Slide 1: Preliminary Results – 31 March 2013
Essar Energy plc Preliminary Results – 31 March 2013 24 June 2013 Naresh Nayyar Deepak Maheshwari Chief Executive Officer Chief Financial Officer 1

Slide 2: Disclaimer
Disclaimer This Document and any information made available orally or in writing at any presentation or delivery of this Document (together the “Materials”) do not constitute or form part of and should not be construed as, any offer or invitation to sell or issue, or any solicitation of any offer to

Slide 3: Preliminary Results – 31 March 2013 (Naresh Nayyar)
Essar Energy plc Preliminary Results – 31 March 2013 Naresh Nayyar Chief Executive Officer 3

Slide 4: Significant growth in capacity since IPO
Significant growth in capacity since IPO Refining Capacity Vadinar, India Mombasa, Kenya Stanlow, UK 800 741 Refining capacity has almost tripled Capacity in ‘000bpd 700 driven by 600 296 CAGR Expansion at Vadinar 500 59% 40 400 Acquisition of Stanlow 300 260 40 200 405 100 220 0 IPO Mar-13 Po

Slide 5: Strong revenue and EBITDA growth since IPO
Strong revenue and EBITDA growth since IPO Revenue 30,000 Oil & Gas Power 27,258 449 Strong revenue and EBITDA 25,000 growth since IPO US$ million 20,000 CAGR 58% 15,000 26,809 Full impact of expansions to 10,000 9,713 322 contribute in future periods 5,000 9,391 0 Focus moves to asset optimis

Slide 6: Highlights – 12M ended March 2013
Highlights – 12M ended March 2013 - Delivered full benefits of upgraded refinery Refining & - Completed CDR exit Marketing - - Dollarised c.US$481 million India - Secured Gujarat sales tax repayment agreement - Delivered US$2.2/bbl of sustainable margin benefits Refining & - Improvement significantl

Slide 7: Improved financial results
Improved financial results Revenue CP EBITDA 30,000 27,258 1,600 +24% 1,400 1,336 25,000 21,957 1,200 US$ million US$ million 20,000 1,000 +176% 15,000 800 10,000 600 485 400 5,000 200 0 0 15M Mar 2012 12M Mar 2013 15M Mar 2012 12M Mar 2013 CP GRM CP PBT 10 400 368 7.96 7.38 8 +79% 300 6 +141% +455%

Slide 8: Clear medium term focus
Clear medium term focus • Complete the capex programme Medium term • Optimise asset performance • Reduce net debt and interest costs Strategy priorities set • Continue to be a good corporate citizen • Margin improvements ongoing at Vadinar and Stanlow Optimise asset • Increased power capacity and Op

Slide 9: Positive economic and regulatory progress
Positive economic and regulatory progress Falling oil and gold prices will help reduce deficit Core inflation below 5% Interest rates expected to be reduced Government acting to reduce subsidies/ increase investment Gasoline prices regularly adjusted Diesel moving to market prices Gas

Slide 10: Refining & Marketing - India
Refining & Marketing - India 10

Slide 11: Vadinar Refinery – Delivering to expectations
Vadinar Refinery – Delivering to expectations World class, high complexity refinery Operating at 20 mmtpa 405,000 bpd capacity 11.8 complexity Low capital cost Total capex – US$5.3 billion Capex per bbl- US$13,152/bbl FY2013 operating costs – US$2.5/bbl Crude Throughput Crude Mix Pro

Slide 12: Improved margin performance
Improved margin performance CP GRM Indian Complex Refinery IEA Singapore Margin Vadinar Refinery 16.00 15.00 14.00 CP GRM averaged US$7.96/bbl in FY2013 11.60 12.20 12.00 10.1 9.5 9.6 10.00 8.40 8.70 US$/ bbl 7.60 9.75 8.00 6.60 7.86 9.06 6.00 4.53 4.23 4.69 3.56 3.62 4.00 2.57 2.69 2.49 1.60 1.40 1

Slide 13: Vadinar Refinery – Future focus
Vadinar Refinery – Future focus Dollarisation of debt Correct currency mismatch Reduce interest costs Extend repayment profile Increase domestic retail and bulk sales from diesel price de-regulation Complete Hydrogen Manufacturing Unit II Convert VGO Hydrotreater to mild Hydrocracker

Slide 14: Refining & Marketing - UK
| ESSAR’ ENERGY Refining & Marketing - UK , fi

Slide 15: Stanlow Refinery – Delivering to expectations
Stanlow Refinery – Delivering to expectations High quality refinery 296,000 bpd nameplate capacity, 8.2 complexity Operating at around 240,000 bpd capacity and10 complexity Low acquisition cost: US$350 million FY2013 Operating costs US$3.30/bbl Crude Throughput Crude Mix Product Mix Millio

Slide 16: Stanlow Refinery – Margin benefits delivered
Stanlow Refinery – Margin benefits delivered CP GRM 12.00 CP GRM averaged US$7.38/bbl in FY2013 9.68 7.53 8.00 7.22 US$/bbl 4.82 3.44 3.45 4.00 2.45 0.00 CY 2009 CY 2010 May'11 Q2 FY12 Q3 FY12 Q4 FY12 Q1 FY13 Q2 FY13 Q3 FY13 Q4 FY13 Delivered US$2.2/bbl of sustainable margin benefits Significant

Slide 17: Stanlow Refinery – Future focus
Stanlow Refinery – Future focus Benchmark NWE Margin Benchmark NWE Margin + US$2/bbl Benchmark NWE Margin + US$5/bbl Benchmark NWE Margin + US$6/bbl 14.00 11.54 12.00 10.09 10.00 10.54 8.45 8.49 7.75 7.54 8.00 7.20 9.09 6.63 US$/ bbl 6.09 5.54 7.45 7.49 6.00 6.75 Finance Costs 6.20 4.09 4.45 4.49 an

Slide 18: Exploration and Production
Exploration and Production 18

Slide 19: Exploration and Production
Exploration and Production Focus on unconventional gas in India Leading CBM gas player in India 2P/2C Prospective In place CBM Acreage Place Certified 2 resources Resources Unrisked Blocks (km ) Developing as a leading CBM player (bcf) (bcf) Resource (bcf) in India NSAI, Raniganj West Bengal 500

Slide 20: Exploration and Production – Future focus
Exploration and Production – Future focus Deliver Raniganj production Environment clearances and PEL* for other CBM blocks Complete CBM block minimum work programme Continue to farm down/ sell non core assets Vietnam farm down of 50% completed *Petroleum Exploration License 20

Slide 21: Power
| ESSAR’ ENERGY Power

Slide 22: Power – Delivered significant growth
Power – Delivered significant growth Capacity Generation ROE Salaya Mahan 12,000 4,500 10,017 Generation in MU 3,910 Capacity in MW 10,000 +75% 4,000 3,500 600 7,907 8,000 3,000 +220% 6,624 1,200 5,713 2,500 6,000 2,000 1,600 1,500 1,220 1,220 4,000 1,000 2,110 1,600 2,000 500 1,220 1,220 0 0 12M De

Slide 23: ROE projects
ROE projects Operating performance Future focus Generation impacted by higher gas Convert Hazira (515 MW) and Bhander prices (500 MW) to coal fired power plants Economic gas availability to remain Relocate/ sell Hazira and Bhander gas constrained turbines Complete Hazira II and Paradip

Slide 24: Salaya I
Salaya I Operating performance Future focus FY2013 generation impacted by water Improve PLF to 75% in FY2014 availability Deliver first coal from Aries mine Water redirected from Vadinar refinery Secure all clearances for dedicated Availability and Plant load factor coal import jetty/

Slide 25: Mahan
Mahan Status update Future focus Mahan ramp up impacted by coal Fuel supplies commissioning and transmission Secure short/ medium term issues economic coal supplies Secured short term/ bilateral Secure Stage II forest contracts for power sales from Unit I clearance/ sign mining lease

Slide 26: Tori I and II
Tori I and II Status update Future focus Tori development slowed pending Secure Chakla environment and regulatory progress forest clearances Secure extension to PPA start Secure Tori I unit II and Tori II dates environmental clearances Complete Tori I and Tori II projects Secure shor

Slide 27: Preliminary Results – 31 March 2013 (Deepak Maheshwari)
Essar Energy plc Preliminary Results – 31 March 2013 Deepak Maheshwari Chief Financial Officer 27

Slide 28: Financial highlights
Financial highlights 15 months 12 months US$ million ended ended % change Mar 2012 Mar 2013 Revenue 21,957 27,258 24% Operational EBITDA* 687 1,068 56% CP EBITDA 485 1,336 176% CP Profit/ (Loss) before Tax (104) 368 455% Capital Expenditure 2,761 1,193 (57%) Net debt (Underlying) 6,273 6,741 7% Gear

Slide 29: Key financial performance indicators
Key financial performance indicators CP EBITDA CP PBT 1,600 400 368 1,400 1,336 300 1,200 US$ million US$ million 200 1,000 800 100 600 485 0 369 400 -100 (45) 200 158 (104) -200 0 12M Dec 2009 12M Dec 2010 15M Mar 2012 12M Mar 2013 -300 (240) 12M Dec 2009 12M Dec 2010 15M Mar 2012 12M Mar 2013 Capi

Slide 30: Refining and Marketing – India financials
Refining and Marketing – India financials 15 months 12 months All figures in US$ million unless specified ended ended % change Mar 2012 Mar 2013 Throughput (mm bbls) 125 140 12% Revenue 15,245 16,568 9% CP GRM 4.45 7.96 79% CP EBITDA 234 824 252% Depreciation (129) (158) 23% Net Finance Costs (222)

Slide 31: Refining and Marketing – UK financials
Refining and Marketing – UK financials 15 months 12 months All figures in US$ million unless specified ended ended % change Mar 2012* Mar 2013 Throughput (mm bbls) 51 75 46% Revenue 6,354 10,240 61% CP GRM 3.06 7.38 141% CP EBITDA 12.8 317.2 2,378% Depreciation (19) (41) 120% Net Finance Costs (52)

Slide 32: Power financials
Power financials 15 months 12 months All figures in US$ million unless specified ended ended % change Mar 2012 Mar 2013 Generation (MU) 7,907 10,017 27% Revenue 357 449 26% Operational EBITDA 266 225 (16%) Depreciation (56) (77) 39% Net Finance Costs (66) (176) 166% (Loss)/ profit before tax (before

Slide 33: EBITDA: CP EBITDA
EBITDA: CP EBITDA R&M India R&M UK All figures in US$ million unless specified 12 months 12 months ended Mar ended Mar 2013 2013 CP GRM (US$ per barrel) 7.96 7.38 CP EBITDA – R&M 824 317 Impact of: Timing differences in pricing domestic products 62 (21) Time lag in crude prices (114) 0 Impact of inv

Slide 34: Income statement
Income statement 15 months ended 12 months ended US$ million Mar 2012 Mar 2013 IFRS Operational EBITDA 687 1,068 R&M – India 466 689 R&M – UK (17) 185 E&P (2) 0 Power 266 225 Corporate (27) (30) Depreciation (204) (277) Net finance costs (353) (691) Gross Finance Costs (491) (878) Finance Income 138

Slide 35: Cash flow statement
Cash flow statement 15 months ended 12 months ended US$ million 31 Mar 2012 31 Mar 2013 Cash flow from operations including tax paid 71 1,039 Net Changes in working capital 1,583 (293) Net cash generated from operating activities (A) 1,655 746 Acquisition of subsidiary, including cost of acquisition

Slide 36: Funding and liquidity
Funding and liquidity Refining & Marketing - India • Agreed 2 year Gujarat sales tax repayment schedule • Agreed Rs.50 billion, 7 year, sales tax standby facility • Secured new debt agreement following CDR exit • Approval from RBI for ECB of US$2.27 billion, already refinanced c.US$481 million throu

Slide 37: Funding and liquidity – In progress
Funding and liquidity – In progress Refining & Refining & Power Essar Energy plc Marketing - India Marketing - UK Ongoing Exploring Commitments Recently signed discussion with potential low cost available for an MOU with banks for further long term US$909 million China ECB refinancing fundin

Slide 38: Project capex programme nearing completion
Project capex programme nearing completion 15 months ended 12 months ended US$ million Mar 2012 Mar 2013 R&M – India 953 221 R&M - UK 61 108 E&P 123 220 Power 1,622 643 Corporate 1 0 Total 2,761 1,193 Indicative project capex plan 3,500 3,000 2,732 2,761 US$ million 2,500 Exact Capex to 2,000 depend

Slide 39: Gross debt and net debt position
Gross debt and net debt position 15 months 12 months All figures in US$ million unless specified ended Mar ended Mar 2012 2013 Exchange Rate (USDINR) 51 54 Gross Debt excluding working capital R&M India 3,010 3,061 R&M UK - - Power 2,797 3,002 Corporate 903 854 Gross Debt (underlying) (A) 6,710 6,91

Slide 40: Gross debt maturity profile
Gross debt maturity profile Gross debt - US$6,917 million 4,000 Oil & Gas Power Corporate 3,571 3,500 3,000 US$ million 2,500 2,002 2,000 1,477 1,500 1,003 867 507 1,000 215 133 1,569 344 270 386 500 444 464 584 0 FY2014 FY2015 FY2016 Beyond FY2016 Gross debt excludes working capital borrowing R

Slide 41: Preliminary Results – 31 March 2013 (Naresh Nayyar)
Essar Energy plc Preliminary Results – 31 March 2013 Naresh Nayyar Chief Executive Officer 41

Slide 42: Clear medium term focus
Clear medium term focus • Complete the capex programme Medium term • Optimise asset performance • Reduce net debt and interest costs Strategy priorities set • Continue to be a good corporate citizen • Margin improvements ongoing at Vadinar and Stanlow Optimise asset • Increased power capacity and Op

Slide 43: Appendix
Essar Energy plc Preliminary Results – 31 March 2013 Appendix 43

Slide 44: The Essar Group
The Essar Group Essar Group Energy Steel Infrastructure Services OIL & GAS RAW MATERIAL PROJECTS SHIPPING 2,034 mmboe reserves 2 bn tonnes of iron ore reserves Engineering, Procurement & 25 ships.8 new ships on order 34 MMTPA refining capacity* 27 MTPA pellet plants Construction 13 rigs incl.1 semis

Slide 45: Essar Energy: A unique London-listed, Indian Energy Growth Opportunity
Essar Energy: A unique London-listed, Indian Energy Growth Opportunity 1 Indian energy demand growth remains high 2 Structurally low cost, world class scaleable operations 3 Significant pipeline of organic growth projects 4 Proven execution track record in delivering and operating large scale projec

Slide 46: Crude market dynamics
Crude market dynamics Benchmark crude oil prices exhibited sharp volatility WTI Brent Dubai during the quarter. US$ / bbl 125 120 The spreads between crude oil markers showed 116 113 113 112 113 diverse movements. WTI showed exceptional 115 110 109 109 108 117 strength due to increasing flows fr

Slide 47: Product cracks
Product cracks US$/bbl Gasoil FO Jet Gasoline 23 18.8 20.17 19.27 20.17 18.2 18.19 18 15.6 15.66 16.95 16.0 19.27 19.61 15.04 17.6 17.8 17.48 14.51 16.3 15.82 16.56 17.69 13 15.4 15.35 16.39 14.6 15.09 10.75 12.42 8.84 11.8 8 10.6 10.09 6.05 9.09 5.54 7.6 3 -2 2.84 3.36 3.70 4.82 5.56 6.10 5.96 5.82

Slide 48: Significant improvement in processing capability
Significant improvement in processing capability Particulars Pre Expansion Post Expansion Capacity 14 20 Complexity 6.1 11.8 Ultra Heavy Crude (%) 20% 64% API (Density) Avg 33 27 Product Yield 68% 82% (Light & Middle distillate) Power and steam Liquid fuel and Natural Gas Coal Benchmark IEA- Singapo

Slide 49: Retail Business : An Emerging Opportunity
Retail Business : An Emerging Opportunity DODO Model Presence of Retail Outlets across India High MS potential outlets in city locations targeted for expansion• First private company in India to enter retailing of petroleum products (2003) through Franchisee model (Franchisee owned and operated RO)

Slide 50: PPA and captive prices increasing – Merchant prices to converge
PPA and captive prices increasing – Merchant prices to converge Merchant prices stabilising Merchant tariffs have fallen Rs/kwh Indian Energy Exchange (IEX) ~Rs3.5/kwh due to poor grid 12 connectivity and SEB financial 10 8 losses 6 4 Long term PPAs have moved 2 increased from ~Rs 3/kwh in 2007

Slide 51: Power demand continues to outpace supply
Power demand continues to outpace supply Capacity additions relative to targets Power sector fuel mix 25,000 Target Achieved Nuclear RES 20,359 20,502 20,623 2% 12% 20,000 17,601 17,956 Coal Hydro 14,507 57% 15,000 19% 12,039 12,161 MW 9,263 9,585 10,000 7,530 5,000 3,454 Oil 1% 0 Gas 9% FY2008 FY20

Slide 52: Fuel issues affecting operating rates
Fuel issues affecting operating rates FY 2012-13 saw the highest ever capacity FY2012-13 Capacity Addition vs. Target additions with private sector far exceeding 12,000 Target Actuals 11,257 targets 10,000 However, domestic coal shortages and change 7,250 8,000 in laws of coal exporting countrie

Slide 53: Power generation portfolio
Power generation portfolio Vadinar Mahan Mahan Coal Block - Amelia Coal Block - Vadinar MW Fuel source 73 MT 50 MT Vadinar 120 Captive fuel Mahan I MW Fuel Source P1 380 Gas P2 510 Imported coal Unit I 600 Domestic Coal Indonesia Coal Block – 64MT Unit II 600 Domestic Coal Mozambique Coal Block - 35

Slide 54: Solid base of captive power projects
Solid base of captive power projects Captive/ ROE projects – 2,500 MW Captive/ ROE based projects 3,000 Fuel risk with power purchaser 2,500 Capacity in MW 390 FY14 Payments mostly based on availability 2,000 1,500 Excellent operational track record 2,110 1,000 90%+ plant availability 500

Slide 55: Coal supply options
Coal supply options Coal GCV Rs./ Variable Cost * Total Cost (Rs./KWh) Ton Rs./ KWh = Fixed** + Variable E-Auction 3,800 4,700 3.12 4.63 Blend E-Auction/ Imported (60:40) 4,600 5,720 3.18 4.68 Blend Linkage/ Imported (60:40) 4,600 3,920 1.98 3.48 Mahan Coal Block 3,800 800 0.53 2.03 Initial strate

Slide 56: Power project update
Power project update Overall Project Progress as of Projects Other comments March 2013 LILO line (23km) and Gandhar-Hazira line Mahan – Sipat & Gandhar – Hazira line (104km) commissioned in March 2013 Transmission work under progress Mahan-Sipat (337km) 706 /942 foundations and 631 towers completed

Slide 57: Mahan mine update – Project schedule
Mahan mine update – Project schedule Start development activities 18-21 months Conditional approval Permission to enter inside area and trench to enter forest land site to cut trees cutting Start of overburden Satisfy conditions in 6 months removal/ mining and FC within next 4 months c.300 days c.60

Slide 58: Aries mine update – Project schedule
Aries mine update – Project schedule June 2012 Start of mining 9-12 months c.180 days c.270 days Q3 FY13 Q3 FY14 First Coal Received “Final” Pinjam Pakai Start of overburden Permission to enter site to cut trees removal End of Year Production 1 1.50 mmt 2 3.00 mmt 3 4.00 mmt 58

Slide 59: Other CBM blocks
Other CBM blocks Petroleum Exploration License (PEL) Raniganj Being followed up with respective Technical expertise and state government authorities Sohagpur JAMMU AND KASHMIR SRINAGAR learnings gained on Raniganj Block in MP and will be transferred to the other Chattisgarh (39km2) CBM blocks

Slide 60: Other Oil and Gas Blocks
Other Other Oil & Gas Oil and Blocks Gas blocks Ratna/R-Series (50% interest) Still pursuing final PSC award Despite Law Ministry assertion that contract is concluded, we remain in a deadlock position Still looking at options to get resolution on this block Nigeria, OPL 226 (63% interest)

Slide 61: Rupee dollar movement
Rupee dollar movement RBI Reference Quarter Closing Rate 58 56.31 56 54.78 54.92 54.39 54 53.27 52 52.70 50 48.93 51.16 48 46 44.81 44.65 44.72 44 Jun-11 Jun-12 Feb-11 May-11 Aug-11 Sep-11 Feb-12 May-12 Aug-12 Sep-12 Feb-13 May-13 Dec-10 Oct-11 Dec-11 Oct-12 Dec-12 Jan-11 Mar-11 Jul-11 Nov-11 Jan-12

Slide 62: Impact of Rupee depreciation
Impact of Rupee depreciation Refining and Marketing - India Product sales and crude purchase is dollar linked and hence GRM is linked to the dollar At 55 Rupees / US dollar Operating cost - U$2.5/bbl Interest cost - U$3.25/bbl Loan amount - U$3.1 billion (US$2.4 billion loans equivalent in R

Slide 63: Shareholder structure of Essar Energy plc
Shareholder structure of Essar Energy plc Essar Global 76.72%* 21.98% Free-float Essar Energy plc post IPO 98.27%(c) 89.50% (a)(b) 100% (d) Essar Power Essar Oil India Essar Oil UK 10.04% (a)(b) Public shareholders Notes: (a) Pre IPO, Essar Energy invested US$293.3mn via GDRs in Essar Oil which redu

Slide 64: Sponsored ADR program
Sponsored ADR program Essar Energy ADRs trade in the US over-the- Benefits of ADRs to US Investors: counter market under the following information: Symbol ERERY Clear and settle according to normal US standards CUSIP 29668A109 Offer the convenience of US dollar Ratio 1 ADR : 2 ORD stock qu
Source: Internet Archive copy of essar.com
More decks from Essar Shipping Limited.
Essar — Investor Presentation (January 2026)44 slides · January 2026
Essar — Investor Presentation (January 2026)43 slides · January 2026
Essar — Investor Presentation (January 2025)42 slides · January 2025
Essar — Investor Presentation (September 2024)43 slides · September 2024
Essar — Investor Presentation (July 2024)44 slides · July 2024
Essar — Investor Presentation (February 2024)27 slides · February 2024