Rupert Resources Ltd.

Rupert Resources — Investor Presentation (April 2023)

34 slides from Rupert Resources's investor presentation, April 2023

  1. Slide 1: Advancing a High-Quality, Multi-Million Ounce Gold Discovery

    ADVANCING A HIGH-QUALITY, MULTI-MILLION OUNCE GOLD DISCOVERY Consolidated resource statement and preliminary economic assessment (PEA) RUP-TSX April 2023

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT The independent and qualified person for the Mineral Resource Estimates as defined by NI43-101 is Brian Wolfe, Principal Consultant, {All figures are in US$ unless otherwise noted} International Resource Solutions Pty Ltd. These are mineral resources not mineral reserves as they

  3. Slide 3: An "All-Weather" Discovery

    AN “ALL-WEATHER” DISCOVERY A gold deposit with the potential for exceptional returns through all cycles HIGH-QUALITY HIGH-QUALITY OUNCES; HIGH-INVESTOR RETURNS Cohesive deposit comprised of broad intervals of strong and BY DEFINITION consistent gold mineralization – low sensitivity to varying cut-of

  4. Slide 4: PEA Highlights

    PEA HIGHLIGHTS Continuing to deliver with disciplined strategy, technical rigour and value creation INDUSTRY LEADING MARGINS AND PROJECT ECONOMICS USD After 46% 2 years tax project NPV Internal using 5% discount rate rate of 1.6B and USD1650/oz return Payback Lowest quartile cost Low initial capex A

  5. Slide 5: Consolidated Resource Statement

    CONSOLIDATED RESOURCE STATEMENT Cut-off Grade Gold 2022 estimate assumptions Classification Target Area Mining Method Tonnage (Mt) Au (g/t) Au (g/t) Kg Ounces Cut-off grades determined at Open Pit 0.5 30,000,000 2.5 75,000 2,400,000 each target based on unit operating costs per tonne. Ikkari Undergr

  6. Slide 6: Discovered by Design

    DISCOVERED BY DESIGN Ikkari exploration programme in numbers $11 / $26 / $374 / resource oz resource oz recovered oz Acquisition and finding cost (since 2016)^ Of issued shareholder’s capital^ NPV per recovered ounce in 2022 PEA 73,000m 84% 6 to 8 Resources already in the Indicated Drilling metres i

  7. Slide 7: Ikkari – Near Mine Drill Targets to Be Tested in 2023

    IKKARI – NEAR MINE DRILL TARGETS TO BE TESTED IN 2023 Surface footprint of Block Model Assays multi-million ounce Au Grade (g/t) Au Grade (g/t) Kittilä mine for scale >4g/t >4g/t 3-4g/t 3-4g/t 2-3g/t 2-3g/t Heinä North 1-2g/t 1-2g/t 3.6gt Au / 10.5m 0.5-1g/t Island North 15.1g/t Au / 2m Heinä West D

  8. Slide 8: PEA Production Summary

    PEA PRODUCTION SUMMARY Years 1 to 11 LOM (22 years) Milled tonnes Million tonnes 37.9 71.6 Mill throughput Million tonnes per annum 3.5 3.5 Strip ratio Waste : Ore 3.6 4.6 Average processed gold grade Grams per tonne 2.1 1.9 Average metallurgical recovery % 95 95 Average annual gold production 000 t

  9. Slide 9: Rupert Lapland Project Economics

    RUPERT LAPLAND PROJECT ECONOMICS Project Economics Model inputs Life of mine Years 22 Gold price USD / troy ounce 1650 Net Present Value (5%) USD million 1,600 Exchange rate EUR / USD 1:1 Internal rate of return % 46 Corporate tax rate % 20 Payback Years 2.0 Capital expenditure (Initial) USD million

  10. Slide 10: Rupert Lapland Cost Breakdown

    RUPERT LAPLAND COST BREAKDOWN Initial capex USD millions Mining o/p pre-production 16.6 Process plant 131.0 Civils and infrastructure 29.5 Life of mine operating cost USD / tonne milled USD / oz Water treatment 96.4 Mining 18.1 333 Tailings 20.4 Water treatment 1.4 26 First fills & spares 10.0 Conce

  11. Slide 11: PEA NPV and IRR Sensitivity

    PEA NPV (USD MILLION) and IRR (%) SENSITIVITY Gold price USD / oz Disc Rate 1,300 1,475 1,650 1,825 2,000 0% 1,527 2,119 2,710 3,302 3,893 5% 897 1,249 1,600 1,952 2,303 8% 664 934 1,204 1,474 1,744 10 % 546 776 1,007 1,237 1,467 IRR 33% 40% 46% 52% 57% Initial capital costs Operating costs Disc Rat

  12. Slide 12: PEA Production Summary (Life of Project)

    PEA PRODUCTION SUMMARY (LIFE OF PROJECT) Ikkari OP (years 1 to 11) Ikkari UG (years 10 to 23) Pahtavaara concentrate (years 12 to 25) Thousand ounces produced per annum 300 Ikkari production 250 Pahtavaara production 200 150 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

  13. Slide 13: Ikkari After Tax Cash Flows

    IKKARI AFTER TAX CASH FLOWS Rupert Lapland Project After Tax Cash Flows - Annual & Cumulative 300,000 FREE CASHFLOW CUMULATIVE CASHFLOW 3,000,000 250,000 2,500,000 Cumulative After Tax Cash Flow US$,000 Annual After Tax Cash Flow U$,000 200,000 2,000,000 150,000 1,500,000 100,000 1,000,000 50,000 50

  14. Slide 14: Ikkari – Lowest Quartile Costs

    IKKARI – LOWEST QUARTILE COSTS 2022F Production vs. Cost of Production Moz Au | US$/oz Americas Africa Europe / CIS Australasia Global 1st Quartile 2nd Quartile 3rd Quartile 4th Quartile US$813/oz AISC US$1,090/oz AISC US$1,250/oz AISC US$1,667/oz AISC Range: US$595/oz – US$1,030/oz US$1,030/oz – US

  15. Slide 15: Ikkari vs Global Gold Projects Studies Released 2021+

    IKKARI VS Global Gold Projects Studies Released 2021+ Ratio of NPV to capital expenditure Data from press releases, investor presentations and NI 43-101 reports and Scotiabank 15 RUP-TSX

  16. Slide 16: Ikkari vs Global Gold Projects Studies Released 2021+

    IKKARI VS Global Gold Projects Studies Released 2021+ NPV (USD) per ounce produced Data from press releases, investor presentations and NI 43-101 reports and Scotiabank RUP-TSX

  17. Slide 17: 2022 Resource Block Model

    2022 RESOURCE BLOCK MODEL Troy Ounces Au 0 200000 400000 600000 800000 -50 -100 -150 -200 Meters below surface (50 meter Intervals) -250 -300 -350 -400 -450 -500 -550 -600 Metres drilled -650 Indicated -700 Resources Inferred -750 Resources -800 -850 See the Company’s November 28, 2022 press release

  18. Slide 18: Ikkari Recent Drilling Highlights

    IKKARI RECENT DRILLING HIGHLIGHTS Continuing to test the limits of mineralisation PLAN VIEWS September 2021 September 2022 Downhole intercepts and contours (grams x metres) >200 >50 Resource >150 >25 boundary 1) Long section shown is a 130m wide as shown on the plan map inset >100 >10 2) Downhole in

  19. Slide 19: Ikkari Open Pit (Years 1 to 11)

    IKKARI OPEN PIT (YEARS 1 TO 11) Cohesive deposit morphology with low strip ratio to depth of 276m 1) See the Company’s November 28, 2022 press release for further information. In compliance with National Instrument 43-101. Dr Charlie Seabrook, RPGeo., is the Qualified Person who supervised the prepa

  20. Slide 20: Ikkari Mining Highlights

    IKKARI MINING HIGHLIGHTS OPEN PIT • Minimal pre-stripping • Low initial strip ratio OP stage Strip ratio (waste:ore) 1 1.6 2 2.7 3a 5.0 3b 5.5 Total 3.6 UNDERGROUND • Sublevel caving method See the Company’s November 28, 2022 press release for further information. In compliance with National Instrum

  21. Slide 21: Flowsheet

    FlOWSHEET Recirculating load 95-98% Ikkari RoM Crushing Metallurgical recovery using SAG Mill Gravity conventional process Ball Mill Ikkari is non-refractory Stockpile 175 microns Linear Screen Coarse grinding to liberate gold MIBC Low cost option to final product PAX Na2SIO3 Flotation NaCN Lime CIL

  22. Slide 22: Site Layout

    <> RUPERT > SITE LAYOUT ? RESOURCES MAJOR CONTOURS 25m JOR CONTOURS 5m

  23. Slide 23: Ikkari - Low Emissions, High-Margin Potential

    IKKARI - LOW EMISSIONS, HIGH-MARGIN POTENTIAL GLOBAL GOLD MARKET GHG EMISSIONS 800MW power surplus in Lapland by 2030 Opportunity to develop a mine with CO2e well below industry average* (due to access to renewable power, relatively high open pit grades and processing characteristics of Ikkari mater

  24. Slide 24: De-Risking Discovery

    DE-RISKING DISCOVERY Permitting Finland has a clearly defined pathway for planning and acquiring permits Environment Baseline data collection began in 2018. The company is developing a full life cycle impact assessment Social Active engagement with key local stakeholders, regular information meeting

  25. Slide 25: Pahtavaara – Contribution in Years 12–25

    PAHTAVAARA – CONTRIBUTION IN YEARS 12 – 25 Supplementary high grade mill feed for Ikkari • 11g/t concentrate to be trucked to Ikkari mill • Average contribution of 27koz per annum over 13 years • Initial start-up capital of USD15million • USD 5 million closure bond • No plans to be included in PFS •

  26. Slide 26: 2023 Catalysts

    OUTLOOK Maintaining momentum: we are focused on unlocking the full geological and economic potential of our assets 2023 CATALYSTS IKKARI DEVELOPMENT EXPLORATION STRATEGIC Infill drilling for further resource Ikkari depth extensions Further work on low emissions reclassification potential Ongoing dri

  27. Slide 27: Continuous Focus on Value Creation and Returns

    OUTLOOK Values underpinning our company from Day 1 CONTINUOUS FOCUS ON VALUE CREATION AND RETURNS Focus on discoveries of Ensure investment is Develop sustainably and scale & quality (high accretive to valuation and plan for the long term margin and potential for maximize the return on low environme

  28. Slide 28: Appendix

    APPENDIX 28

  29. Slide 29: Capital Structure

    CAPITAL STRUCTURE CAPITAL STRUCTURE Shares on Issue 202,142,348 Gold price (USD/troy oz) Options / share units on issue 6,312,253 Rupert Resources share price (RUP - TSXV) Fully Diluted Shares 208,454,601 VanEck Junior Gold Miners ETF (GDXJ) 4.50 Market Cap (at CAD 4.50/shr) C$909M RELATIVE PERFORMA

  30. Slide 30: Central Lapland – A New "Tier 1" Destination

    CENTRAL LAPLAND – A NEW “TIER 1” DESTINATION Growing mineral inventory and established mining infrastructure Moz 2Mtpa mill Kittilä MT Au g/t CuEq % AuEq capacity AGNICO EAGLE Rupert Lapland (Ikkari and Pahtavaara) — Indicated Resources 48.3 2.5 3.9 40km Inferred Resources 20.4 1.9 1.3 — Kevitsa BOL

  31. Slide 31: Rupert Discoveries and Geological Interpretation

    RUPERT DISCOVERIES AND GEOLOGICAL INTERPRETATION RUPERT DISCOVERIES RUPERT LAPLAND PROJECT GEOLOGICAL (listed in order of discovery) INTERPRETATION AND LOCATION OF 1. Heinä South 2. Heinä North GOLD OCCURENCES 3. Heinä Central 4. Island Pahtavaara Mine & Mill 5. Saitta 6. Ikkari Ikkari and 7. Sisnak

  32. Slide 32: Ikkari Cross-Section

    IKKARI CROSS-SECTION Robust mineralisation demonstrated to at least 500m vertical 1) See the Company’s February 2, 2022 and September 19, 2022 press releases for further information. In compliance with National Instrument 43-101. Dr Charlie Seabrook, RPGeo., is the Qualified Person who supervised th

  33. Slide 33: Ikkari and Pahtavaara Resource Sensitivity

    IKKARI AND PAHTAVAARA RESOURCE SENSITIVITY See the Company’s November 28, 2022 press release for further information. In compliance with National Instrument 43-101. Dr Charlie Seabrook, RPGeo., is the Qualified Person who supervised the preparation of the scientific and technical 33 RUP-TSX disclosu

  34. Slide 34: Contact Details

    CONTACT DETAILS James Withall Chief Executive Officer jwithall@rupertresources.com Thomas Credland Head of Corporate Development tcredland@rupertresources.com Rupert Resources 82 Richmond Street East Suite 203, Toronto, Ontario M5C 1P1 RUPERTRESOURCES.COM