Slide 1: Developing Ontario's next gold mine
Developing Ontario’s next gold mine. September 2018 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: Madsen Gold Project
Pure Gold Mining MADSEN GOLD PROJECT There is a global scarcity of near-term, high grade, quality gold projects in mining friendly jurisdictions. Madsen is one of a select few. We aim to build a long life mine with highly attractive economics. We have a strong foundation. Madsen is extremely well pl
Slide 4: Team, Grade, Jurisdiction
Pure Gold Mining MADSEN GOLD PROJECT TEAM Owners team in place with expert technical knowledge Madsen Project mineral resources – 1,744,000 ozs at 8.7 g/t Gold GRADE in 6.24 Mt Indicated and 296,000 ozs at 7.9 g/t Gold in 1.16 Mt Inferred(1) JURISDICTION Red Lake, Ontario, Canada – an established mi
Slide 5: Company Builders
Pure Gold Mining COMPANY BUILDERS Extensive experience in project execution, operations, exploration, and capital markets with vision to become Canada’s next iconic gold company EXECUTIVE MANAGEMENT BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Terrane Metals,
Slide 6: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at September 1, 2018) Key Shareholders (2) Shares Outstanding 256.3 million Management & Directors 3.2% Warrants Strategic Shareholders 28.2% Exercise price $0.85 until May 24, 14.5 million AngloGold Ashanti 14.9% 2020 expiry Evanachan (Robert
Slide 7: Madsen Gold Project, Red Lake Mining District
Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT Madsen Gold Project 2.45 million oz HISTORICAL PRODUCTION (1) 1.74 million oz INDICATED RESOURCE (1) 0.30 million oz INFERRED RESOURCE (1) Current Project Mineral Resources(1): 1,744,000 ozs at 8.7 g/t Gold in 6.24 Mt Indicated 296,000 ozs at 7.
Slide 8: Madsen Development Plan
Red Lake Mining District MADSEN DEVELOPMENT PLAN Production Scalable Exploration MADSEN MINE RUSSET SOUTH / FORK / +5km GOLD SYSTEM DFS and underground WEDGE / MADSEN Multiple targets with near development in progress Three new satellite deposits surface gold mineralization; Production decision in Q
Slide 9: Current Mineral Resource
Madsen Gold Project CURRENT MINERAL RESOURCE Grade Contained Gold Deposit Classification Tonnes g/t Au (oz.) Madsen Indicated 5,785,000 8.9 1,648,000 Madsen Inferred 587,000 9.4 178,000 Fork Indicated 194,000 6.5 40,000 Fork Inferred 255,000 5.8 47,000 Russet South Indicated 259,000 6.7 56,000 Russe
Slide 10: Low Capital, High Margin
Madsen Gold Project LOW CAPITAL, HIGH MARGIN 2017 PEA(1) Project Attributes High grade 10.3 g/t • • 14 year mine life HEAD GRADE • Low initial capital Low permitting risk 0.91 million • • Scalable operation with potential for expansions OZ GOLD LIFE OF MINE • Skilled workforce, locally sourced ~$51M
Slide 11: Infrastructure in Place
Madsen Gold Project INFRASTRUCTURE IN PLACE 200 m 9
Slide 12: Definitive Feasibility Study on Track
Madsen Gold Project DEFINITIVE FEASIBILITY STUDY ON TRACK Operational Readiness Installation of surface and underground infrastructure to service Madsen ramp complete Completed exploration drift and extended ramp by 87 linear metres Commenced test mining with lateral development on proposed st
Slide 13: Bulk Sample in Progress
Madsen Gold Project BULK SAMPLE IN PROGRESS • Targeting initial mining shapes that will underpin early years of production at Madsen • Recent drilling has defined a wide mineralized structure with strong vertical and lateral continuity • Highlights:(1) • 232.4 g/t gold over 5.2 m • 13.0 g/t gold ove
Slide 14: Bulk Sample in Progress: Test Mining Program
Madsen Gold Project BULK SAMPLE IN PROGRESS A’ Test Mining Program • Test mining to demonstrate continuity, validate the model and provide geotechnical support of the ongoing definitive feasibility study • Extensive sampling program in place including muck samples from each round, two chip sampling
Slide 15: Growth Through Exploration
Madsen Gold Project GROWTH THROUGH EXPLORATION 3 NEW SATELLITE DEPOSITS 14 DRILL READY TARGETS 47 KM2 LAND PACKAGE section • 3rd largest land package in Red Lake • Large high grade gold system that spans more than a five kilometre strike length • Controls on mineralization well understood • Wedge de
Slide 16: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION (1) Further details are set out in the NI 43-101 technical report “Technical Report for the Madsen Gold Project - Restated Preliminary Economic Assessment and Initial Satellite Deposit Mineral Resource Estimates” with an effective date of
Slide 17: Satellite Deposits - Expansion
Madsen Gold Project SATELLITE DEPOSITS - EXPANSION 2017 Satellite Resources, update in progress 96,000 118,000 OZ GOLD INDICATED OZ GOLD INFERRED • Russet South and Fork deposits outcrop and are open for expansion, both located approximately 1.5 km from existing milling infrastructure • Targeted gol
Slide 18: +5km Expansive Mineral System
Madsen Property +5km EXPANSIVE MINERAL SYSTEM Oblique View Looking East Wedge Fork Fork Madsen McVeigh PG18-564 19.9 g/t Au/ Starratt 3.3m Russet PG16-198 Starratt South 34.0 g/t Au/ 11.0m Austin PG17-456 34.6 g/t Au/ 4.3m 8 Zone Significant AD-11-01 Gold Mineralized System, Scale Potential 14.3 g/t
Slide 19: Low Capital Hurdle
Pure Gold Mining LOW CAPITAL HURDLE Initial Project Capital vs. IRR 1400 Initial Project Capital (C$) Midas 1200 Bubble size represents market cap 1000 800 Falco 600 Continental Sabina 400 Victoria Eastmain Almaden Pure 200 Equinox Dalradian Gold IDM Harte 0 0 5 10 15 20 25 30 35 40 45 50 After-Tax
Slide 20: Emerging Canadian Developer
Madsen Gold Project EMERGING CANADIAN DEVELOPER Development • Definitive feasibility study completion Q4 2018 • Environmental baseline work to support operational permitting • Test Mining and Bulk Sample Completion Q4 2018 • Engineering Studies – Evaluate Russet South, Fork, Wedge • Production decis
Slide 21: Highlights
HIGHLIGHTS • Mining friendly jurisdiction • Clear permitting path, benefits from existing permits • Proven large high-grade gold system • Low capital intensity project with significant infrastructure in place • Resource update planned – Q4 2018 • Feasibility study completion – Q4 2018 • Initial engi
Slide 22: Corporate Inquiries: Darin Labrenz
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca