Slide 1: Labrador Iron Mines – Sustaining the Environment: Redmond Creek Fish Habitat Compensation Project
Labrador Iron Mines – Sustaining the Environment: Redmond Creek Fish Habitat Compensation Project

Slide 2: Fish Habitat Compensation Project: Moving a Section of the Unnamed Tributary
Fish Habitat Compensation Project Moving a Section of the Unnamed Tributary James Mine Unnamed Tributary • Re-design of James South pit » To access additional ore » Address pit wall stability

Slide 3: Fish Habitat Compensation Project
Fish Habitat Compensation Project Unnamed Tributary James Mine

Slide 4: James Pit Re-Design
James Pit Re-Design The re-design of the James South Pit was required due to two concerns: 1. Structural Integrity of the Pit Wall: • The Pit perimeter was approximately 20 m from a section of the unnamed tributary • The organic layer was much deeper than anticipated and the material lacked the requ

Slide 5: James Pit Expansion
James Pit Expansion

Slide 6: Unnamed Tributary Prior to Dewatering
Unnamed Tributary Prior to Dewatering

Slide 7: Fish Habitat Compensation Project Impact
Fish Habitat Compensation Project Impact Unnamed Tributary Affected Habitat : • 31 m2 of spawning habitat • 222 m2 of rearing habitat; and • 5,409 m2 of adult habitat

Slide 8: Fisheries Authorization - DFO
Fisheries Authorization - DFO An Off Set Plan was approved by DFO to compensate for loss of 5,662 m2 of fish habitat. Predicted Productivity ratio 4 : 1, therefore 1,500 m2 (15 units) of compensatory fish (brook trout) habitat were required to offset the loss

Slide 9: Fish Habitat Compensation Site: Redmond Creek
Fish Habitat Compensation Site: Redmond Creek Site Selection Criteria: Within the same watershed Same fish species Accessibility Habitat Enhancement Potential Existing information on water quality and resident fish species Selected Site: Redmond Creek met all criteria

Slide 10: Fish Habitat Compensation Site: Redmond Creek
Fish Habitat Compensation Site: Redmond Creek

Slide 11: Redmond Creek Channel Plan and Profile
Redmond Creek Fish Habitat Compensation Channel Plan and Profile

Slide 12: Start of Construction August 8, 2013
Fish Habitat Compensation Project Start of Construction August 8, 2013

Slide 13: August 16, 2013
August 16, 2013 Laydown Area Pumpi2 Access Road qt - Pump 1 Downstream CotferD: = et nas : ) ‘ma 3 Upstréam Coffer Dams Ee Diversion Channel-

Slide 14: August 23, 2013
am<ofte SE ee s 3 ,Upstre Diversion}Ghannel}e ve) = :

Slide 15: September 6, 2013
SS September 6, 2013 == - Laydown Area Pump 2 ti Coffer, D dane Coe oe eh fes Im Undercut ee ee Se 500mm Hbadlder Stockpile Pump 1 Se Upstream Bones Dam _ Soon. Diversion Channel

Slide 16: September 14, 2013
September 14, 2013

Slide 17: September 19, 2013
_ September 19, 2013 Sos TA, Oe

Slide 18: Completion of Construction September 24, 2013
Completion of Construction September 24, 2013

Slide 19: Redmond Creek July, 2015
Redmond Creek July, 2015

Slide 20: Redmond Creek Revegetation August, 2015
Redmond Creek Revegetation August, 2015

Slide 21: Fish Habitat Compensation Project Results
Fish Habitat Compensation Project Results: 46 m2 of spawning habitat; 313 m2 of rearing habitat; and, 1141 m2 of adult habitat. Other features include: Addition of substrates for spawning and rearing of target species in the riffle/runs; Provision of undercut bank structures and root wads

Slide 22: Follow up Monitoring
Fish Habitat Compensation Project Follow up Monitoring: 2014, 2015, 2016, 2018 & 2020: • Habitat stability and quality • Structural integrity and substrate distribution • Discharge • Riparian vegetation • Biological response • Water quality • Benthic productivity • Fish productivity

Slide 23: Results to Date
Fish Habitat Compensation Project Results to Date The Report on the field studies completed in 2014 and 2015 concluded that: “the benthic invertebrate population is becoming established and that fish are utilizing the created habitat. The physical parameters of the stream indicated that the need

Slide 24: Environmental Policy and Guiding Principles
Environmental Policy and Guiding Principles Labrador Iron Mines Limited (LIM) is committed to conducting operations in an environmentally responsible manner by maintaining a high standard of environmental responsibility and performance. Our goal is to minimize the environmental footprint at all oper
Source: Internet Archive copy of labradorironmines.ca
More decks from Labrador Iron Mines Holdings Ltd.
Investor Presentation (June 2022)26 slides · June 2022
Technical Presentation (March 2021)29 slides · March 2021
Investor Presentation (November 2017)31 slides · November 2017
Investor Presentation (January 2017)32 slides · January 2017
Technical Presentation (May 2016)28 slides · May 10, 2016
Investor Presentation (2015)31 slides · Dec 1, 2015