Jzr Gold Inc. · TSXV:JZR
Jzr Gold — Investor Presentation (May 2023)
17 slides from Jzr Gold's investor presentation, May 2023
Slide 1: TSXV:JZR
TSXV:JZR
Slide 2: Delineating >5M Oz Gold Resource & Near-term Cashflow From Tailings Operation
Delineating >5M Oz Gold Resource & Near-term Cashflow From Tailings Operation
Slide 3: Vision and ESG
flow while continuing to < n and deline 000 ounce: Vision significant shareholder value and becoming an obvious M&A target for gold majors operating in the region nglo Gold) ESG Achieve environmental sustainability, community engagement and benefit, rations
Slide 4: Focused On Delivering Shareholder Value
Focused On Delivering Shareholder Value
Slide 5: Brazil Is A Tier 1 Mining Jurisdiction, With Recent M&A For Copper And Gold Assets
Brazil Is A Tier 1Mining Jurisdiction, With Recent M&A For Copper And Gold Assets In the first two decades of the 21st century, industrial mining in Brazil produced around 1,023 tonnes of gold Of this total, seven large enterprises concentrated 80% of production • Cuiabá (AngloGold Ashanti) and Morr
Slide 6: >700,000 Oz Of Au From Gold Tailings Operations At Vila Nova Project
First revenue expected in Q3, 2023 >700,000 Oz Of Au From Gold Tailings Operations At Vila Nova Project Near term cash-flow: Fully paid for gravitational mill will process high grade gold tailings at o Gold has increased in value by over in the (per ounce) past year o Physical gold demand has increa
Slide 7: Orogenic gold deposits have potential for significant size at depth
• Orogenic gold deposits have the potential for significant size at depth and are similar in nature to those found in West Africa and Ontario/Quebec. • The geological characteristics of the area have been well-established and known to support economic gold deposits, which could be useful for future
Slide 8: The Vila Nova Project is located in the Mazagão municipality of the Amapá State of Brazil
The Vila Nova Project is located in the Mazagão municipality of the Amapá State of Brazil • Operated by the national company CMA (1984 – 1995) • Initially operated as an open-pit • later developed as an underground mine, • Production: 19.96 Tonnes of gold. • The largest industrial gold mine in Amapá
Slide 9: Environmental and permitting process
Environmental and permitting process Bulk-sampling gravimetric Core drilling 18 holes, sampling, and trenching of tailings with 1,400 meters completed Two diamond drilling rigs, and two excavators Highway access, 145km from city of Macapá, major airport
Slide 10: Vila Nova Project
VILA NOVA PROJECT Rb, e ee . ; wr | Vila Nova Gold Strategic i enture royalty agreement with local o r EC! z ss Mining to earn 50% Net Profit Interest from all Net Pro’ nerated from the Vila Nova Gold Proj 4 | BX be ca (_ Vila Nova Property (— riers Significant cash-flow is expected fri with first r
Slide 11: Delineating >5M Oz Deposit
al DELINEATING >5M OZ DEPOSIT e 7 erm cash-flow from high-grade gold concentration plant from (0 million tonnes of tailings identified with grades averaging 2.7 g/t for an estimated gold content of over 700,000 ounces Fully permitted: Exploration and exploitation license in place wh allows the proce
Slide 12: Based on historical and current drilling
Based on historical and current drilling 4 exploration totaling 77 drill-holes for an Vila Ne a aggregate of 10,084 meters the following \ ivi ja Nova Go exploration potential is estimated: er EZ - p 54 Million tonnes grading 2.08 g/t ey potentially containing 3.6 Moz of gold po 92 Million tonnes gr
Slide 13: This project is advanced
. e st { : ; (led veeses. ; This project is advanced ‘ ee Vila Nova Gold | Based on historical and current drilling vie Tcuaxeba "E i: exploration totaling 77 drill-holes for an — B* ‘ii i aggregate of 10,084 meters the potential N 3 ies gold resource is estimated to be ‘ 5 | approximately 5M oz of
Slide 14: Pilot Concentration Plant
Pilot Concentration Plant Processing 800 tons/day of gold tailings The plant efficiency is >80% in recovering the metal contained Adopting a cut-off content of 2.4 per ton, with a feeding of 800 tons/day and recovery of 89% or more, we have: 800 x 3.7 x .89 = 2.63kg per day Process JSZR TSXVJZR
Slide 15: Strategic joint venture royalty agreement with local operator ECO Mining
Strategic joint venture royalty agreement with local operator ECO Mining to earn 50% Net Profit Interest from all Net Profit generated from the Vila Nova Gold Project Ownership High Grade Tailings Gold Pilot Near-Term Cashflow Workforce
Slide 16: At The Core Of Our Strategy
At The Core Of Our Strategy o Employment of local communities in o Providing safety through training the mill operation o Constant inspection of hygiene, o 15% of profits from the mill operation cleanliness and order activities in the are shared with the local mining enterprise cooperative of Vila N
Slide 17: Blue-sky Potential through Vertically-integrated Cash-flowing Gold Pilot & Exploration
Blue-sky Potential through Vertically-integrated Cash-flowing Gold Pilot & Exploration leading to Resource Expansion