Rate (TRIFR) Recordable Injury Frequency Rate (TRIFR) 30 3 Facilitated by increased hazard reporting 25 over past 18 months 20 2 15 10 1 5 0 0 Number of inj
Slide 26: Social licence to operate
Social licence to operate Seeking to deliver mutual benefit Community a critical stakeholder Positive and supportive relationship with the Nymagee community Funding contributions to key local projects Sealing of Whitebarrow Way (last 7kms of dirt road between Hermidale & Nymagee) Nymagee t
Slide 27: Consistent performance
Consistent performance Reliable high margin output Established and now consistent performer Hera 2018 Ore Reserves1 Tonnes NSR Au Pb Zn Ag Cu Operating at approx. 480ktpa Hera (kt) (A$/t) (g/t) (%) (%) (g/t) (%) North Pod and Far West Deeps now in Reserves 1,117 256 3.05 2.84 4.36 22.7 N/A pro
Slide 28: Efficiency gains showing
Efficiency gains showing 480ktpa mill throughput Targeting gold plant recovery of 93%, post cyclone upgrade Power generated on site, with water self-sufficiency from borefields and underground workings A$/t processed Hera Mine - On-Site Unit Costs t Hera Mine Sustaining Capital Costs - process
Slide 29: Efficiency gains showing
Efficiency gains showing Throughput and gold recovery gains softening impact of head grade decline North Pod mining set to improve base metals production relative to FY19 Koz Hera Mine Hera Mine Ounces recovered vs head grade t Base metal head grade vs production 20 7.0 7.0% 7,000 Zinc productio
Slide 30: Driving productivity
Driving productivity Contract mining (Pybar) Bottom up long hole mining using waste as backfill, and Avoca style Average development requirement reduced to approx. 150m/month UG throughput capacity 480ktpa Target 3 active stoping areas open Equipment Description Quantity Development Drill
Slide 31: North Pod mining commenced
North Pod mining commenced 31
Slide 32: Three active mining fronts
Three active mining fronts 32
Slide 33: Processing layout
Falcon Jig and Processing layout Concentrate Cyanidation Concentrator Spinners to and Intensive Intensive Leach Filtration and Storage Leach Reactor Reactor Up to 70tph Froth Flotation (480ktpa) Merrill Crowe 400kW Primary & 280kW (Outotec) Roughers Circuit Secondary Tower Mill VSI/Closed Circuit an
Slide 34: Ready life extension
Ready life extension Forecast operating life expected to increase to 2023 Strong drilling results during FY19 outside of Ore Reserve and Mining Inventory boundaries (eg Upper North Pod) Reduced cost structure and lower development requirements Combination is expected to drive forecast operatin
Slide 35: Nymagee outcomes
Nymagee outcomes Exercising technical and financial prudence Metallurgy focus PFS placed on hold Recent metallurgical results Enhanced depositional understanding Higher work index (ore hardness) Re-scoping and exploration focus Potential to revisit PFS deferral decision with future exp
Slide 36: Hera: The focus ahead
Hera: The focus ahead Driving life and margin 1 Strong production and cost performance 2 Testing immediate perimeters of Hera orebody 3 Acceleration of Federation and Dominion exploration 36
Slide 37: Exploration
Exploration 37
Slide 38: The FY20 exploration strategy
The FY20 exploration strategy Investing judiciously in the drill bit A$15M approved budget (vs approx. A$8M spent in FY19) Recognition of value potential from staged investment in drilling Evidenced by success in the past year: High grade Kairos (Peaks Deeps) discovery Regional discoveries a
Slide 39: Cobar Line-of-Lode
Cobar Line-of-Lode Targeting high margin mineralisation World-class mining area with long history of discovery Prospective trend extends over 10 km Multiple high tonnage and/or high grade deposits along the full strike Focus on discovery of new high margin Peak/Perseverance-style orebodies
Slide 40: Chronos
Chronos Significant up-dip potential High margin Pb-Zn ores [Upper Chronos / Peak Deeps long section] Recent drilling extends lode more than 100 metres above current resources/reserves Very strong base metals, including: 19m at 34.1% Pb+Zn & 0.9g/t Au 15m at 35.1% Pb+Zn, 2.3g/t Au 24m at
Slide 41: Kairos (Peak Deeps) discovery
Kairos (Peak Deeps) discovery The next Chronos? Discovered early 2019 Mineralisation style similar to Chronos Directly beneath Peak decline development Very high grade intercepts, including: 16m at 71.6g/t Au & 8.5% Pb+Zn 14m at 42.9g/t Au & 13.4% Pb+Zn 23m at 25.9g/t Au & 33.2% Pb+Zn
Slide 42: Hera-Nymagee region
Hera-Nymagee region Upside potential from targeted exploration Highly prospective, under-explored corridor Dominant land-holding Strong pipeline of exploration targets within 15km of Hera Recent near mine and regional exploration success Federation Dominion Main Southeast Athena La
Slide 43: Federation discovery
Federation discovery Accelerating evaluation work Very recently discovered (April 2019) 10km south-southwest of Hera Multiple high grade intercepts include: 5m at 22.6% Pb+Zn & 3.1g/t Au 6m at 21.1% Pb+Zn & 0.3g/t Au 6m at 16.9% Pb+Zn & 0.6g/t Au New massive & semi-massive intercept at
Slide 44: Dominion discovery
Dominion discovery Oxide and sulphide potential Discovered September 2018 Gold-bearing gossan at surface Significant oxide mineralisation: 97m at 1.0% Cu, 2.4% Pb+Zn 54m at 0.9% Cu, 0.9% Pb+Zn Copper sulphides recently intercepted: 5m at 2.8% Cu & 8g/t Ag 5m at 2.2% Cu & 5g/t Ag Re
Slide 45: Hera North Pod
Hera North Pod Extending Hera’s mine life High grade Pb-Zn-Au-Ag mineralisation Highest tonnage ore source at Hera 2018/19 drilling extends lode up-dip, including: 7m at 45.1% Pb+Zn, 229g/t Ag & 1.4g/t Au 6.4m at 43.6% Pb+Zn, 263g/t Ag & 0.3g/t Au 14m at 18.3% Pb+Zn, 188g/t Ag & 0.8g/t A
Slide 46: Main Southeast Deeps discovery
Main Southeast Deeps discovery Near mine potential Very recent discovery (May 2019) Directly along trend south of Hera Initial drilling returns strong sulphide mineralisation: 23m at 7.5% Pb+Zn, incl. 8m at 14.5% Pb+Zn Open up-dip, down-dip and to the south Close to existing underground
Slide 47: Athena prospect
Athena prospect Shallow gold potential? 2.5 km southeast of Hera Mine On existing Hera Mining Lease ML1686 Significant gold-in-soil anomalism Reconnaissance RC drilling completed May 2019 Gold mineralisation intercepted in northern area: 6m at 1.7g/t Au from 86m 1m at 6.5g/t Au from 98
Slide 48: Appendix
” er Appendix - -«
Slide 49: 2018 Mineral Resources estimates
2018 Mineral Resources estimates1 Tonnes NSR Au Pb Zn Ag Cu Hera Resource Estimate (kt) (A$/t) (g/t) (%) (%) (g/t) (%) Measured 1007 248 2.6 2.7 4.2 20 N/A Indicated 951 228 2.7 2.1 3.2 17 N/A Inferred 558 239 1.7 3.5 4.7 51 N/A Total 2,516 238 2.44 2.65 3.93 25.7 N/A * Based on a $120/t NSR Cutoff
Slide 50: 2018 Ore Reserves estimates
2018 Ore Reserves estimates1 Tonnes NSR Au Pb Zn Ag Cu Hera Reserve Estimate (kt) (A$/t) (g/t) (%) (%) (g/t) (%) Total 1,117 256 3.05 2.84 4.36 22.7 N/A Peak (Au/Cu/Pb) Reserve Estimate Tonnes NSR Au Pb Zn Ag Cu (kt) (A$/t) (g/t) (%) (%) (g/t) (%) Proven 290 185 1.67 0.1 N/A 1.67 1.77 Probable 1,753
Slide 51: Competent Person(s) Statements
Competent Person(s) Statements Peak Mines Resource and Ore Reserve Estimates The resource estimates have been prepared by Chris Powell, BSc, MAuslMM, who is a full time employee of Aurelia Metals Limited. The Ore Reserves were compiled by Jim Simpson, BE Min Eng, MAusIMM, who CEO of Aurelia Metals.