Sound Energy Plc · LSE:SOU

Sound Energy — Investor Presentation (August 2022)

14 slides from Sound Energy's investor presentation, August 2022

  1. Slide 1: Near Term Infrastructure-led Appraisal & Exploration Drilling

    Near Term Infrastructure-led Appraisal & Exploration Drilling Three well campaign to target potential aggregated volumes > 1 Tcf1 August 2022 1 Internal exploration potential estimates, aggregated Pmean, unrisked Gas Initially-In-Place (gross, 100%) includes non-hydrocarbons, common examples of whic

  2. Slide 2: Disclaimer

    Disclaimer: This presentation and any additional documents handed out at any meeting (together the “Presentation Materials”) have not been approved by (i) the London Stock Exchange plc or by any authority which could be a competent authority for the purposes of the Prospectus Directive (Directive 20

  3. Slide 3: Disclaimer continued

    Disclaimer continued: Any recipient of these Presentation Materials who is in any doubt about the investment to which this presentation relates should consult an authorized person specializing in advising on investments of this kind. These Presentation Materials do not constitute a recommendation re

  4. Slide 4: Sound Energy: Fuelling the Energy Transition

    SOUND ENERGY : FUELLING THE ENERGY TRANSITION FARMOUT A POSITION IN EXPLORATION PERMITS TO FUND INFRASTRUCTURE-LED DRILLING AND SEISMIC TE-5 Horst PROGRAMMES SCALE Largest onshore operator in Morocco, proven gas basin COMMERCIALITY Substantial portfolio exposed to attractive gas markets & leading fi

  5. Slide 5: Gas Exploration: Significant potential for scalable growth

    GAS EXPLORATION: Significant potential for scalable growth 50 KM Planned Tendrara Gas Export Pipeline Gas Discovery ANOUAL TAG I Feature Palaeozoic Feature Gas Pipeline Route Licenced Areas M5 MOROCCO TE-5 Horst TE-4 Horst ALGERIA SBK-1 GREATER TENDRARA 50 KM SIDI MOKTAR Gas pipeline • Largest onsho

  6. Slide 6: Greater Tendrara & Anoual Subsurface

    GREATER TENDRARA & ANOUAL SUBSURFACE • Sub-salt seismic imaging improved by • Numerous Triassic (TAGI reservoir) fault blocks 2017/18 Sound Energy geophysical surveys remain undrilled beneath the extensive salt seal Seismic cross section image Seismic interpretation Slide Subsurface model 3 Salt sea

  7. Slide 7: Greater Tendrara Permit: Appraisal of TE-4 Horst

    GREATER TENDRARA PERMIT: Appraisal of TE-4 Horst Greater Tendrara Exploration Permit • Simple structure, fault Term 8 years from October 2018 block partially investigated Parties Sound Energy 75% (operator), ONHYM 25% Area 14,411 km 2, 8 wells drilled to date by the TE-4 well drilled in All work com

  8. Slide 8: Greater Tendrara Permit: Appraisal of SBK-1

    GREATER TENDRARA PERMIT: Appraisal of SBK-1 Seismic interpretation Greater Tendrara Exploration Permit SBK-1 Fault • Faulted anticline, drilled by SBK-1 Term 8 years from October 2018 (2000) by previous operator Parties Sound Energy 75% (operator), ONHYM 25% Area 14,411 km 2, 8 wells drilled to date

  9. Slide 9: Anoual Permit: Exploration of M5 Prospect

    ANOUAL PERMIT: Exploration of M5 Prospect Anoual Exploration Permit NW SE Term 9 years from August 2017 M5 Parties Sound Energy 75% (operator), ONHYM 25% Area 8,873 km 2, only 1 well drilled to date in permit area Commitments 1 well commitment to be completed before December 2022 Key Subsurface Poin

  10. Slide 10: Greater Tendrara & Anoual: Appraisal & Exploration Summary

    GREATER TENDRARA & ANOUAL: Appraisal & Exploration Summary 50 KM Planned Tendrara Gas Export Pipeline Gas Discovery ANOUAL TAG I Feature Palaeozoic Feature Gas Pipeline Route Licenced Areas M5 TE-5 Horst TE-4 Horst SBK-1 GREATER TENDRARA Appraisal and Exploration Opportunity Summary Unrisked Volume

  11. Slide 11: Sidi Moktar Permit: Seismic to mature leads to drillable prospects

    SIDI MOKTAR PERMIT: Seismic to mature leads to drillable prospects Sidi Moktar Exploration Permit Term 10 years from April 2018 Parties Sound Energy 75% (operator), ONHYM 25% Area 4,712 km 2, 44 wells drilled Commitments 500 kms of 2D seismic & well abandonment before October 2022 Key Subsurface Poi

  12. Slide 12: Exploration Summary

    EXPLORATION SUMMARY FARMOUT A POSITION IN EXPLORATION PERMITS TO FUND OUR INFRASTRUCTURE-LED DRILLING AND SEISMIC PROGRAMMES GREATER TENDRARA & ANOUAL DRILLING Drilling campaign targeting aggregated > 1 Tcf1 in a proven gas basin Commercialisation through developing infrastructure centred on the TE-

  13. Slide 13: Glossary of terms

    Glossary of terms Bcf Billion Standard Cubic Feet With respect to resources categorization, the most realistic assessment of quantities of petroleum if only a single result were reported. If probabilistic Best Estimate methods are used (e.g. Monte Carlo Simulation), there should be at least a 50% pr

  14. Slide 14: For further information please contact

    For further information please contact: questions@soundenergyplc.com chairman@soundenergyplc.com Slide 11 Disclaimer: The investment mentioned in this document may not be suitable for all recipients or be appropriate for their personal circumstances. The information in this document is believed to b