Fermi Inc. · NASDAQ:FRMI

Fermi — Q3 2026 Earnings Presentation

32 slides from Fermi's earnings presentation, Nov 12, 2026

  1. Slide 1: Investor Presentation Third Quarter 2026

    Investor Presentation Third Quarter 2026 November 12, 2026 NASDAQ / LSE: FRMI

  2. Slide 2: Disclaimers: Forward-Looking Statements

    2 Disclaimers Forward-Looking Statements This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. All statements that do not relate to matters of historical fact should be considered forward-looking statements, including, witho

  3. Slide 3: Fermi America: Where AI Gets Power

    3 Fermi America: Where AI Gets Power Scale At ~8,400 acres, one of the largest advanced energy and data sites Permitted 6GW federal air permit secured; application for additional 5GW filed Power Strategy built for resilience and designed to scale to 17GW long-term Premier Competitive private power c

  4. Slide 4: Fermi by the Numbers: Private Grid with Top-Tier Power Generation Assets

    4 Fermi by the Numbers: Private Grid with Top-Tier Power Generation Assets Permitting 6 GW Air Permit Issued by TCEQ 5 GW Air Permit Filed with TCEQ Water 80% Less Water Use2 Through Closed-loop System Power 2.2 GW Total Capacity1 Up to 17 GW Power Generation at Scale Land ~8,400 Acres Acquired, Und

  5. Slide 5: How Fermi Stays Ahead of the Competition

    5 How Fermi Stays Ahead of the Competition At a time when many data center developments are stalling, Project Matador is moving forward and attracting a robust pipeline of top-tier, investment grade customers Power • 6 GW clean air permit secured / 5 GW filed Permits • Agreement with City of Amarill

  6. Slide 6: Business Model & Strategy

    Business Model & Strategy AMERICA

  7. Slide 7: The Campus: Land Once, Scale to Gigawatts

    O U R P L A C E I N T H E M A R K E T The Campus | Land Once, Scale to Gigawatts Product: private power plus land to expand on. What we solve: a place to grow over many years and multiple gigawatts P R O J E C T M A T A D O R · ~ 8 , 4 0 0 A C R E S Private power plant Turbines, gas, BESS, substatio

  8. Slide 8: Power First. Three Ways to Monetize It.

    Power First. Three Ways to Monetize It. One power platform, a menu of products for customers; we start where capital needs are lowest P O W ER One private power plant on Project Matador: turbines, gas, BESS and substation. It enables all three models below. O U R F O C U S POWERED LAND+ POWERED SHEL

  9. Slide 9: Who Does What: Fermi Scope vs. Customer Scope

    O U R B U S I N E S S M O D E L Who Does What | Fermi Scope vs. Customer Scope Fermi has three offerings; we choose by stage and by customer O U R F O C U S POWERED LAND+ POWERED SHELL TURNKEY Power Fermi Fermi Fermi Site Fermi Fermi Fermi Water, fiber, security Fermi Fermi Fermi Building Tenant Fer

  10. Slide 10: How We Make Money: Two Revenue Streams, One Triple-Net Lease

    O U R B U S I N E S S M O D E L How We Make Money | Two Revenue Streams, One Triple-Net Lease WE SELL POWER $ per kW of Gross Power WE LEASE REAL ESTATE $ per kW of IT capacity $ FIXED How we get paid Escalating, take-or-pay, 15–20 years Capacity charge FIXED · ESCALATING · TAKE-OR-PAY Return on and

  11. Slide 11: Cost and Revenue: Turnkey ~3x the Capital for ~2.4x the Revenue

    R E C E N T M A R K E T D E A L S E C O N O M I C S Cost and Revenue | Turnkey: ~3× the Capital for ~2.4× the Revenue Per MW of gross power (total facility): total range on top of each bar Cost to build, $M per MW of gross power Powered Land+ Powered Shell Turnkey Total capex (power + campus + shell

  12. Slide 12: Illustrative Value Creation per GW of Gross Power

    Illustrative Value Creation | 1 GW of Gross Power NOI ÷ cap rate = enterprise value; − debt = equity value. Per GW of gross power, IG hyperscaler, 6.0% cap rate Turnkey Powered Shell Powered Land+ 1 GW gross, IG hyperscaler $146.4 $72.0 $61.7 Fixed charges, $/kW-mo (using midpoint of market rates) $

  13. Slide 13: The Fermi Cube: Powered Land+ More Return, Less Risk

    O U R B U S I N E S S M O D E L The Fermi Cube | Powered Land+: More Return, Less Risk Bubble area to scale with capex; illustrative capex range per MW of gross power below each bubble Illustrative Return ↑ High Low ← Risk Why Powered Land+ fits today About 1/3 of Turnkey's capital: $3.9–5.1M per MW

  14. Slide 14: Project Matador Progress

    Project Matador Progress AMERICA

  15. Slide 15: Advancing the Buildout at Project Matador

    Draft – Pending Finalization Note: Stats shown are as of October 31, 2026 4.6 Miles of natural gas lines 11.3 Miles of fencing 7.2 Miles of water lines ~13.1 Million Sq. Feet (300 Acres) prepared 15 5 Gas turbines on site Advancing the Buildout at Project Matador

  16. Slide 16: Fermi Power Fleet on the Move

    16 Fermi Power Fleet on the Move Onsite In transit GE 6Bs ALL ONSITE 100% O N S I T E 6 of 6 units onsite Fleet delivered Turbines 3/3 Generators 3/3 SGT-800s 8 IN TRANSIT 33% O N S I T E 4 of 12 units onsite Turbines 0/6 +1 steam turbine onsite F-Class 1 IN TRANSIT 83% O N S I T E 5 of 6 units onsi

  17. Slide 17: A Diversified Generation Portfolio

    17 SGT6-5000F GE TM2500 Siemens SGT-800 GE Vernova FR6B Asset • Two turbines on site • One turbine awaiting transport to site in late November/early December • All three generators on site • In Houston(1) • Site work already occurring (leveling, compacting), have secured step-up and step-down transf

  18. Slide 18: Fermi Power Pipeline

    18 Fermi Power Pipeline Note: Fermi Power is total sellable power at year end at elevation. Additional power is incremental to Fermi Power, from other sources. Bar lengths drawn to a common scale (MW). 600 MW Reserved for 2027 by Major Hyperscaler Fermi Turbines Owned 2,000 MW Natural gas generation

  19. Slide 19: Financials

    Financials AMERICA

  20. Slide 20: Q3 2026 Financial Summary

    20 Q3 2026 Financial Summary $958M Debt, Net1 $1.67B Total PP&E, Net Invested $133M into PP&E in the Quarter $316M Cash and Restricted Cash Balance Sheet $55M Cash Used in Operations $142M Total G&A Expense Included Non-Cash Share-based Compensation and Advisor Fees $0.22 Net Loss per Share Net Loss

  21. Slide 21: Access to Liquidity: $1.2B of Commitments

    21 Access to Liquidity: $1.2B of Commitments Turbine Warehouse $500M • Funding for three Siemens F-class gas turbine units • A portion of proceeds were used to pay-off the term loan with Macquarie • Daily Simple SOFR plus 4.0% per annum • ~$445M outstanding as of September 30, 2026 EQUIPMENT High Vo

  22. Slide 22: Key Investment Highlights

    Experienced and Respected Leadership Team Executive team includes a blend of respected industry veterans with both technical and public company leadership expertise One of the World's Largest Advanced Energy and AI Campus Sites One of the most significant infrastructure assets providing essential po

  23. Slide 23: Appendix

    Appendix AMERICA

  24. Slide 24: Experienced and Respected Leadership Team

    Decades of experience in energy development, power generation, project management, and project finance 24 Marius Haas Chairman of the Board • Founding Partner of BayPine, which was formed in May 2020 • Extensive technology experience at Dell Technologies, Hewlett-Packard, Compaq, and Intel Corporati

  25. Slide 25: Summary of Convertible Senior Notes & Capped Call Terms

    25 Summary of Convertible Senior Notes & Capped Call Terms Base Note Terms $431.25 million Aggregate Size 5.00% per annum (payable semi-annually) Coupon July 15, 2031 (~5 years) Maturity $7.32 (Closing Price on July 9th) Reference Price ~$9.52 per share Conversion Price 30% to the Reference Price Co

  26. Slide 26: Hillcore BOOT Strategic Framework Agreement

    26 Hillcore "BOOT" Strategic Framework Agreement Build-own-operate-transfer partnership framework accelerates Fermi's speed to power advantage with an additional 2.6 GW and no additional capital or debt Up to ~2.6 GW Power capacity provided by Hillcore ~4.8 GW Total on-site generation including Ferm

  27. Slide 27: Site Overview: ~8,400 Acres Advanced Energy & AI Campus

    27 SITE OVERVIEW | 17 GW Advanced Energy & AI Campus | ~8,400 Acres, One of the Largest Sites of its Kind in the World

  28. Slide 28: Superior Positioning with Surrounding Water and Natural Gas Access

    28 Superior Positioning with Surrounding Water and Natural Gas Access 28

  29. Slide 29: Natural Gas Infrastructure

    29 Natural Gas Infrastructure Gas Pipelines Gas Pipeline Arrival Gas Pipeline Installation Project Matador sits on the intersection of major pipelines with significant natural gas infrastructure. Firm delivery of clean natural gas at gigawatt scale. 29 29

  30. Slide 30: Superior Access to Extensive, Redundant Fiber Networks

    30 Site Location Amarillo, TX Chicago, IL Chicago, IL ~15.84ms Oklahoma City, OK Oklahoma City, OK Dallas, TX Dallas, TX Denver, CO Denver, CO Phoenix, AZ Phoenix, AZ Las Vegas, NV Las Vegas, NV Reno, NV Reno, NV ~18.54ms ~23.18ms ~8.3ms ~5.02ms ~7.14ms ~20.28ms Site Location Amarillo, TX Site Locat

  31. Slide 31: Glossary

    31 Glossary Definition Term Gigawatt GW Kilowatt kW Kilowatt month kW-mo Million M Million British Thermal Units per Day MMBtu/d Milliseconds ms Megawatt MW Not Applicable N/A Net Operating Income NOI Notice to Proceed NTP Original Equipment Manufacturer OEM Round-Trip Delay RTD Square Feet Sq Ft Te

  32. Slide 32: Investor Relations

    Investor Relations Rodrigo Acuna IR@fermiamerica.com 1845 Woodall Rodgers Freeway, Suite 1100 Dallas, TX 75201-2239 www.fermiamerica.com