Slide 1: Silver Hammer Mining Corp.
<g My oe Wee SILVER HAMMER MINING CORP.
Slide 2: About Us
Silver Hammer Mining - Investor Presentation ABOUT US The Silver Hammer is a 5.5km Silver strike in the Coeur d’ Alene mining district in Idaho. This mining district is a world-class; Total district production (1884-1996) exceeds 1.1B ounces of silver with major amounts of lead, zinc and copper. A h
Slide 3: A World-Class Silver Jurisdiction
IDAHO Silver Hammer Mining - Investor Presentation A WORLD-CLASS SILVER JURISDICTION Silver Valley: ▸ The Coeur d’Alene Mining District, where Hecla (NYSE:HL) was born 125 years ago ▸ Located in North Idaho’s Silver Valley along Interstate 90 ▸ Access and infrastructure are first-rate ▸ This distric
Slide 4: The Silver Economy
THE SILVER ECONOMY HIGHLIGHTS FROM A ROBUST MARKET IN DEMAND INDSUSTRIAL AUTOMOTIVE ON THE RISE Silver climbed 137% Industrial demand for Silver in the automotive Global Silver demand is in 2020 silver +8% in 2021 market is 60M oz forecasted to increase by 15% in 2021 SILVER INVESTMENT SILVERWARE JE
Slide 5: Excellent Address
AN CLICK FOR FULL VIDEO EXCELLENT Silver Hammer Mining - Investor Presentation ADDRESS OSBURN FAULT Silver Hammer’s property package is located along one of several interpreted splays from the well-known Osburn fault / shear zone creating a structurally prepared zone extending 50 km wide SILVER VALL
Slide 6: History: Silver Strand & Burnt Cabin Mines
HISTORY SILVER STRAND & Silver Hammer Mining - Investor Presentation BURNT CABIN MINES Year Tons Au Opt Ag Opt Pb% Cu% Zn% As% Sb% Silica% 1968 253 0.045 7.8 0.40 0.05 0.70 0.65 0.24 na 1972 439 0.139 8.7 0.34 0.14 na 1.52 na 85.6 1973 330 0.090 14.6 na 0.18 na 1.56 na 87.6 1974 137 0.107 13.6 0.70
Slide 7: Historical Long Section
Mined Out No. 2 Level HISTORICAL Silver Hammer Mining - Investor Presentation Mined Out No. 225 Level LONG SECTION BLOCK 302 3919 mt 4.57 G/T AU 322 G/T AG BLOCK 300 3919 mt 4.57 G/T AU 322 G/T AG FROM NEW JERSEY MINING CORP No. 3 Level *Historical non-43-101 Compliant Resources BLOCK 400 Proposed R
Slide 8: Initial Drill Program
Silver Hammer Mining - Investor Presentation INITIAL DRILL PROGRAM Silver Hammer has designed an initial program with Phase I testing immediately below historical resource blocks between the (920 – 950 levels) up to 150 meters below the surface, followed by a target deeper and along strike to the we
Slide 9: Excellent Down Dip Potential
EXCELLENT DOWN DIP POTENTIAL Click to Play Full Video Silver Hammer Mining - Investor Presentation 9
Slide 10: VLF Magnetics with historical workings and proposed drill traces
INTER PRET ZONE ED SH PAST PRODUCING EXTE EAR ALON NSIO SILVER STRAND MINE G STR N IKE Silver Hammer Mining - Investor Presentation MAG SIGNATURE AT SILVER STRAND VLF Magnetics with historical mine workings and proposed drill traces 10
Slide 11: Mining Value
MINING VALUE Silver Hammer Mining - Investor Presentation Combining the Au and Ag values gives a value of approximately $550/ton rock (using $1800/oz gold and $25/oz silver). Traditional break even UG numbers probably hover around $200/ton rock. District is as mining friendly as anywhere on the plan
Slide 12: The Silver Hammer Team
THE SILVER HAMMER TEAM PHILIP WARWICK RON KURT MULHOLLAND SMITH BURKE HOFFMAN Chief Geologist A skilled venture capitalist With over 30 years of Considerable expertise in complex specializing in corporate experience in the minerals land transactions and acquisitions A highly respected professional f
Slide 13: Key Takeaways
KEY TAKEAWAYS Silver Hammer Mining - Investor Presentation Over past 10 years, the silver industry has been in a 500M ounce physical deficit Access is from improved dirt roads near paved highway and infrastructure Multiple Portals are accessible and have been rehabbed Silver Hammer is well positione
Slide 14: Exploration Budget
EXPLORATION BUDGET ITEM AMOUNT (CAD) Historic Data Processing – Paper to 3d $150,000 Staff – Geologists and labor $200,000 Permitting $50,000 Phase I Drilling (est. Q3 2021) 2,700m Core Drilling (Confirm and Extend Depth) $820,000 Assay – soil, rock and drilling samples $80,000 Phase II Assays $50,0
Slide 15: Thank You
Silver Hammer Mining - Investor Presentation THANK YOU! CONTACT INFO: 604-924-7225 investors@thesilverhammer.ca 15