Eve Health — Energy Ventures — Investor Presentation (February 2012)

20 slides from Eve Health's investor presentation, Feb 23, 2012

  1. Slide 1: ASX cover letter: Investor Presentation February 2012

    LEVEL ONE 8COLINSTREET WEST PERTH WA 6005 For personal use only POBOX886 WEST PERTH WA 6872 TEL:+61 8 6465 5500 FAX:+61 8 6465 5599 ABN 89 106 523 611 23 February 2012 The Manager ASX Market Announcements ASX Limited Exchange Centre, 20 Bridge Street Sydney NSW 2000 Via electronic lodgement Dear

  2. Slide 2: Aurora Uranium Project, USA – Progress Update

    Aurora Uranium Project, USA For personal use only Progress Update February 2012

  3. Slide 3: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by and issued by Energy Ventures Limited (“Energy Ventures”, “EVE” or the “Company”) to assist it in informing interested parties about the Company and its progress. It should not be considered as an offer or invitation to subscrib

  4. Slide 4: Uranium market outlook

    Uranium market outlook For personal use only Downturn after Fukushima short-lived, fundamentals still strong Emerging markets demand more power and nuclear is still in the mix Nuclear expansion continues, driven by Asian demand: 62 reactors under construction, 156 planned, 343 currently proposed Chi

  5. Slide 5: USA strategic advantages

    USA strategic advantages For personal use only 104 operational nuclear reactors, capacity 100 GWe, ~20% of the US energy supply US EIA forecast 11% increase in nuclear power generation by 2035, including 10 GWe new capacity and additional reactor uprates Huge federal loan guarantees, increased R&D,

  6. Slide 6: Uranium project locations

    Uranium project locations For personal use only

  7. Slide 7: Aurora uranium project

    Aurora uranium project For personal use only Volcanic hosted uranium deposit in southeast Oregon, USA Well defined resource base of 38 Mlb U3O8 at 248 ppm eU3O8 Higher grade zone of 18 Mlb at 444 ppm eU3O8 Near surface, flat-lying geometry amenable to low stripping ratio open pit mine New metallurgi

  8. Slide 8: Project location

    Project location For personal use only Company base at McDermitt Strong local relationships Excellent infrastructure 272 federal lode claims (unpatented) ~1,700 acres development area Historical mining area Mainly federal lands administered by BLM, some State land

  9. Slide 9: Long section and geology

    Long section and geology For personal use only

  10. Slide 10: Drilling status

    Drilling status For personal use only 32 diamond drill holes completed for >9,200 feet PQ drilling Uranium grades and continuity confirmed Near surface mineralisation in flat-lying zones amenable to open pit mine Significant widths suggest potential for low stripping ratios Representative samples co

  11. Slide 11: Resource summary

    Resource summary For personal use only Resource of 38 Mlb @ 248 ppm eU3O8* Indicated Resource Inferred Resource Total Resource eU3O8 Mlb eU3O8 Mlb eU3O8 Mlb Resource Zone Mt Mt Mt ppm eU3O8 ppm eU3O8 ppm eU3O8 High Grade Zone1 18.4 444 18.0 - - - 18.4 444 18.0 Low Grade Zone2 47.3 179 18.7 3.6 151 1

  12. Slide 12: Site overview

    Site overview For personal use only Drilling Aurora deposit Processing Overburden access tracks and open pit area plant* stockpile* * Conceptual location only

  13. Slide 13: Conceptual open pit

    Conceptual open pit For personal use only Ground IP chargeability data 1,600 m Collected 1989 for Placer-Dome Reprocessed 2010 Untested anomaly at SE end of deposit 500 m

  14. Slide 14: Project development

    Project development For personal use only Diamond drilling program has confirmed resource grade and continuity, and provided new metallurgical samples Resource update in progress, incorporating recent EVE diamond drilling and newly acquired historical data (>100 drill holes) Preliminary metallurgica

  15. Slide 15: Metallurgical testing

    Metallurgical testing For personal use only Scrubbing and wet screening tests on composite drill core samples Separation of approximately 30% of the sample as a hard, coarse material containing around 10% of total uranium. Scrubbing attrition resulting in around 55% of total uranium mineralisation r

  16. Slide 16: Metallurgical testing results

    Metallurgical testing results For personal use only 30% of sample separated as coarse, low- grade material Potential for bulk mining of deposit and rejection of waste, with minimal U loss Upgrading of remaining mineralisation prior to leaching Potential reduction in crushing and grinding requirement

  17. Slide 17: Aurora project outlook

    Aurora project outlook For personal use only Potential for development in approximately 24 month timeframe, dependent on permitting process Low cost mining possible due to soft sedimentary rock overburden and low stripping ratio Simple ore scrubbing beneficiation process to upgrade mineralisation Ex

  18. Slide 18: 2012 EVE rights issue

    2012 EVE rights issue For personal use only Non-renounceable rights issue to existing eligible shareholders Details of offer: 1 for 7.5 pro-rata basis Issue price 3.5c ~45.2 million new shares Offer opened on 15th Feb and closes on 7th March Expected to raise $1.58m before costs if all entitlements

  19. Slide 19: 12 month development strategy

    6 month development strategy For personal use only Complete an update of resource estimate Advance feasibility studies with focus on mineralisation leaching characteristics and overall process circuit Initiate formal permitting process with US State and Federal authorities by submission of a Notice

  20. Slide 20: Corporate structure & management

    Corporate structure & management For personal use only Capital Structure (ASX) Board of Directors Ordinary Shares: 339,065,669 Alasdair Cooke, Executive Chairman Options: 17,410,000 Lachlan Reynolds, Managing Director Market Cap: A$17.6 million (31 Jan 2012) Bill Fry, Executive Director Cash & Liqui