  1. Slide 1: Renewable Energy in Southeast Europe

    TSX-V: REO RENEWABLE ENERGY IN SOUTHEAST EUROPE June 2010

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains forward-looking statements and factual information that are current as of the date the presentation was originally delivered. Reservoir Capital Corp., and its subsidiaries disclaim any intention or obligation to update or revise any forward-looki

  3. Slide 3: Company Overview

    Company Overview  Reservoir Capital Corp (REO.V) is a hydro-focused renewable energy company based in Southeast Europe, with a development portfolio comprising of 88 MW of hydroelectric projects in Serbia and identification of an extensive development pipeline.  Brodarevo 1 (25MW) and Brodarevo 2

  4. Slide 4: Why Hydro Power?

    Why Hydro Power?  Clean, safe, no fuel, reliable, renewable and provide long-term cashflow.  A proven technology in use for over a century and currently providing about 20% of the world's electricity.  Consumption is expected to double by 2030, primarily in developing countries, which is also whe

  5. Slide 5: Why Southeast Europe?

    Why Southeast Europe?  The EU wants 20% of its power from renewable sources by 2020.  Predominance of wind and solar (intermittent power), so 33% of the power base (currently 16%) needs to be renewable to get to the 20% production target.  Utilities and grids need hydro projects to maintain grid

  6. Slide 6: Attractive Incentive Programs

    Attractive Incentive Programs EU Renewable Energy Requirements United Kingdom Sweden Spain Slovenia Slovak Republic Serbia – preferential rates guaranteed for 12 years, Romania €110/MW for geothermal and €110- Portugal Poland €150/MW for hydro (<10MW). Bilateral The Netherlands agreement to export g

  7. Slide 7: Reservoir Capital Strategy

    Reservoir Capital Strategy  Mission: To build a profitable renewable energy company in Southeast Europe.  Active development pipeline of 88MW of hydro projects in Southwest Serbia.  Form strategic partnerships to facilitate the development of Serbian projects.  Organic growth plans in Serbia, Bo

  8. Slide 8: Project Overview

    Project Overview Hydro - Portfolio Brodarevo 1 – Run of River (Lim River, Serbia)  24.6MW Optimized Design  Design Flow of 143m3/s  Head of 21.5m  43.65% Capacity Factor  GWh/year 96.97 Brodarevo 2 – Run of River (Lim River, Serbia)  30.6MW Optimized Design Brodarevo Dam Location  Design Flow

  9. Slide 9: Brodarevo 1 and 2 Projects

    Brodarevo 1 and 2 Projects  Pre-Feasibility studies nearing completion. Dam sites and conceptual designs defined, detailed engineering and costing in progress.  Optimization has increased capacity to 55MW (was 48MW), with estimated production of approximately 220GWh/yr (was 189GWh/yr).  Framework

  10. Slide 10: Vrutci

    Vrutci  Existing 240m-long, 77m-high dam. Water reservoir contains 64Mm3 and is surplus to the requirements of the town of Uzice for which it was built.  An Energy License application has been filed with the Ministry of Energy, prepared with and supported by local community and State grid company.

  11. Slide 11: Project Overview

    Project Overview Geothermal- Active Portfolio Vranjska Banja – southern Serbia  Permit covers 17.5km2  2 existing geothermal wells in the area  Geothermal resources indicate: – Flow rate of approx. 25 l/sec – Outflow temp. range of 83 ̊C- 105 ̊C Vojvodina Province – northern Serbia  3 exploratio

  12. Slide 12: Strong Management

    Strong Management  Miles Thompson, Executive Chairman – ex-Gold Fields, +25 years natural resource project management and M&A in emerging markets.  Miljana Vidovic, President – ex-Manager Business Development for Tractebel Engineering (EDF Suez Group) in Southeast Europe.  Milan Cusic, Deputy Dir

  13. Slide 13: Capital Structure

    Capital Structure 0 TSX- V: REO Issued Shares 30.6 M Options 2.94 M • Treasury sufficient to fund through 2010; Feasibility Warrants 14.1 M Studies on Brodarevo, Pre- Feasibility Studies on Vrutci and Fully Diluted Shares 47.6 M geothermal exploration programs. Cash Position ~$3.0 M Management Owner

  14. Slide 14: Reservoir Capital Investment Case

    Reservoir Capital Investment Case  Growing hydropower development portfolio.  Opportunities for both significant organic and acquisition-led growth.  Negotiating strategic partnership with Torno to facilitate the development of Serbian projects.  Growing regional political, technical and financi